| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| FY 2034 | 30391(04) J3-0391(004)FP | ClevelandOklahomaDivision 3 | I-44 | Bridge & Approaches I-44: FROM JUST SOUTH OF 89TH STREET, NORTH TO 0.5 MI NORTH OF 89TH STREET IN OKC | $4,500,0002 items | Planned | ||
| FY 2034 | 30646(04) J3-0646(004)PM | KayDivision 4 | SH-11 | Grade,Drain,Bridge & Surface SH-11: OVER ABANDONED RAILROAD, 0.63 MILES EAST OF US-177 | $9,000,0001 items | Planned | ||
| FY 2034 | 31087(04) J3-1087(004)PM | CreekDivision 8 | SH-48 | Grade, Drain & Surface SH-48: BEGIN AT CREEK/ OKFUSKEE CL EXTEND NORTH 6.5 MI | $17,100,000 | Planned | ||
| FY 2034 | 31787(04) J3-1787(004)PM | OklahomaDivision 4 | I-44 | Grade,Drain,Bridge & Surface I-44: FROM JCT OF SH74/66/03, EXTEND EAST4.3 MILES TO I-235 | $50,000,000 | Planned | ||
| FY 2034 | 31856(04) J3-1856(004)PM | LatimerDivision 2 | US-270 | Widen, Resurface & Bridge US-270: FROM 4.5 MI EAST OF PITTSBURG C/L, EXTEND EAST APPROX 6.38 MI | $20,600,0003 items | Planned | ||
| FY 2034 | 31858(04) J3-1858(004)FP | AtokaDivision 2 | US-75 | Grade,Drain,Bridge & Surface US-75: BEGIN 2.18 MILES WEST OF US-69, EXTEND NORTHWEST TO COAL C/L | $10,200,000 | Planned | ||
| FY 2034 | 32688(10) J3-2688(010)PM | GarfieldDivision 4 | US-60 | Grade, Drain & Surface US-412: FROM GARLAND ROAD, EXTEND EAST 3 MILES TO US-81 (PH II) | $16,600,000 | Planned | ||
| FY 2034 | 32758(04) J3-2758(004)SS | ClevelandDivision 3 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM 4.9 MILES WEST OF POTTAWATOMIE COUNTY LINE, EAST 4.6 MILES | $39,900,0003 items | Planned | ||
| FY 2034 | 33765(04) J3-3765(004)PM | TillmanDivision 5 | SH-36 | Bridge & Approaches SH-36: AT DEEP RED, DEEP RED O'FLOW & ONE UNNAMED CR LOCATED 3.9, 4.0 & 4.2 M NORTH OF US-70. | $6,500,0003 items | Planned | ||
| FY 2034 | 33788(29) J3-3788(029)PM | TulsaDivision 8 | I-44 | Bridge & Approaches I-44: OVER THE ARKANSAS RIVER .5 MILE EAST OF US-75 WP 6 | $80,700,000 | Planned | ||
| FY 2034 | 33796(04) J3-3796(004)PM | OkmulgeeDivision 1 | SH-52 | Widen, Resurface & Bridge SH-52: BEGIN APPROX 1.2 MI S OF THE SH-52/US-62 JCT N APPROX 1.4 MI | $6,500,0001 items | Planned | ||
| FY 2034 | 33805(04) J3-3805(004)PM | CherokeeDivision 1 | US-62 | Intersect Modif US-62: JCT. US-62 & SH-51 INTERSECTION IMPROVEMENT | $2,500,000 | Planned | ||
| FY 2034 | 33875(04) J3-3875(004)PM | PushmatahaDivision 2 | SH-3 | Grade,Drain,Bridge & Surface SH-3: FROM APPROX 7.85 MI EAST OF JCT US-271, EXT EAST APPROX 2.84 MI WITH EXCEPTION OF JP 28007(07) | $12,000,0001 items | Planned | ||
| FY 2034 | 34308(04) J3-4308(004)PM | LoganDivision 4 | SH-51 | Widen & Resurface SH-51: FROM SH-74, EXTEND EAST 8 MILES TO 2.5 MI WEST OF US-77 | $26,100,000 | Planned | ||
| FY 2034 | 34380(04) J3-4380(004)PM | MuskogeeWagonerDivision 1 | US-64 | Widen, Resurface & Bridge US-64: FROM 0.53 MI. S OF TULSA C/L, S 7.44 MI. TO SH-104 JCT IN HASKELL | $22,700,0002 items | Planned | ||
