| 1 | 202(D) 4781 |
UNCLASSIFIED BORROW (TOPSOIL) | 1,000 | CY |
$5.00 |
$8.60 |
$10.07 |
| 2 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,600 | TON |
$62.00 |
$75.80 |
$97.43 |
| 3 | 412 5267 |
COLD MILLING PAVEMENT | 1,000 | SY |
$3.00 |
$5.40 |
$5.29 |
| 4 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 200 | LF |
$15.00 |
$25.75 |
$31.73 |
| 5 | 623(C) 5202 |
BEAM GUARDRAIL THRIE-BEAM SINGLE | 25 | LF |
$30.00 |
$32.25 |
$63.47 |
| 6 | 623(E) 7113 |
BEAM GUARDRAIL TRANSITION SECTION | 4 | EA |
$1,500.00 |
$129.00 |
$4,014.39 |
| 7 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$2,255.00 |
$1,835.30 |
| 8 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 25 | LF |
$5.00 |
$64.50 |
$52.89 |
| 9 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$67,128.48 |