| 1 | 501(G) 6315 |
CLSM BACKFILL | 24 | CY |
$150.00 |
$315.00 |
$330.00 |
$300.00 |
$157.50 |
$250.00 |
| 2 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 3 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 90 | LF |
$35.00 |
$28.00 |
$27.50 |
$25.00 |
$26.25 |
$30.00 |
| 4 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 3.4 | GAL |
$80.00 |
$92.00 |
$88.00 |
$80.00 |
$84.00 |
$100.00 |
| 5 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 6 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 7 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 8 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$115,913.00 |
$140,750.00 |
$260,000.00 |
$435,000.00 |
$169,104.00 |
$260,085.00 |
| 9 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$33,118.00 |
$500.00 |
$1,000.00 |
$30,000.00 |
$30,160.00 |
$65,021.00 |
| 10 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 14 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 11 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 3,658 | SF |
$100.00 |
$82.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 12 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 421 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 13 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 15 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 14 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 15 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 15 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 16 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$93,912.00 |
$110,000.00 |
$110,000.00 |
$108,000.00 |
$142,480.00 |
$90,242.00 |
| 17 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$26,832.00 |
$2,000.00 |
$1,000.00 |
$10,000.00 |
$24,960.00 |
$22,561.00 |
| 18 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 527 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 19 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 59 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 21 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$408,275.00 |
$255,000.00 |
$310,000.00 |
$128,000.00 |
$191,360.00 |
$118,216.00 |
| 22 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$116,650.00 |
$4,000.00 |
$1,000.00 |
$10,000.00 |
$33,280.00 |
$29,554.00 |
| 23 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 7 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 24 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 7 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 25 | 501(G) 6309 |
CLSM BACKFILL | 9 | CY |
$150.00 |
$165.00 |
$330.00 |
$300.00 |
$157.50 |
$250.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 27 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$91,007.00 |
$120,000.00 |
$100,000.00 |
$108,000.00 |
$137,280.00 |
$118,216.00 |
| 28 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$26,002.00 |
$2,000.00 |
$1,000.00 |
$10,000.00 |
$24,960.00 |
$29,554.00 |
| 29 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 6 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 30 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 6 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 31 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 32 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$237,300.00 |
$250,000.00 |
$300,000.00 |
$268,000.00 |
$345,280.00 |
$433,022.00 |
| 33 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$67,800.00 |
$4,000.00 |
$1,000.00 |
$15,000.00 |
$61,360.00 |
$108,255.00 |
| 34 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 35 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$57,400.00 |
$69,700.00 |
$80,000.00 |
$104,000.00 |
$90,480.00 |
$128,934.00 |
| 36 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$16,400.00 |
$2,000.00 |
$1,000.00 |
$5,000.00 |
$15,600.00 |
$22,859.00 |
| 37 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 1 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 38 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 1 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 39 | 501(G) 6309 |
CLSM BACKFILL | 2 | CY |
$150.00 |
$165.00 |
$330.00 |
$300.00 |
$157.50 |
$250.00 |
| 40 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 41 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$130,410.00 |
$140,000.00 |
$160,000.00 |
$117,000.00 |
$194,480.00 |
$128,934.00 |
| 42 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$37,260.00 |
$2,000.00 |
$1,000.00 |
$10,000.00 |
$34,320.00 |
$22,859.00 |
| 43 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 21 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 44 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 509 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 45 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 75 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 46 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 47 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$63,763.00 |
