SAFETY IMPROVEMENT (FIBER OPTIC CABLE) US-59: FROM POTEAU EXTEND NORTH TO SALLISAW . PROJECT LENGTH = 36.186 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED , HOWEVER, ALL BIDDERS WILL BE REQUIRED TO PROVIDE VERIFICATION OF EXPERIENCE PRIOR TO REC
Let date Thursday, February 16, 2012
Contract 120071
J/P numbers 28128(48) District
County Leflore, Sequoyah
Highway
Limits SAFETY IMPROVEMENT (FIBER OPTIC CABLE) US-59: FROM POTEAU EXTEND NORTH TO SALLISAW . PROJECT LENGTH = 36.186 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED , HOWEVER, ALL BIDDERS WILL BE REQUIRED TO PROVIDE VERIFICATION OF EXPERIENCE PRIOR TO REC Project number BTOP-240A(001)
Bidders 10
# Contractor Total bid vs estimate vs low
EE Engineer's estimate $2,479,517
1
BEAR COMMUNICATIONS, LLC Low bidder
$1,242,465
-49.9%
2
ROHL NETWORKS, LP
$1,617,192
-34.8%
+30.2%
3
ERVIN CABLE CONSTRUCTION
$2,306,090
-7.0%
+85.6%
4
EWING SIGNAL CONSTRUCTION
$2,615,145
+5.5%
+110.5%
5
UNITEK GLOBAL SERVICES DBA ADVANCED COMMUNICATIONS USA, LLC
$2,654,509
+7.1%
+113.6%
6
B & H CONSTRUCTION, LLC.
$2,674,895
+7.9%
+115.3%
7
WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
$2,859,890
+15.3%
+130.2%
8
TRANS-TEL CENTRAL, LLC
$3,277,507
+32.2%
+163.8%
9
AMERICAN DIRECTIONAL BORING,INC.
$3,748,092
+51.2%
+201.7%
10
THE FISHEL COMPANY
$5,657,121
+128.2%
+355.3%
Bid tab: unit prices 25 items ExcelCSV Print
Seq Bid code Description Qty Unit Estimate
#1 BEAR COMMUNICAT… #2 ROHL NETWORKS, … #3 ERVIN CABLE CON… #4 EWING SIGNAL CO… #5 UNITEK GLOBAL S… #6 B & H CONSTRUCT… #7 WILDCAT CONSTRU… #8 TRANS-TEL CENTR…
1 201(A) 0102
CLEARING AND GRUBBING 1 LSUM
$30,000.00
$13,125.00
$5,500.00
$10,000.00
$18,000.00
$5,500.00
$20,000.00
$80,000.00
$1,912.17
2 221(C) 2801
TEMPORARY SILT FENCE 2,000 LF
$2.50
$4.49
$5.10
$5.75
$5.20
$3.78
$5.00
$5.00
$5.00
3 230(A) 2806
SOLID SLAB SODDING 2,000 SY
$2.50
$6.37
$6.00
$6.95
$4.15
$4.25
$5.00
$4.00
$5.00
4 509(B) 0321
CLASS A CONCRETE 14.08 CY
$650.00
$139.41
$250.00
$500.00
$315.00
$155.55
$500.00
$1,500.00
$147.26
5 802(A) 8316
3" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 4,331 LF
$20.00
$63.51
$69.95
$65.00
$100.00
$111.56
$60.00
$60.00
$78.52
6 802(A) 8318
3" GALV. STEEL ELECTRICAL CONDUIT PUSHED OR BORED 100 LF
$25.00
$16.16
$62.50
$79.50
$65.00
$44.21
$100.00
$60.00
$142.90
7 802(C) 8551
1 1/2" HIGH DENSITY PE PIPE - BORED 13,254 LF
$15.00
$10.75
