‹ Jan 2012 results
SAFETY IMPROVEMENTS (FIBER OPTIC CABLE) US-183: FROM THE CITY OF CLINTON TO THE CITY OF SEILING. PROJECT LENGTH = 47.08 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED , HOWEVER, BIDDERS WILL BE REQUIRED TO PROVIDE VERIFICATION OF EXPERIENCE PRIOR
Let date Thursday, January 19, 2012
Contract 120060
J/P numbers 28128(26) District
County Custer, Dewey
Highway
Limits SAFETY IMPROVEMENTS (FIBER OPTIC CABLE) US-183: FROM THE CITY OF CLINTON TO THE CITY OF SEILING. PROJECT LENGTH = 47.08 MILES PREQUALIFICATION FOR THIS PROJECT HAS BEEN WAIVED , HOWEVER, BIDDERS WILL BE REQUIRED TO PROVIDE VERIFICATION OF EXPERIENCE PRIOR Project number BTOP-220N(002)
Bidders 9
# Contractor Total bid vs estimate vs low
EE Engineer's estimate $3,050,294
1
HENKELS & MCCOY GROUP, INC. Low bidder
$1,335,179
-56.2%
2
ROHL NETWORKS, LP
$1,463,020
-52.0%
+9.6%
3
B & H CONSTRUCTION, LLC.
$1,873,104
-38.6%
+40.3%
4
MASTEC NORTH AMERICA, INC.
$2,475,276
-18.9%
+85.4%
5
SPALJ CONSTRUCTION
$2,538,543
-16.8%
+90.1%
6
WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES
$2,680,437
-12.1%
+100.8%
7
TRANS-TEL CENTRAL, LLC
$3,037,569
-0.4%
+127.5%
8
MICHELS CORPORATION
$3,049,759
0.0%
+128.4%
9
THE FISHEL COMPANY
$3,245,334
+6.4%
+143.1%
Bid tab: unit prices 29 items ExcelCSV Print
Seq Bid code Description Qty Unit Estimate
#1 HENKELS & MCCOY… #2 ROHL NETWORKS, … #3 B & H CONSTRUCT… #4 MASTEC NORTH AM… #5 SPALJ CONSTRUCT… #6 WILDCAT CONSTRU… #7 TRANS-TEL CENTR… #8 MICHELS CORPORA…
1 104 0900
RAILROAD FLAGGING 32 HOUR
$200.00
$275.31
$100.00
$100.00
$250.00
$450.00
$200.00
$111.24
$85.00
2 201(A) 0102
CLEARING AND GRUBBING 1 LSUM
$40,000.00
$3,297.24
$4,795.00
$9,865.95
$50,000.00
$50,000.00
$35,000.00
$49,902.80
$5,000.00
3 221(C) 2801
TEMPORARY SILT FENCE 2,000 LF
$2.50
$8.86
$3.90
$5.00
$5.35
$3.25
$3.00
$4.52
$15.00
4 230(A) 2806
SOLID SLAB SODDING 2,000 SY
$2.50
$8.45
$3.60
$5.00
$29.25
$3.00
$3.00
$4.17
$15.00
5 509(B) 0321
CLASS A CONCRETE 11.52 CY
$650.00
$1,084.07
$250.00
$500.00
$240.00
$675.00
$1,200.00
$144.68
$1,000.00
6 802(A) 8316
3" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 100 LF
$20.00
$68.13
$62.40
$20.00
$67.00
$50.00
$50.00
$69.53
$200.00
7 802(A) 8318
3" GALV. STEEL ELECTRICAL CONDUIT PUSHED OR BORED 100 LF
$25.00
$32.58
$62.50
$20.00
$67.00
$40.00
$60.00
$500.71
$200.00
8 802(C) 8551
1 1/2" HIGH DENSITY PE PIPE - BORED 15,171 LF
$15.00
$10.57
$10.31
$29.90
$15.68
$10.50
$32.00
$13.08
$40.00
9 802(C) 8556
1 1/2" HIGH DENSITY PE PIPE - TRENCHED 13,768 LF
$3.50
$4.19
$8.21
$9.83
$15.68
$10.50
$32.00
$9.33
$20.00
10 802(C) 8565