| FY 2034 | 34383(04) J3-4383(004)FP | AdairDivision 1 | US-59 | Widen, Resurface & Bridge US-59: FROM SALEM RD.4.8 MI SOUTH OF SH-100, EXTEND N 4.75 MI | $10,200,0003 items | Planned | ||
| FY 2034 | 35030(04) J3-5030(004)PM | OttawaDivision 8 | SH-137 | Widen & Resurface SH-137: FROM US-60 TO SH-10 | $20,300,000 | Planned | ||
| FY 2034 | 35116(04) J3-5116(004)PM | OsageDivision 8 | SH-99 | Widen & Resurface SH-99: FROM 5 MILES NORTH OF SH-20 TO SH-11 | $6,300,000 | Planned | ||
| FY 2034 | 35116(08) J3-5116(008)PM | OsageDivision 8 | SH-99 | Widen & Resurface SH-99: FROM 4.3 SOUTH OF SH-11, EXTEND NORTH 4.3 MILES TO SH-11 | $6,300,000 | Planned | ||
| FY 2034 | 35119(04) J3-5119(004)PM | PawneeDivision 8 | US-64 | Grade, Drain & Surface US-64: FROM SH-99 WEST JCT EXTEND EAST 4.1 MILES | $14,100,000 | Planned | ||
| FY 2034 | 35170(08) J3-5170(008)PM | GradyDivision 7 | SH-92 | Widen & Resurface SH-92: FROM SECTION LINE E1260, EXTEND N. 7.39 MIS. | $25,300,000 | Planned | ||
| FY 2034 | 35171(04) J3-5171(004)PM | CaddoDivision 7 | SH-8 | Intersect Modif SH-8: AT PETREE ROAD, 1.0 MI. S. OF US-62 | $2,000,0001 items | Planned | ||
| FY 2034 | 35176(04) J3-5176(004)PM | ComancheDivision 7 | SH-17 | Grade,Drain,Bridge & Surface SH-17: FROM CYPRESS LANE ON THE E. SIDE OF ELGIN, E. 1.0 MI. | $7,100,0001 items | Planned | ||
| FY 2034 | 35603(04) J3-5603(004)PM | PushmatahaDivision 2 | SH-2 | Bridge Rehabilitation SH-2: OVER THE KIAMICHI RIVER, 17.0 MI NORTH OF JCT SH-3 | $3,100,0001 items | Planned | ||
| FY 2034 | 35605(04) J3-5605(004)PM | PushmatahaDivision 2 | SH-2 | Bridge Rehabilitation SH-2: OVER THE KIAMICHI RIVER, 15.3 MI NORTH OF JCT SH-3 | $3,100,0001 items | Planned | ||
| FY 2034 | 35614(04) J3-5614(004)PM | KayOsageDivision 4 | SH-11 | Bridge Rehabilitation SH-11: OVER ARKANSAS RIVER, 2.0 MILES EAST OF KAW CITY | $20,200,0001 items | Planned | ||
| FY 2034 | 35620(04) J3-5620(004)PM | GradyDivision 7 | SH-4 | Resurface SH-4: FROM SH-37, NORTH 2.30 MILES | $4,200,000 | Planned | ||
| FY 2034 | 35711(04) J3-5711(004)PM | DeweyMajorDivision 5 | US-183 | Widen & Resurface US-183: BEGIN 7.75 MILES S. OF US-270 AND EXT N. 7.75 MILES TO US-270 | $19,100,000 | Planned | ||
| FY 2034 | 35712(04) J3-5712(004)PM | CusterDivision 5 | SH-33 | Widen, Resurface & Bridge SH-33: BEGIN ON THE EAST SIDE OF THOMAS AND EXT NE 7.2 MILES TO THE DEWEY C/L. | $19,200,0002 items | Planned | ||
| FY 2034 | 35713(04) J3-5713(004)PM | BlaineDeweyDivision 5 | SH-33 | Widen & Resurface SH-33: BEGIN AT THE CUSTER C/L AND EXTEND NE 4.2 MILES TO US-270. | $11,900,000 | Planned | ||
| FY 2034 | 35739(04) J3-5739(004)PM | BeaverDivision 6 | US-270 | Widen, Resurface & Bridge US-270: BEGIN 8.0 MI SOUTH OF JCT US-64, EXTEND SOUTH 7.21 MI | $15,000,0001 items | Planned | ||