$102,000.00 |
$100,000.00 |
$90,000.00 |
$98,800.00 |
$60,223.00 |
| 48 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$18,218.00 |
$2,000.00 |
$1,000.00 |
$5,000.00 |
$16,640.00 |
$15,056.00 |
| 49 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 50 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 51 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 52 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$59,941.00 |
$90,100.00 |
$100,000.00 |
$63,000.00 |
$93,600.00 |
$59,274.00 |
| 53 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$17,126.00 |
$2,000.00 |
$1,000.00 |
$5,000.00 |
$16,640.00 |
$14,818.00 |
| 54 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 4 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 55 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 4 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 56 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 57 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$58,863.00 |
$62,000.00 |
$100,000.00 |
$63,000.00 |
$92,560.00 |
$55,790.00 |
| 58 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$16,818.00 |
$2,000.00 |
$1,000.00 |
$5,000.00 |
$16,640.00 |
$13,948.00 |
| 59 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 7 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 60 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 7 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 61 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 62 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$14,700.00 |
$18,870.00 |
$25,000.00 |
$63,000.00 |
$24,960.00 |
$17,224.00 |
| 63 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$4,200.00 |
$500.00 |
$1,000.00 |
$2,000.00 |
$5,200.00 |
$4,306.00 |
| 64 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 8 | SY |
$600.00 |
$410.00 |
$440.00 |
$3,200.00 |
$420.00 |
$600.00 |
| 65 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 8 | SY |
$45.00 |
$10.00 |
$22.00 |
$160.00 |
$21.00 |
$50.00 |
| 66 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 67 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,638.00 |
$18,955.00 |
$25,000.00 |
$67,020.00 |
$26,000.00 |
$21,749.00 |
| 68 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$4,468.00 |
$500.00 |
$1,000.00 |
$2,000.00 |
$5,200.00 |
$5,437.00 |
| 69 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 70 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 71 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$15,000.00 |
$5,000.00 |
$10,560.00 |
$10,000.00 |
$19,425.00 |
$50,000.00 |
| 72 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 73 | 509(B) 1328 |
CLASS A CONCRETE | 16.6 | CY |
$450.00 |
$72.50 |
$1,650.00 |
$1,500.00 |
$1,155.00 |
$4,000.00 |
| 74 | 511(A) 1332 |
REINFORCING STEEL | 965 | LB |
$1.00 |
$5.00 |
$1.65 |
$1.50 |
$3.94 |
$7.00 |
| 75 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$16,828.00 |
$20,145.00 |
$25,000.00 |
$72,120.00 |
$28,080.00 |
$22,693.00 |
| 76 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$4,808.00 |
$500.00 |
$1,000.00 |
$2,000.00 |
$5,200.00 |
$5,673.00 |
| 77 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 4 | SY |
$600.00 |
$10.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 78 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 4 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 79 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 6 | EA |
$1,000.00 |
$5,000.00 |
$2,310.00 |
$2,100.00 |
$2,730.00 |
$10,000.00 |
| 80 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 81 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$20,139.00 |
$25,245.00 |
$25,000.00 |
$86,310.00 |
$33,280.00 |
$21,696.00 |
| 82 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,754.00 |
$500.00 |
$1,000.00 |
$2,000.00 |
$6,240.00 |
$5,424.00 |
| 83 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 84 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 3 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 85 | 501(G) 6309 |
CLSM BACKFILL | 3 | CY |
$150.00 |
$315.00 |
$330.00 |
$300.00 |
$157.50 |
$250.00 |
| 86 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 87 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$118,930.00 |
$120,000.00 |
$140,000.00 |
$120,000.00 |
$177,840.00 |
$136,944.00 |
| 88 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$33,980.00 |
$2,000.00 |
$1,000.00 |
$5,000.00 |
$31,200.00 |
$34,236.00 |
| 89 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 90 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 3 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 91 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 92 | 509(B) 1328 |
CLASS A CONCRETE | 170.7 | CY |
$450.00 |
$400.00 |
$1,650.00 |
$1,500.00 |
$1,627.50 |
$3,250.00 |
| 93 | 511(A) 1332 |
REINFORCING STEEL | 39,497 | LB |
$1.00 |
$1.75 |
$1.65 |
$1.50 |
$2.42 |
$2.50 |
