| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$12.50 |
$5.00 |
$25.31 |
$25.00 |
| 2 | 202(C) 0184 |
UNCLASSIFIED BORROW | 250 | CY |
$18.00 |
$13.00 |
$33.69 |
$35.00 |
| 3 | 230(A) 2806 |
SOLID SLAB SODDING | 426.9 | SY |
$10.18 |
$2.00 |
$11.85 |
$6.50 |
| 4 | 303 0192 |
AGGREGATE BASE | 477.8 | CY |
$52.07 |
$37.00 |
$61.30 |
$75.00 |
| 5 | 411(S4) 5960 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 68.72 | TON |
$153.02 |
$95.00 |
$185.81 |
$155.00 |
| 6 | 414(B) 5072 |
9" H.E.S. CONCRETE (PATCHING) | 613.6 | SY |
$115.00 |
$125.00 |
$134.47 |
$135.00 |
| 7 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 430.6 | LF |
$5.01 |
$18.00 |
$21.67 |
$44.00 |
| 8 | 609(B) 1525 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) | 27.3 | LF |
$35.13 |
$18.00 |
$101.68 |
$65.00 |
| 9 | 609(C) 4810 |
CONCRETE HEADER CURB (8"X 18") | 1,424.9 | LF |
$23.50 |
$10.00 |
$34.80 |
$35.00 |
| 10 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 1,430.1 | SY |
$52.94 |
$55.00 |
$56.86 |
$48.00 |
| 11 | 610(B) 0399 |
6" CONCRETE DRIVEWAY (H.E.S.) | 823 | SY |
$124.72 |
$95.00 |
$62.52 |
$82.00 |
| 12 | 610(I) 4610 |
(PL)TACTILE WARNING DEVICE-NEW | 506.2 | SF |
$20.00 |
$75.00 |
$24.99 |
$35.50 |
| 13 | 611(E) 5112 |
INLET CICI DES. 2 (STD) | 1 | EA |
$1,409.48 |
$1,500.00 |
$5,350.00 |
$1,500.00 |
| 14 | 611(G) 4488 |
INLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) | 2 | EA |
$375.00 |
$750.00 |
$790.31 |
$850.00 |
| 15 | 611(K) 4488 |
CAST IRON CURB INLETS | 2 | EA |
$345.44 |
$500.00 |
$303.97 |
$325.00 |
| 16 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 1 | EA |
$561.51 |
$1,000.00 |
$1,167.05 |
$1,400.00 |
| 17 | 612(G) 0647 |
VALVE BOXES ADJUST TO GRADE | 4 | EA |
$257.76 |
$450.00 |
$717.31 |
$600.00 |
| 18 | 612(J) 0650 |
FIRE HYDRANT RESET | 2 | EA |
$2,250.00 |
$750.00 |
$2,788.68 |
$3,000.00 |
| 19 | 612(L) 0652 |
WATER METERS RESET | 1 | EA |
$350.00 |
$250.00 |
$2,788.67 |
$1,500.00 |
| 20 | 612(P) 0674 |
(PL)RESET LIGHT POLES | 2 | EA |
$500.00 |
$1,000.00 |
$3,823.81 |
$2,250.00 |
| 21 | 616(C) 0868 |
3/4" COPPER WATER SERVICE PIPE | 90 | LF |
$25.00 |
$10.00 |
$39.04 |
$9.00 |
| 22 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 602.72 | SY |
$6.40 |
$9.00 |
$24.20 |
$13.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 287.9 | SY |
$6.69 |
$6.00 |
$21.07 |
$12.00 |
| 24 | 619(B) 4763 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 729.2 | SY |
$1.18 |
$13.00 |
$27.87 |
$13.50 |
| 25 | 619(B) 4791 |
REMOVAL OF CURB | 1,484 | LF |
$9.00 |
$10.00 |
$8.49 |
$11.00 |
| 26 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 1,194.4 | SY |
$5.50 |
$9.00 |
$11.07 |
$10.00 |
| 27 | 622(A) 4746 |
PIPE RAILING | 151.5 | LF |
$95.00 |
$80.00 |
$43.68 |
$78.00 |
| 28 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.9 | CY |
$750.22 |
$250.00 |
$1,613.17 |
$3,350.00 |
| 29 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 1,514 | LF |
$0.7900 |
$1.40 |
$2.82 |
$2.50 |
| 30 | 855(B) 8824 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) | 2 | EA |
$1,436.02 |
$125.00 |
$169.01 |
$325.00 |
| 31 | 859(A) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,935.2 | LF |
$0.2200 |
$0.3500 |
$0.9000 |
$1.35 |
| 32 | 859(B) 8007 |
PAVEMENT MARKING REMOVAL(ARROWS) | 2 | EA |
$275.00 |
$50.00 |
$22.53 |
$68.22 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,735.57 |
$29,594.00 |
$8,798.17 |
$8,500.00 |
| 34 | 890A/B 8742 |
(PL)REMOVE & RESET TRAFFIC SIGNAL EQUIPMENT | 1 | LSUM |
$15,000.00 |
$25,000.00 |
$32,830.98 |
$31,850.00 |
| 35 | 890A/B 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 14 | EA |
$315.10 |
$200.00 |
$245.63 |
$238.88 |
| 36 | 642 0098 |
STAKING | 1 | LSUM |
$8,500.00 |
$4,500.00 |
$8,745.27 |
$17,000.00 |
| 37 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$13,762.29 |
$30,000.00 |
$12,332.72 |
$38,500.00 |