| 1 | 501(G) 6309 |
CLSM BACKFILL | 10 | CY |
$260.00 |
$350.00 |
$200.00 |
$395.00 |
| 2 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$32,375.00 |
$10,000.00 |
$26,000.00 |
$72,500.00 |
| 3 | 504(H) 6390 |
RAPID CURE JOINT SEALANT | 91.2 | LF |
$40.00 |
$20.00 |
$20.00 |
$45.00 |
| 4 | 504(I) 6389 |
ELASTOMERIC MORTAR | 6.2 | CF |
$800.00 |
$550.00 |
$1,200.00 |
$740.00 |
| 5 | 505(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 33.2 | SY |
$600.00 |
$600.00 |
$730.00 |
$600.00 |
| 6 | 509(A) 1326 |
CLASS AA CONCRETE | 4.6 | CY |
$740.00 |
$3,000.00 |
$3,800.00 |
$12,500.00 |
| 7 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 2,740 | LB |
$2.00 |
$1.50 |
$1.00 |
$0.5500 |
| 8 | 520(A) 6058 |
PREPARATION OF CRACKS ABOVE WATER | 31.8 | LF |
$30.00 |
$31.00 |
$130.00 |
$34.10 |
| 9 | 520(C) 6060 |
EPOXY RESIN ABOVE WATER | 2.5 | GAL |
$120.00 |
$65.00 |
$100.00 |
$71.50 |
| 10 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 36.9 | SY |
$700.00 |
$610.00 |
$525.00 |
$805.00 |
| 11 | 524 6410 |
(SP)FIBER-REINFORCED EPOXY COMPOSITE MATERIAL | 139 | SF |
$110.00 |
$40.00 |
$70.00 |
$49.00 |
| 12 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 37 | SY |
$65.00 |
$62.00 |
$30.00 |
$68.00 |
| 13 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 30 | EA |
$2,400.00 |
$1,600.00 |
$1,500.00 |
$590.00 |
| 14 | 540 4525 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 10 | EA |
$200.00 |
$1,000.00 |
$850.00 |
$300.00 |
| 15 | 619(B) 2500 |
(PL)REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$8,000.00 |
$13,000.00 |
$12,800.00 |
| 16 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$23,000.00 |
$13,000.00 |
$15,000.00 |
$17,000.00 |
| 17 | 823 8478 |
(PL)PORTABLE TRAFFIC SIGNAL SYSTEM | 20 | SD |
$250.00 |
$250.00 |
$200.00 |
$275.00 |
| 18 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 430 | LF |
$1.00 |
$1.00 |
$1.25 |
$1.10 |
| 19 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$27,683.00 |
$30,000.00 |
$18,500.00 |