| 1 | 619(B) 4780 |
REMOVAL OF GUARD RAIL | 430 | LF |
$4.00 |
$2.00 |
$4.00 |
$5.00 |
| 2 | 623(A) 0932 |
BEAM GUARD RAIL-W-BEAM-SINGLE | 590 | LF |
$20.00 |
$13.60 |
$14.00 |
$25.00 |
| 3 | 623(E) 7114 |
THRIE BEAM BRIDGE CONNECTION-TYPE A | 8 | EA |
$2,000.00 |
$1,330.00 |
$1,400.00 |
$2,000.00 |
| 4 | 623(F) 4447 |
GUARD RAIL ANCHOR UNIT (TYPE B) | 1 | EA |
$700.00 |
$500.00 |
$550.00 |
$600.00 |
| 5 | 623(H) 8571 |
(SP)G.E.T. GUARD RAIL END SECTION | 2 | EA |
$2,200.00 |
$2,500.00 |
$2,600.00 |
$2,500.00 |
| 6 | 504(A) 1304 |
APPROACH SLAB | 311.2 | SY |
$150.00 |
$130.00 |
$204.00 |
$185.00 |
| 7 | 504(C) 6250 |
SEALED EXPANSION JOINT | 168.1 | LF |
$250.00 |
$250.00 |
$303.00 |
$250.00 |
| 8 | 504(F) 6190 |
42" F-SHAPED PARAPET | 880.5 | LF |
$70.00 |
$56.00 |
$78.00 |
$95.00 |
| 9 | 509(A) 1326 |
CLASS AA CONCRETE | 387.1 | CY |
$415.00 |
$500.00 |
$750.00 |
$800.00 |
| 10 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 129,560 | LB |
$0.8500 |
$0.7700 |
$1.00 |
$1.00 |
| 11 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,462 | SY |
$3.50 |
$9.00 |
$5.00 |
$5.00 |
| 12 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 88.7 | SY |
$670.00 |
$300.00 |
$500.00 |
$500.00 |
| 13 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 545.2 | LF |
$4.00 |
$30.00 |
$4.00 |
$6.00 |
| 14 | 523(B) 6560 |
(SP) SEALER RESIN | 6 | GAL |
$90.00 |
$60.00 |
$125.00 |
$250.00 |
| 15 | 524 6410 |
(SP)FIBER-REINFORCED EPOXY COMPOSITE MATERIAL | 1,005.6 | SF |
$60.00 |
$21.00 |
$44.00 |
$50.00 |
| 16 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 48 | SY |
$40.00 |
$50.00 |
$142.00 |
$100.00 |
| 17 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$90,000.00 |
$100,000.00 |
$170,000.00 |
$110,000.00 |
| 18 | 504(A) 1304 |
APPROACH SLAB | 299 | SY |
$150.00 |
$130.00 |
$204.00 |
$185.00 |
| 19 | 504(C) 6250 |
SEALED EXPANSION JOINT | 160.3 | LF |
$250.00 |
$250.00 |
$303.00 |
$250.00 |
| 20 | 504(F) 6190 |
42" F-SHAPED PARAPET | 878.1 | LF |
$70.00 |
$56.00 |
$78.00 |
$95.00 |
| 21 | 509(A) 1326 |
CLASS AA CONCRETE | 371.2 | CY |
$415.00 |
$500.00 |
$750.00 |
$800.00 |
| 22 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 123,410 | LB |
$0.8500 |
$0.7700 |
$1.00 |
$1.00 |
| 23 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,534 | SY |
$3.50 |
$9.00 |
$5.00 |
$5.00 |
| 24 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 16.3 | SY |
$670.00 |
$300.00 |
$500.00 |
$500.00 |
| 25 | 523(A) 6550 |
(SP) SEALER CRACK PREPARATION | 538.9 | LF |
$4.00 |
$30.00 |
$5.00 |
$6.00 |
| 26 | 523(B) 6560 |
(SP) SEALER RESIN | 6 | GAL |
$90.00 |
$60.00 |
$125.00 |
$250.00 |
| 27 | 524 6410 |
(SP)FIBER-REINFORCED EPOXY COMPOSITE MATERIAL | 1,191.6 | SF |
$60.00 |
$19.73 |
$44.00 |
$50.00 |
| 28 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 57 | SY |
$40.00 |
$50.00 |
$142.00 |
$100.00 |
| 29 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$70,000.00 |
$100,000.00 |
$170,000.00 |
$110,000.00 |
| 30 | 627(G) 4316 |
RELOCATION OF PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 2,140 | LF |
$3.00 |
$7.00 |
$2.50 |
$25.00 |
| 31 | 627(H) 5856 |
DELIVER PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 4,280 | LF |
$18.00 |
$7.00 |
$12.00 |
$25.00 |
| 32 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,230 | LF |
$1.20 |
$2.00 |
$1.50 |
$1.50 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$75,000.00 |
$55,000.00 |
$48,000.00 |
$50,000.00 |
| 34 | 642 0098 |
STAKING | 1 | LSUM |
$20,000.00 |
$5,000.00 |
$25,000.00 |
$15,000.00 |
| 35 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$56,000.00 |
$98,000.00 |
$100,000.00 |
$100,000.00 |