| 1 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 92,488 | LF |
$0.6500 |
$0.4300 |
$0.4000 |
| 2 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 272 | LF |
$1.70 |
$4.00 |
$5.00 |
| 3 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 257 | LF |
$10.00 |
$15.00 |
$15.00 |
| 4 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 6 | EA |
$100.00 |
$250.00 |
$100.00 |
| 5 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 95,045 | LF |
$0.4700 |
$0.5900 |
$0.5000 |
| 6 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 1,577 | LF |
$1.20 |
$0.6100 |
$5.00 |
| 7 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 5,157 | LF |
$12.00 |
$4.00 |
$8.00 |
| 8 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 154 | EA |
$200.00 |
$250.00 |
$75.00 |
| 9 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 217,916 | LF |
$0.2500 |
$0.0200 |
$0.1500 |
| 10 | 857(F) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 140 | EA |
$20.00 |
$65.00 |
$50.00 |
| 11 | 857(F) 8008 |
PAVEMENT MARKING REMOVAL(WORDS) | 20 | EA |
$20.00 |
$65.00 |
$120.00 |
| 12 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$18,655.00 |
$15,000.00 |
| 13 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$21,745.00 |
$18,000.00 |