| 94 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$938,385.00 |
$910,000.00 |
$900,000.00 |
|
|
|
| 95 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$268,110.00 |
$10,000.00 |
$1,000.00 |
$30,000.00 |
$275,600.00 |
$313,131.00 |
| 96 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 145 | LF |
$35.00 |
$25.00 |
$27.50 |
$25.00 |
$26.25 |
$30.00 |
| 97 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 5.6 | GAL |
$80.00 |
$92.00 |
$88.00 |
$80.00 |
$84.00 |
$100.00 |
| 98 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 6 | SY |
$600.00 |
$410.00 |
$440.00 |
$40.00 |
$420.00 |
$600.00 |
| 99 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 203 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 100 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 925 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 101 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1,832 | EA |
$30.00 |
$52.00 |
$55.00 |
$50.00 |
$52.50 |
$70.00 |
| 102 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 103 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,323.00 |
$51,000.00 |
$80,000.00 |
$90,000.00 |
$80,080.00 |
$68,109.00 |
| 104 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$14,378.00 |
$5,000.00 |
$1,000.00 |
$5,000.00 |
$14,560.00 |
$17,027.00 |
| 105 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 5 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 106 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 5 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 107 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 108 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$72,450.00 |
$65,000.00 |
$80,000.00 |
$100,000.00 |
$111,280.00 |
$90,671.00 |
| 109 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$20,700.00 |
$500.00 |
$1,000.00 |
$5,000.00 |
$19,760.00 |
$22,668.00 |
| 110 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 4 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 111 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 4 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 112 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 113 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$171,493.00 |
$185,000.00 |
$200,000.00 |
$220,000.00 |
$252,720.00 |
$154,687.00 |
| 114 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$48,998.00 |
$1,000.00 |
$1,000.00 |
$10,000.00 |
$44,720.00 |
$38,672.00 |
| 115 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 15 | LF |
$35.00 |
$25.00 |
$27.50 |
$25.00 |
$26.25 |
$30.00 |
| 116 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.6 | GAL |
$80.00 |
$92.00 |
$88.00 |
$80.00 |
$84.00 |
$100.00 |
| 117 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 118 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 1,518 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 119 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 172 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 120 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 121 | 509(B) 1328 |
CLASS A CONCRETE | 46.8 | CY |
$450.00 |
$1,550.00 |
$1,650.00 |
$1,500.00 |
$1,417.50 |
$3,500.00 |
| 122 | 511(A) 1332 |
REINFORCING STEEL | 6,711 | LB |
$1.00 |
$1.75 |
$1.65 |
$1.50 |
$2.42 |
$4.00 |
| 123 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$544,257.00 |
$645,000.00 |
$600,000.00 |
$435,000.00 |
$958,880.00 |
$840,470.00 |
| 124 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$155,502.00 |
$5,000.00 |
$1,000.00 |
$20,000.00 |
$168,480.00 |
$210,118.00 |
| 125 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 105 | LF |
$35.00 |
$28.00 |
$27.50 |
$25.00 |
$26.25 |
$30.00 |
| 126 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 4 | GAL |
$80.00 |
$92.00 |
$88.00 |
$80.00 |
$84.00 |
$100.00 |
| 127 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 21 | SY |
$600.00 |
$10.00 |
$440.00 |
$40.00 |
$420.00 |
$600.00 |
| 128 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 2,369 | SF |
$100.00 |
$25.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 129 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 434 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 130 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 732 | EA |
$30.00 |
$52.00 |
$55.00 |
$50.00 |
$52.50 |
$70.00 |
| 131 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 18 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 132 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 18 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 133 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 134 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$93,912.00 |
$114,036.00 |
$100,000.00 |
$125,000.00 |
$142,480.00 |
$82,631.00 |
| 135 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$26,832.00 |
$500.00 |
$1,000.00 |
$5,000.00 |
$24,960.00 |
$20,658.00 |
| 136 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 137 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 527 | SF |