$14.15
$45.50
$18.00
$24.10
$60.00
$21.00
$28.45
8 802(C) 8556
1 1/2" HIGH DENSITY PE PIPE - TRENCHED 52,362 LF
$3.50
$3.69
$8.21
$8.50
$13.00
$11.07
$9.00
$21.00
$11.69
9 802(C) 8565
1 1/2" HIGH DENSITY PE PIPE - PLOWED 118,220 LF
$2.00
$2.29
$2.46
$3.50
$6.00
$6.49
$3.75
$5.00
$8.34
10 803(B) 8135
GROUND BOX (R3248) 48 EA
$2,500.00
$975.14
$975.00
$1,500.00
$1,145.00
$948.64
$1,000.00
$1,500.00
$3,144.24
11 803(B) 8150
GROUND BOX (B2-48) 22 EA
$3,000.00
$1,073.68
$1,350.00
$1,500.00
$1,400.00
$1,136.59
$1,000.00
$1,800.00
$1,671.00
12 804(B) 2916
REINFORCING STEEL 264 LB
$2.25
$5.54
$3.60
$8.50
$2.15
$4.54
$49.00
$0.8500
$1.75
13 818(A) 8730
(SP)FIBER OPTIC CABLE, 96 SMF 208,221 LF
$6.25
$0.6600
$0.8500
$0.9800
$0.8000
$0.7500
$0.5000
$0.7000
$0.9600
14 818(A) 8739
(SP) FIBER OPTIC CABLE, 48 INDOOR/OUTDOOR PLENUM 600 LF
$8.66
$2.08
$0.8500
$9.50
$0.5000
$4.60
$80.00
$3.50
$8.80
15 818(B) 8755
(SP)FIBER OPTIC PATCH PANEL, 96 PORT 1 EA
$1,600.00
$1,914.49
$1,675.00
$1,900.00
$2,145.00
$7,697.30
$25,000.00
$6,000.00
$1,960.66
16 818(D) 8740
(SP)FIBER OPTIC CABLE TERMINATION 192 EA
$100.00
$230.67
$36.05
$65.00
$42.00
$574.26
$312.50
$40.00
$47.34
17 818(F) 8370
(SP) SHIELD ISOLATION PEDESTAL 5 EA
$325.00
$224.11
$101.40
$295.00
$250.00
$192.12
$6,000.00
$260.00
$75.00
18 818(F) 8375
(SP) SHIELD ISOLATION PEDESTAL (MINI) 8 EA
$150.00
$244.45
$175.00
$125.00
$200.00
$144.42
$2,000.00
$230.00
$146.24
19 818(G) 5570
(SP)FIBER OPTIC ROUTE SIGN & INSTALLATION 255 EA
$150.00
$87.95
$70.33
$95.00
$53.00
$52.62
$75.00
$75.00
$55.39
20 876(A) 8482
(PL)TRUCK MOUNTED ATTENUATOR 150 SD
$16.00
$39.38
$150.00
$162.00
$130.00
$425.00
$160.00
$15.00
$108.35
21 880(I) 8902
FLAGGER 35 SD
$100.00
$206.25
$275.00
$400.00
$68.25
$192.00
$400.00
$400.00
$326.20
22 880(J) 8905
CONSTRUCTION TRAFFIC CONTROL 1 LSUM
$10,000.00
$10,828.13
$13,200.00
$14,850.00
$28,500.00
$25,000.00
$75,000.00
$22,500.00
$78,717.57
23 882(A) 8306
PORT.CHANGEABLE MESSAGE SIGN 150 SD
$16.00
$19.69
$102.00
$200.00
$90.00
$90.54
$100.00
$10.00
$57.36
24 220 2800
SWPPP DOCUMENTATION AND MANAGEMENT 1 LSUM
$7,500.00
$8,381.25
$10,000.00
$11,050.00
$12,145.00
$3,650.00
$60,000.00
$5,000.00
$10,964.93
25 641 1552
MOBILIZATION 1 LSUM
$141,881.76
$5,000.00
$14,500.00
$60,000.00
$150,000.00
$1.00
$75,000.00
$165,000.00
$378,023.23
Showing the first 8 bidders. The Excel and CSV downloads include all 10.