1 1/2" HIGH DENSITY PE PIPE - PLOWED 232,655 LF
$2.00
$2.31
$2.46
$2.28
$4.48
$6.35
$3.70
$5.69
$4.80
11 802(D) 8375
4" ALUMINUM CONDUIT (EXPOSED) 2,392 LF
$20.00
$68.13
$62.50
$50.00
$67.00
$50.00
$50.50
$69.53
$85.00
12 803(B) 8135
GROUND BOX (R3248) 63 EA
$2,500.00
$851.29
$880.30
$1,000.00
$1,475.00
$1,300.00
$1,800.00
$1,027.33
$1,070.00
13 803(B) 8150
GROUND BOX (B2-48) 18 EA
$3,000.00
$1,269.09
$1,276.06
$1,500.00
$2,465.00
$1,700.00
$2,000.00
$1,678.55
$1,415.00
14 804(B) 2916
REINFORCING STEEL 207 LB
$2.25
$3.70
$3.60
$24.15
$12.00
$11.50
$2.50
$1.70
$30.00
15 818(A) 8715
(SP)FIBER OPTIC CABLE, 24 SMF 3,526 LF
$3.00
$0.3500
$0.8800
$1.42
$0.9000
$0.5500
$1.15
$1.08
$1.50
16 818(A) 8730
(SP)FIBER OPTIC CABLE, 96 SMF 268,560 LF
$6.33
$0.5000
$0.8800
$0.3700
$0.9000
$0.5500
$0.8000
$0.9000
$0.8500
17 818(A) 8738
(SP) FIBER OPTIC CABLE, 24 INDOOR/OUTDOOR PLENUM 100 LF
$6.00
$14.33
$0.8800
$50.00
$6.49
$0.5500
$0.4500
$5.43
$20.00
18 818(B) 8745
(SP)FIBER OPTIC PATCH PANEL, 24 PORT 2 EA
$600.00
$508.09
$442.29
$5,000.00
$2,610.00
$2,500.00
$3,700.00
$880.02
$7,000.00
19 818(B) 8755
(SP)FIBER OPTIC PATCH PANEL, 96 PORT 4 EA
$1,600.00
$2,446.98
$1,653.80
$7,500.00
$1,985.00
$3,000.00
$10,500.00
$1,555.56
$12,000.00
20 818(D) 8740
(SP)FIBER OPTIC CABLE TERMINATION 200 EA
$100.00
$24.69
$36.05
$150.00
$47.75
$37.00
$100.00
$47.25
$70.00
21 818(F) 8370
(SP) SHIELD ISOLATION PEDESTAL 5 EA
$325.00
$186.75
$101.40
$2,000.00
$2,218.00
$200.00
$250.00
$75.94
$600.00
22 818(F) 8375
(SP) SHIELD ISOLATION PEDESTAL (MINI) 12 EA
$150.00
$112.42
$55.60
$833.34
$2,218.00
$180.00
$250.00
$123.23
$600.00
23 818(G) 5570
(SP)FIBER OPTIC ROUTE SIGN & INSTALLATION 358 EA
$150.00
$83.80
$70.33
$50.00
$116.00
$85.00
$60.00
$67.94
$100.00
24 876(A) 8482
(PL)TRUCK MOUNTED ATTENUATOR 180 SD
$16.00
$104.94
$143.75
$83.33
$100.00
$130.00
$200.00
$105.53
$110.00
25 880(I) 8902
FLAGGER 45 SD
$100.00
$96.62
$63.25
$200.00
$52.00
$75.00
$300.00
$320.17
$3,600.00
26 880(J) 8905
CONSTRUCTION TRAFFIC CONTROL 1 LSUM
$10,000.00
$6,172.84
$15,525.00
$90,000.00
$20,000.00
$15,000.00
$7,500.00
$100,563.12
$10,000.00
27 882(A) 8306
PORT.CHANGEABLE MESSAGE SIGN 180 SD
$16.00
$104.94
$69.00
$83.33
$100.00
$65.00
$85.00
$55.87
$110.00
28 220 2800
SWPPP DOCUMENTATION AND MANAGEMENT 1 LSUM
$7,500.00
$7,407.41
$2,850.00
$30,000.00
$55,000.00
$8,000.00
$750.00
$10,679.05
$10,000.00
29 641 1552
MOBILIZATION 1 LSUM
$157,388.98
$29,527.66
$14,100.00
$120,000.00
$75,000.00
$160,000.00
$157,500.00
$551,362.95
$50,000.00
Showing the first 8 bidders. The Excel and CSV downloads include all 9.