| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$6,275.00 |
$50,000.00 |
$18,500.00 |
$195,000.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,000 | LF |
$2.75 |
$2.65 |
$4.50 |
$10.00 |
$5.35 |
| 3 | 230(A) 2806 |
SOLID SLAB SODDING | 2,000 | SY |
$7.50 |
$3.15 |
$4.00 |
$10.00 |
$29.25 |
| 4 | 509(B) 0321 |
CLASS A CONCRETE | 12 | CY |
$650.00 |
$275.00 |
$1,000.00 |
$500.00 |
$240.00 |
| 5 | 802(A) 8316 |
3" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 500 | LF |
$40.00 |
$80.00 |
$63.00 |
$68.00 |
$67.00 |
| 6 | 802(C) 8551 |
1 1/2" HIGH DENSITY PE PIPE - BORED | 4,051 | LF |
$17.00 |
$16.50 |
$2.50 |
$60.00 |
$18.68 |
| 7 | 802(C) 8556 |
1 1/2" HIGH DENSITY PE PIPE - TRENCHED | 18,052 | LF |
$4.50 |
$5.50 |
$2.50 |
$10.00 |
$18.68 |
| 8 | 802(C) 8565 |
1 1/2" HIGH DENSITY PE PIPE - PLOWED | 73,475 | LF |
$3.00 |
$3.00 |
$5.50 |
$2.75 |
$3.63 |
| 9 | 803(B) 8135 |
GROUND BOX (R3248) | 27 | EA |
$1,000.00 |
$815.00 |
$2,000.00 |
$1,000.00 |
$1,475.00 |
| 10 | 803(B) 8150 |
GROUND BOX (B2-48) | 15 | EA |
$1,250.00 |
$1,118.00 |
$2,500.00 |
$1,500.00 |
$2,465.00 |
| 11 | 804(B) 2916 |
REINFORCING STEEL | 360 | LB |
$15.00 |
$19.00 |
$2.00 |
$38.00 |
$12.00 |
| 12 | 818(A) 8733 |
(SP)FIBER OPTIC CABLE, 144 SMF | 140,785 | LF |
$2.00 |
$0.5000 |
$1.50 |
$1.00 |
$1.60 |
| 13 | 818(B) 8760 |
(SP)FIBER OPTIC PATCH PANEL, 144 PORT | 1 | EA |
$2,000.00 |
$10,500.00 |
$10,000.00 |
$28,000.00 |
$1,985.00 |
| 14 | 818(D) 8740 |
(SP)FIBER OPTIC CABLE TERMINATION | 144 | EA |
$125.00 |
$45.15 |
$100.00 |
$312.00 |
$47.75 |
| 15 | 818(F) 8370 |
(SP) SHIELD ISOLATION PEDESTAL | 5 | EA |
$450.00 |
$1,040.00 |
$300.00 |
$3,000.00 |
$218.00 |
| 16 | 818(F) 8375 |
(SP) SHIELD ISOLATION PEDESTAL (MINI) | 14 | EA |
$400.00 |
$1,040.00 |
$275.00 |
$1,200.00 |
$2,218.00 |
| 17 | 818(G) 5570 |
(SP)FIBER OPTIC ROUTE SIGN & INSTALLATION | 183 | EA |
$100.00 |
$80.00 |
$150.00 |
$75.00 |
$116.00 |
| 18 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 140 | SD |
$16.00 |
$130.00 |
$200.00 |
$112.00 |
$100.00 |
| 19 | 880(I) 8902 |
FLAGGER | 35 | SD |
$100.00 |
$41.00 |
$350.00 |
$220.00 |
$52.00 |
| 20 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$6,370.00 |
$10,000.00 |
$52,000.00 |
$25,000.00 |
| 21 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 140 | SD |
$16.00 |
$31.50 |
$75.00 |
$120.00 |
$100.00 |
| 22 | 802(A) 8316 |
3" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 550 | LF |
$50.00 |
$65.00 |
$63.00 |
$50.00 |
$67.00 |
| 23 | 802(C) 8551 |
1 1/2" HIGH DENSITY PE PIPE - BORED | 3,138 | LF |
$17.00 |
$16.50 |
$2.50 |
$70.00 |
$18.68 |
| 24 | 802(C) 8556 |
1 1/2" HIGH DENSITY PE PIPE - TRENCHED | 45,156 | LF |
$4.50 |
$4.50 |
$2.50 |
$10.00 |
$18.68 |
| 25 | 803(B) 8150 |
GROUND BOX (B2-48) | 7 | EA |
$1,250.00 |
$1,118.00 |
$2,500.00 |
$1,500.00 |
$2,465.00 |
| 26 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$7,250.00 |
$5,000.00 |
$75,000.00 |
$55,000.00 |
| 27 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$125,000.00 |
$47,675.00 |
$290,000.00 |
$60,000.00 |
$75,000.00 |