| 1 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 400 | TON |
$200.00 |
$135.00 |
$95.00 |
$93.00 |
$101.75 |
$145.00 |
$115.00 |
$100.00 |
$125.00 |
| 2 | 417 5267 |
COLD MILLING PAVEMENT | 2,150 | SY |
$5.50 |
$7.50 |
$5.00 |
$4.00 |
$5.50 |
$12.00 |
$5.50 |
$5.00 |
$7.00 |
| 3 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 610 | LF |
$5.00 |
$3.00 |
$3.00 |
$1.00 |
$2.75 |
$2.50 |
$4.00 |
$2.00 |
$5.00 |
| 4 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 400 | LF |
$19.00 |
$16.00 |
$14.00 |
$13.50 |
$16.68 |
$14.00 |
$17.00 |
$15.00 |
$16.50 |
| 5 | 623(E) 7114 |
THRIE BEAM BRIDGE CONNECTION-TYPE A | 4 | EA |
$2,000.00 |
$1,325.00 |
$1,600.00 |
$1,600.00 |
$1,237.50 |
$1,600.00 |
$1,300.00 |
$2,100.00 |
$1,550.00 |
| 6 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 4 | EA |
$2,800.00 |
$1,925.00 |
$2,100.00 |
$2,050.00 |
$2,337.50 |
$3,000.00 |
$2,300.00 |
$1,300.00 |
$2,450.00 |
| 7 | 504(A) 1304 |
APPROACH SLAB | 128.33 | SY |
$220.00 |
$185.00 |
$225.00 |
$238.00 |
$236.50 |
$182.00 |
$200.00 |
$225.00 |
$240.00 |
| 8 | 504(C) 6250 |
SEALED EXPANSION JOINT | 62.1 | LF |
$250.00 |
$250.00 |
$300.00 |
$393.00 |
$300.30 |
$340.00 |
$210.00 |
$300.00 |
$270.00 |
| 9 | 504(E) 6245 |
CONCRETE RAIL (TR4) | 439.7 | LF |
$100.00 |
$60.00 |
$95.00 |
$121.00 |
$92.40 |
$115.00 |
$130.00 |
$110.00 |
$95.00 |
| 10 | 504(H) 6390 |
RAPID CURE JOINT SEALANT | 57.25 | LF |
$35.00 |
$40.00 |
$20.00 |
$23.00 |
$36.30 |
$80.00 |
$25.00 |
$40.00 |
$45.00 |
| 11 | 509(A) 1326 |
CLASS AA CONCRETE | 172.5 | CY |
$800.00 |
$700.00 |
$750.00 |
$966.00 |
$797.50 |
$700.00 |
$810.00 |
$800.00 |
$845.00 |
| 12 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 46,620 | LB |
$1.25 |
$0.8500 |
$1.25 |
$1.00 |
$1.21 |
$1.00 |
$1.40 |
$1.15 |
$1.02 |
| 13 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$50,000.00 |
$10,000.00 |
$25,000.00 |
$25,000.00 |
$36,928.32 |
$15,000.00 |
$32,400.00 |
$20,000.00 |
$50,000.00 |
| 14 | 512(B) 6303 |
COLLECTION & HANDLING OF WASTE | 1 | LSUM |
$20,000.00 |
$500.00 |
$1,000.00 |
$10,000.00 |
$2,811.60 |
$5,000.00 |
$2,500.00 |
$6,000.00 |
$5,000.00 |
| 15 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 169.5 | SY |
$5.00 |
$6.00 |
$4.00 |
$6.00 |
$5.50 |
$40.00 |
$5.00 |
$4.00 |
$5.00 |
| 16 | 520(A) 6058 |
PREPARATION OF CRACKS ABOVE WATER | 300 | LF |
$35.00 |
$32.50 |
$30.00 |
$36.00 |
$22.00 |
$30.00 |
$20.00 |
$30.00 |
$25.00 |
| 17 | 520(C) 6060 |
EPOXY RESIN ABOVE WATER | 3 | GAL |
$100.00 |
$150.00 |
$110.00 |
$132.00 |
$55.00 |
$1,500.00 |
$50.00 |
$120.00 |
$100.00 |
| 18 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 207.5 | SY |
$450.00 |
$500.00 |
$455.00 |
$228.00 |
$499.40 |
$350.00 |
$445.00 |
$475.00 |
$555.00 |
| 19 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 90 | LF |
$15.00 |
$5.00 |
$5.00 |
$5.00 |
$5.50 |
$30.00 |
$6.00 |
$5.00 |
$10.00 |
| 20 | 523(B) 6560 |
(SP) SEALER RESIN | 1 | GAL |
$175.00 |
$200.00 |
$50.00 |
$200.00 |
$275.00 |
$2,000.00 |
$50.00 |
$110.00 |
$500.00 |
| 21 | 540 4505 |
(PL)REPAIR BRIDGE ITEMS | 3 | EA |
$50,000.00 |
$7,500.00 |
$3,000.00 |
$10,000.00 |
$36,567.30 |
$2,500.00 |
$30,000.00 |
$9,000.00 |
$35,000.00 |
| 22 | 542 4605 |
(PL)INSTALLATION OF BRIDGE ITEMS | 440 | EA |
$175.00 |
$50.00 |
$50.00 |
$70.00 |
$45.10 |
$40.00 |
$40.00 |
$50.00 |
$50.00 |
| 23 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$200,000.00 |
$134,500.00 |
$75,000.00 |
$119,000.00 |
$69,300.00 |
$98,000.00 |
$83,760.00 |
$150,000.00 |
$160,000.00 |
| 24 | 627(O) 4410 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 1,150 | LF |
$5.00 |
$3.00 |
$5.00 |
$3.00 |
$4.40 |
$2.00 |
$5.50 |
$6.00 |
$5.00 |
| 25 | 627(P) 4425 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 2,300 | LF |
$30.00 |
$15.00 |
$23.00 |
$34.00 |
$25.30 |
$40.00 |
$39.00 |
$27.00 |
$34.00 |
| 26 | 855(A) 8815 |
TRAFFIC STRIPE(PLASTIC)(THIN-LINE)(4" WIDE) | 10,000 | LF |
$0.7000 |
$0.5300 |
$0.2500 |
$0.6400 |
$0.5500 |
$2.00 |
$0.7100 |
$0.2500 |
$0.4500 |
| 27 | 856(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,288 | LF |
$0.2500 |
$0.5300 |
$0.0500 |
$0.0500 |
$0.5500 |
$1.00 |
$0.6700 |
$0.0500 |
$0.2000 |
| 28 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 6,000 | LF |
$0.5000 |
$0.2600 |
$0.0400 |
$0.0400 |
$0.2800 |
$1.50 |
$0.2500 |
$0.0400 |
$0.2000 |
| 29 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$50,000.00 |
$22,000.00 |
$43,899.00 |
$40,000.00 |
$19,580.00 |
$70,000.00 |
$33,000.00 |
$40,000.00 |
$28,500.00 |
| 30 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$30,000.00 |
$50,000.00 |
$40,000.00 |
$35,630.14 |
$36,000.00 |
$37,640.00 |
$85,000.00 |
$29,000.00 |