| 1 | 202(G) 0185 |
EARTHWORK | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$65,000.00 |
$40,000.00 |
| 2 | 223 2801 |
TEMPORARY SILT FENCE | 1,120 | LF |
$1.50 |
$1.80 |
$2.25 |
$2.07 |
| 3 | 230(A) 2806 |
SOLID SLAB SODDING | 20,000 | SY |
$1.50 |
$1.28 |
$1.25 |
$1.04 |
| 4 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.8 | AC |
$400.00 |
$300.00 |
$375.00 |
$357.55 |
| 5 | 303 5912 |
AGGREGATE BASE | 5,303 | TON |
$26.00 |
$26.80 |
$24.00 |
$40.00 |
| 6 | 311(D) 0154 |
PROCESSING EXISTING BASE & SURFACE, METHOD D | 126.18 | STA |
$600.00 |
$575.00 |
$250.00 |
$475.00 |
| 7 | 327(E) 4240 |
(SP)CEMENTITIOUS STABILIZED SUBGRADE | 32,776 | SY |
$3.00 |
$2.40 |
$3.42 |
$1.45 |
| 8 | 403(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 449 | TON |
$28.00 |
$25.00 |
$23.50 |
$32.50 |
| 9 | 407 0250 |
TACK COAT | 3,850 | GAL |
$2.50 |
$3.00 |
$2.25 |
$4.00 |
| 10 | 411(S3) 5945 |
(SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) | 10,228 | TON |
$65.00 |
$61.05 |
$68.00 |
$65.75 |
| 11 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 3,830 | TON |
$69.00 |
$63.50 |
$72.00 |
$67.25 |
| 12 | 426(C) 5097 |
FLY ASH | 1,660 | TON |
$60.00 |
$55.00 |
$75.00 |
$95.00 |
| 13 | 509(B) 0321 |
CLASS A CONCRETE | 10 | CY |
$350.00 |
$550.00 |
$175.00 |
$275.00 |
| 14 | 609(B) 1514 |
1'-8" COMB. CURB & GUTTER (8" BARRIER) | 1,650 | LF |
$22.00 |
$18.00 |
$25.43 |
$27.25 |
| 15 | 613(D) 0690 |
24" CORR. GALV. STEEL PIPE | 743 | LF |
$30.00 |
$30.00 |
$27.82 |
$59.75 |
| 16 | 613(D) 0691 |
30" CORR. GALV. STEEL PIPE | 72 | LF |
$35.00 |
$37.00 |
$65.87 |
$75.00 |
| 17 | 613(D) 0692 |
36" CORR. GALV. STEEL PIPE | 24 | LF |
$45.00 |
$45.00 |
$59.64 |
$89.75 |
| 18 | 613(D) 0694 |
48" CORR. GALV. STEEL PIPE | 50 | LF |
$55.00 |
$71.00 |
$78.42 |
$135.00 |
| 19 | 613(M) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 34 | EA |
$400.00 |
$425.00 |
$118.16 |
$215.00 |
| 20 | 613(M) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$450.00 |
$525.00 |
$258.47 |
$415.00 |
| 21 | 613(M) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$500.00 |
$595.00 |
$332.32 |
$550.00 |
| 22 | 613(M) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$600.00 |
$950.00 |
$706.85 |
$1,100.00 |
| 23 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,650 | LF |
$4.50 |
$5.00 |
$6.55 |
$6.75 |
| 24 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 11 | EA |
$200.00 |
$150.00 |
$140.69 |
$76.62 |
| 25 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 166.68 | SF |
$15.00 |
$20.00 |
$21.89 |
$20.43 |
| 26 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 336 | LF |
$7.00 |
$4.50 |
$4.92 |
$4.60 |
| 27 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 12,600 | LF |
$0.5000 |
$0.7600 |
$0.8300 |
$0.7800 |
| 28 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$4,600.00 |
$5,033.57 |
$4,850.00 |
| 29 | 642 0098 |
STAKING | 1 | LSUM |
$10,000.00 |
$42,500.00 |
$37,000.00 |
$25,000.00 |
| 30 | 220 2800 |
(SP)SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$10,000.00 |
$5,500.00 |
$3,000.00 |
| 31 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$45,000.00 |
$10,000.00 |
$35,000.00 |
$100,000.00 |