$100.00 |
$25.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 138 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 61 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 139 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 140 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$93,156.00 |
$113,118.00 |
$100,000.00 |
$5,000.00 |
$141,440.00 |
$115,816.00 |
| 141 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$26,616.00 |
$500.00 |
$1,000.00 |
$10,000.00 |
$24,960.00 |
$28,954.00 |
| 142 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 70 | SF |
$100.00 |
$25.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 143 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 8 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 144 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 145 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$98,273.00 |
$119,331.00 |
$100,000.00 |
$125,000.00 |
$148,720.00 |
$115,816.00 |
| 146 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$28,078.00 |
$500.00 |
$1,000.00 |
$5,000.00 |
$26,000.00 |
$28,954.00 |
| 147 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 28 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 148 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 1,337 | SF |
$100.00 |
$25.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 149 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 177 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 150 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 151 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$68,516.00 |
$112,540.00 |
$100,000.00 |
$100,000.00 |
$106,080.00 |
$71,808.00 |
| 152 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$19,576.00 |
$500.00 |
$1,000.00 |
$10,000.00 |
$18,720.00 |
$17,952.00 |
| 153 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 9 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 154 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 665 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.63 |
$83.25 |
$100.00 |
| 155 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 74 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 156 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 157 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$171,164.00 |
$207,842.00 |
$200,000.00 |
$215,000.00 |
$251,680.00 |
$220,621.00 |
| 158 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$48,904.00 |
$1,000.00 |
$1,000.00 |
$20,000.00 |
$44,720.00 |
$55,155.00 |
| 159 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 10 | LF |
$35.00 |
$28.00 |
$27.50 |
$25.00 |
$26.25 |
$30.00 |
| 160 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 0.5 | GAL |
$80.00 |
$92.00 |
$88.00 |
$80.00 |
$84.00 |
$100.00 |
| 161 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 5 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 162 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 5 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 163 | 501(G) 6309 |
CLSM BACKFILL | 3 | CY |
$150.00 |
$315.00 |
$330.00 |
$300.00 |
$157.50 |
$250.00 |
| 164 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 165 | 509(B) 1328 |
CLASS A CONCRETE | 9.2 | CY |
$450.00 |
$1,800.00 |
$1,650.00 |
$1,500.00 |
$1,837.50 |
$4,000.00 |
| 166 | 511(A) 1332 |
REINFORCING STEEL | 2,274 | LB |
$1.00 |
$1.75 |
$1.65 |
$1.50 |
$2.73 |
$7.00 |
| 167 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$126,126.00 |
$103,700.00 |
$130,000.00 |
$126,000.00 |
$188,240.00 |
$128,934.00 |
| 168 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$36,036.00 |
$500.00 |
$1,000.00 |
$10,000.00 |
$33,280.00 |
$22,859.00 |
| 169 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 6 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 170 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 35 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 171 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 200 | EA |
$30.00 |
$55.00 |
$55.00 |
$50.00 |
$52.50 |
$70.00 |
| 172 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 173 | 509(B) 1328 |
CLASS A CONCRETE | 11.2 | CY |
$450.00 |
$1,800.00 |
$1,650.00 |
$1,500.00 |
$1,575.00 |
$4,000.00 |
| 174 | 511(A) 1332 |
REINFORCING STEEL | 3,071 | LB |
$1.00 |
$1.75 |
$1.65 |
$1.50 |
$2.73 |
$7.00 |
| 175 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$114,702.00 |
$139,281.00 |
$120,000.00 |
$110,000.00 |
$171,600.00 |
$128,934.00 |
| 176 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$32,772.00 |
$500.00 |
$1,000.00 |
$20,000.00 |
$30,160.00 |
$22,859.00 |
| 177 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$600.00 |
$410.00 |
$440.00 |
$319.94 |
$420.00 |
$600.00 |
| 178 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 785 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 179 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 126 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 180 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 246 | EA |
