Bid tab 120069

Let Jan 19, 2012 · · Atoka, Coal, Pontotoc Sign up free

‹ Jan 2012 results

SAFETY IMPROVEMENTS (FIBER OPTIC CABLE) US-75/SH-3/SH-99: FROM THE CITY OF ADA TO THE CITY OF ATOKA . PROJECT LENGTH = 45.12 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED , HOWEVER, BIDDERS WILL BE REQUIRED TO PROVIDE VERIFICATION OF EXPERIENCE

Let date
Thursday, January 19, 2012
Contract
120069
J/P numbers
28128(51)
District
County
Atoka, Coal, Pontotoc
Highway
Limits
SAFETY IMPROVEMENTS (FIBER OPTIC CABLE) US-75/SH-3/SH-99: FROM THE CITY OF ADA TO THE CITY OF ATOKA . PROJECT LENGTH = 45.12 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED , HOWEVER, BIDDERS WILL BE REQUIRED TO PROVIDE VERIFICATION OF EXPERIENCE
Project number
BTOP-203N(002)

Bidders 7

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,836,239
1 ROHL NETWORKS, LP Low bidder $2,512,263 -11.4%
2 B & H CONSTRUCTION, LLC. $2,551,434 -10.0% +1.6%
3 TRANS-TEL CENTRAL, LLC $2,801,819 -1.2% +11.5%
4 WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES $3,542,525 +24.9% +41.0%
5 MASTEC NORTH AMERICA, INC. $4,847,338 +70.9% +92.9%
6 THE FISHEL COMPANY $4,981,021 +75.6% +98.3%
7 MICHELS CORPORATION $5,876,457 +107.2% +133.9%

Bid tab: unit prices 29 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 ROHL NETWORKS, …#2 B & H CONSTRUCT…#3 TRANS-TEL CENTR…#4 WILDCAT CONSTRU…#5 MASTEC NORTH AM…#6 THE FISHEL COMP…#7 MICHELS CORPORA…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $30,000.00 $9,250.00 $10,000.00 $34,962.77 $105,000.00 $44,000.00 $32,954.07 $25,000.00
2221(C) 2801 TEMPORARY SILT FENCE2,500LF $2.50 $3.90 $5.00 $4.52 $3.50 $5.00 $6.90 $15.00
3230(A) 2806 SOLID SLAB SODDING2,500SY $2.50 $3.60 $5.00 $4.17 $3.50 $20.00 $6.37 $15.00
4509(B) 0321 CLASS A CONCRETE12.73CY $650.00 $2.50 $500.00 $144.68 $1,200.00 $875.00 $3,446.40 $1,200.00
5802(A) 8316 3" GALV. STEEL ELECTRICAL CONDUIT EXPOSED150LF $20.00 $107.60 $60.00 $106.93 $76.90 $100.00 $163.28 $200.00
6802(A) 8318 3" GALV. STEEL ELECTRICAL CONDUIT PUSHED OR BORED150LF $25.00 $75.75 $60.00 $139.18 $60.00 $100.00 $57.36 $300.00
7802(C) 8551 1 1/2" HIGH DENSITY PE PIPE - BORED20,567LF $15.00 $50.55 $37.34 $13.08 $18.00 $44.00 $28.44 $90.00
8802(C) 8556 1 1/2" HIGH DENSITY PE PIPE - TRENCHED13,588LF $3.50 $15.50 $13.54 $9.46 $18.00 $47.00 $28.74 $45.00
9802(C) 8565 1 1/2" HIGH DENSITY PE PIPE - PLOWED215,178LF $2.00 $3.55 $3.72 $5.81 $10.00 $10.90 $12.20 $11.00
10802(D) 8375 4" ALUMINUM CONDUIT (EXPOSED)195LF $20.00 $103.25 $50.00 $106.93 $76.90 $100.00 $163.28 $200.00
11803(B) 8135 GROUND BOX (R3248)55EA $2,500.00 $980.30 $1,000.00 $1,027.33 $1,800.00 $1,700.00 $3,399.20 $1,500.00
12803(B) 8150 GROUND BOX (B2-48)19EA $3,000.00 $1,376.06 $1,500.00 $1,678.55 $2,000.00 $1,300.00 $5,522.41 $2,000.00
13804(B) 2916 REINFORCING STEEL216LB $2.25 $3.60 $23.15 $1.70 $1.00 $32.00 $63.56 $30.00
14818(A) 8715 (SP)FIBER OPTIC CABLE, 24 SMF2,450LF $3.00 $0.8800 $0.4000 $1.08 $1.10 $2.75 $1.38 $1.50
15818(A) 8730 (SP)FIBER OPTIC CABLE, 96 SMF245,092LF $6.33 $0.8800 $0.4000 $0.9000 $0.6000 $1.20 $1.58 $0.8500
16818(A) 8739 (SP) FIBER OPTIC CABLE, 48 INDOOR/OUTDOOR PLENUM550LF $8.66 $0.8800 $27.27 $8.20 $0.3500 $25.00 $32.21 $20.00
17818(B) 8745 (SP)FIBER OPTIC PATCH PANEL, 24 PORT2EA $600.00 $442.29 $3,750.00 $880.00 $3,000.00 $1,900.00 $708.81 $10,000.00
18818(B) 8755 (SP)FIBER OPTIC PATCH PANEL, 96 PORT3EA $1,600.00 $1,653.80 $2,500.00 $1,555.56 $7,500.00 $2,350.00 $3,169.87 $20,000.00
19818(C) 8735 (SP)FIBER OPTIC CABLE SPLICE76EA $125.00 $87.87 $592.11 $57.13 $50.00 $65.00 $724.77 $55.00
20818(D) 8740 (SP)FIBER OPTIC CABLE TERMINATION224EA $100.00 $36.05 $267.86 $47.25 $70.00 $35.00 $44.52 $80.00
21818(F) 8370 (SP) SHIELD ISOLATION PEDESTAL5EA $325.00 $101.40 $1,500.00 $75.94 $250.00 $1,200.00 $372.77 $750.00
22818(F) 8375 (SP) SHIELD ISOLATION PEDESTAL (MINI)12EA $150.00 $55.60 $625.00 $123.23 $250.00 $325.00 $372.77 $750.00
23818(G) 5570 (SP)FIBER OPTIC ROUTE SIGN & INSTALLATION191EA $150.00 $70.33 $50.00 $67.94 $60.00 $85.00 $175.31 $100.00
24876(A) 8482 (PL)TRUCK MOUNTED ATTENUATOR190SD $16.00 $138.00 $105.26 $105.53 $85.00 $150.00 $879.76 $110.00
25880(I) 8902 FLAGGER45SD $100.00 $55.00 $333.34 $320.17 $300.00 $860.00 $943.67 $3,600.00
26880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $10,000.00 $21,850.00 $100,000.00 $106,149.96 $7,750.00 $11,000.00 $43,870.89 $20,000.00
27882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN190SD $16.00 $57.50 $105.26 $55.87 $85.00 $150.00 $106.16 $110.00
28220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $7,500.00 $4,100.00 $101,837.52 $10,679.05 $750.00 $120,000.00 $16,306.28 $10,000.00
29641 1552 MOBILIZATION1LSUM $131,808.97 $22,500.00 $126,000.00 $523,186.75 $197,500.00 $75,000.00 $85,743.77 $100,000.00