$30.00 |
$55.00 |
$55.00 |
$50.00 |
$52.50 |
$70.00 |
| 181 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 182 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$63,763.00 |
$87,975.00 |
$100,000.00 |
$90,000.00 |
$99,840.00 |
$67,730.00 |
| 183 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$18,218.00 |
$500.00 |
$1,000.00 |
$10,000.00 |
$17,680.00 |
$16,932.00 |
| 184 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 185 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 186 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 187 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$59,941.00 |
$90,100.00 |
$100,000.00 |
$90,000.00 |
$93,600.00 |
$59,274.00 |
| 188 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$17,126.00 |
$500.00 |
$1,000.00 |
$10,000.00 |
$16,640.00 |
$14,818.00 |
| 189 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 6 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 190 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 6 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 191 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 192 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$58,863.00 |
$92,650.00 |
$100,000.00 |
$90,000.00 |
$92,560.00 |
$56,265.00 |
| 193 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$16,818.00 |
$500.00 |
$1,000.00 |
$10,000.00 |
$16,640.00 |
$14,066.00 |
| 194 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 10 | SY |
$600.00 |
$410.00 |
$440.00 |
$40.00 |
$420.00 |
$600.00 |
| 195 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 10 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 196 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 197 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$14,763.00 |
$17,000.00 |
$25,000.00 |
$65,000.00 |
$24,960.00 |
$20,802.00 |
| 198 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$4,218.00 |
$200.00 |
$1,000.00 |
$2,000.00 |
$5,200.00 |
$5,200.00 |
| 199 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 200 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 3 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 201 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 202 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$15,099.00 |
$19,465.00 |
$25,000.00 |
$84,000.00 |
$24,960.00 |
$20,002.00 |
| 203 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$4,314.00 |
$200.00 |
$1,000.00 |
$5,000.00 |
$5,200.00 |
$5,000.00 |
| 204 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 205 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 206 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 207 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$16,016.00 |
$19,720.00 |
$25,000.00 |
$75,000.00 |
$27,040.00 |
$22,303.00 |
| 208 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$4,576.00 |
$200.00 |
$1,000.00 |
$5,000.00 |
$5,200.00 |
$5,576.00 |
| 209 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 2 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 210 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 2 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 211 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 212 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$16,065.00 |
$19,720.00 |
$25,000.00 |
$75,000.00 |
$27,040.00 |
$22,146.00 |
| 213 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$4,590.00 |
$200.00 |
$1,000.00 |
$5,000.00 |
$5,200.00 |
$5,537.00 |
| 214 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 5 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 215 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 5 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 216 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 217 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$19,726.00 |
$23,205.00 |
$25,000.00 |
$90,000.00 |
$32,240.00 |
$20,290.00 |
| 218 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$5,636.00 |
$200.00 |
$1,000.00 |
$5,000.00 |
$5,200.00 |
$5,072.00 |
| 219 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 5 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 220 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 5 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 221 | 501(G) 6309 |
CLSM BACKFILL | 1.5 | CY |
$150.00 |
$315.00 |
$330.00 |
$300.00 |
$157.50 |
$250.00 |
| 222 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 223 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$172,564.00 |
$205,450.00 |
$200,000.00 |
$189,000.00 |
$253,760.00 |
$136,944.00 |
| 224 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$49,304.00 |
$1,000.00 |
$1,000.00 |
$150,000.00 |
$44,720.00 |
$34,236.00 |
| 225 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 3 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 226 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 531 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 227 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 62 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 228 | 501(G) 6309 |
CLSM BACKFILL | 42.7 | CY |
$150.00 |
$315.00 |
$330.00 |
$300.00 |
$157.50 |
$250.00 |
| 229 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 230 | 509(B) 1328 |
CLASS A CONCRETE | 4.9 | CY |
$450.00 |
$1,800.00 |
$1,650.00 |
$1,500.00 |
$1,890.00 |
$5,000.00 |
| 231 | 511(A) 1332 |
REINFORCING STEEL | 570 | LB |
$1.00 |
$1.75 |
$1.65 |
$1.50 |
$2.94 |
$7.00 |
| 232 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$188,300.00 |
$250,750.00 |
$200,000.00 |
$190,000.00 |
$275,600.00 |
$222,825.00 |
| 233 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$53,800.00 |
$2,000.00 |
$1,000.00 |
$20,000.00 |
$48,880.00 |
$55,706.00 |
| 234 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 80 | LF |
$35.00 |
$28.00 |
$27.50 |
$34.00 |
$26.25 |
$30.00 |
| 235 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 3.1 | GAL |
$80.00 |
$92.00 |
$88.00 |
$80.00 |
$84.00 |
$100.00 |
| 236 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 8 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 237 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 2,577 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 238 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 321 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 239 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 240 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$205,345.00 |
$249,347.00 |
$200,000.00 |
$200,000.00 |
$300,560.00 |
$222,825.00 |
| 241 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$58,670.00 |
$1,000.00 |
$1,000.00 |
$25,000.00 |
$53,040.00 |
$55,706.00 |
| 242 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 45 | LF |
$35.00 |
$28.00 |
$27.50 |
$25.00 |
$26.25 |
$30.00 |
| 243 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 1.7 | GAL |
$80.00 |
$92.00 |
$88.00 |
$80.00 |
$84.00 |
$100.00 |
| 244 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 6 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 245 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 6 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 246 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 247 | 509(B) 1328 |
CLASS A CONCRETE | 110.4 | CY |
$450.00 |
$1,800.00 |
$1,650.00 |
$1,500.00 |
$1,680.00 |
$3,500.00 |
| 248 | 511(A) 1332 |
REINFORCING STEEL | 30,138 | LB |
$1.00 |
$1.75 |
$1.65 |
$1.50 |
$2.42 |
$2.50 |
| 249 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$547,407.00 |
$598,237.65 |
$600,000.00 |
$605,000.00 |
$786,240.00 |
$608,609.00 |
| 250 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$156,402.00 |
$5,000.00 |
$1,000.00 |
$40,000.00 |
$139,360.00 |
$152,152.00 |
| 251 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 75 | LF |
$35.00 |
$28.00 |
$27.50 |
$25.00 |
$26.25 |
$30.00 |
| 252 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 2.9 | GAL |
$80.00 |
$92.00 |
$88.00 |
$80.00 |
$84.00 |
$100.00 |
| 253 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 38 | SY |
$600.00 |
$410.00 |
$440.00 |
$40.00 |
$420.00 |
$600.00 |
| 254 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 1,188 | SF |
$100.00 |
$92.00 |
$98.50 |
$89.62 |
$83.25 |
$100.00 |
| 255 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 728 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 256 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 1,022 | EA |
$30.00 |
$55.00 |
$55.00 |
$50.00 |
$52.50 |
$70.00 |
| 257 | 506(A) 1322 |
STRUCTURAL STEEL | 500 | LB |
$2.00 |
$10.50 |
$5.00 |
$5.00 |
$7.35 |
$8.00 |
| 258 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$113,057.00 |
$137,283.00 |
$120,000.00 |
$160,000.00 |
$169,520.00 |
$126,275.00 |
| 259 | 512(B) 6303 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$32,302.00 |
$500.00 |
$1,000.00 |
$20,000.00 |
$30,160.00 |
$31,569.00 |
| 260 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 46 | SY |
$600.00 |
$410.00 |
$440.00 |
$400.00 |
$420.00 |
$600.00 |
| 261 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 46 | SY |
$45.00 |
$10.00 |
$22.00 |
$20.00 |
$21.00 |
$50.00 |
| 262 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 500 | SD |
$20.00 |
$10.00 |
$50.00 |
$85.00 |
$85.00 |
$100.00 |
| 263 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$30,000.00 |
$75,000.00 |
$150,000.00 |
$280,000.00 |
$275,000.00 |
$333,620.00 |
| 264 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,000 | SD |
$18.50 |
$5.00 |
$20.00 |
$30.00 |
$30.00 |
$35.00 |
| 265 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$5,000.00 |
$10,000.00 |
$20,000.00 |
$100,000.00 |
$25,000.00 |
$25,000.00 |
| 266 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$350,000.00 |
$250,000.00 |
$200,000.00 |
$306,000.00 |
$535,000.00 |
$595,000.00 |