| FY 2034 | 35742(04) J3-5742(004)PM | TexasDivision 6 | SH-136 | Widen & Resurface SH-136: BEGIN 10.9 MI NORTH OF JCT US-64, EXTEND NORTH 6.15 MI TO THE KANSAS S/L | $15,300,000 | Planned | ||
| FY 2034 | 35750(04) J3-5750(004)PM | AlfalfaDivision 6 | SH-8 | Widen & Resurface SH-08: BEGIN AT JCT SH-45, EXTEND NE 7.26 MILES | $14,000,000 | Planned | ||
| FY 2034 | 35840(04) J3-5840(004)PM | WoodsDivision 6 | US-281 | Grade,Drain,Bridge & Surface US-281: BEGIN 0.07 MI NORTH OF THE JCT OF US-64, EXTEND NORTH 6.93 MI | $17,000,0001 items | Planned | ||
| FY 2034 | 35845(04) J3-5845(004)PM | McIntoshDivision 1 | US-266 | Pavement Rehabilitation US-266: FROM US-72 JCT, EXTEND E APPROX. 6.3 MI | $15,000,000 | Planned | ||
| FY 2034 | 35848(04) J3-5848(004)PM | OkmulgeeDivision 1 | I-40 | Pavement Rehabilitation I-40: FROM APPROX 0.5 MI W OF INDIAN NATION TURNPIKE, EXTEND E 6.0 MI TO MCINTOSH C/L | $4,000,0002 items | Planned | ||
| FY 2034 | 36137(04) J3-6137(004)PM | BlaineDivision 5 | SH-51 | Widen, Resurface & Bridge SH-51: BEGIN AT THE SH-51A JCT AND EXT EAST 8.0 MILES. | $18,200,0003 items | Planned | ||
| FY 2034 | 36160(04) J3-6160(004)PM | GradyDivision 7 | SH-37 | Grade,Drain,Bridge & Surface SH-37: FROM 2.04 MIS. E. OF THE CADDO C/L, EXTEND E. 6.7 MIS. TO JCT SH-37/US-81 | $15,300,0001 items | Planned | ||
| FY 2034 | 36237(04) J3-6237(004)PM | MuskogeeDivision 1 | US-69 | Bridge Rehabilitation US-69: NB & SB OVER THE ARKANSAS RIVER | $7,500,0002 items | Planned | ||
| FY 2034 | 36271(04) J3-6271(004)PM | CreekPawneeDivision 8 | SH-99 | Widen & Resurface SH-99: FROM SH-51 EXTEND NORTH 7.5 MILES TO CIMARRON TURNPIKE. | $18,800,000 | Planned | ||
| FY 2034 | 36281(04) J3-6281(004)PM | BryanDivision 2 | US-69 | Resurface US-69 NORTHBOUND: BEGIN APPROXIMATELY 6.8 MILES NORTH OF JUNCTION US-70, EXTEND NORTH APPROXIMATELY 7.5 MILES | $7,700,000 | Planned | ||
| FY 2034 | 36295(04) J3-6295(004)PM | LoganDivision 4 | SH-74 | Widen & Resurface SH-74: FROM WATERLOO RD; EXTEND NORTH TO SH-74 F | $10,000,000 | Planned | ||
| FY 2034 | 38343(04) J3-8343(004)PM | MuskogeeDivision 1 | SH-2 | Grade,Drain,Bridge & Surface SH-2: JCT SH-2 & E1130 RD EXT N JCT SH-2 & US-266 | $8,000,000 | Planned | ||
| FY 2034 | 38348(04) J3-8348(004)PM | OkmulgeeDivision 1 | US-75 | Grade, Drain & Surface US-75: AT FURGESON RD | $1,000,000 | Planned | ||
| FY 2034 | 38545(05) J3-8545(005)PM | McClainDivision 3 | I-35 | Bridge & Approaches I-35: NORTHBOUND AND SOUTHBOUND OVER SH-39 | $21,000,0002 items | Planned | ||
| FY 2034 | 39418(04) J3-9418(004)PM | BeckhamDivision 5 | I-40 | Resurface I-40: BEGIN AT MP 7.82 AND EXTEND TO MP 15 | $11,000,0005 items | Planned | ||
| FY 2034 | 39436(04) J3-9436(004)PM | BeaverDivision 6 | US-270 | Resurface US-270: BEGIN 13 MI W OF THE HARPER CL AND EXTENT E 6.20 MI | $6,200,000 | Planned | ||
| FY 2034 | 39466(04) J3-9466(004)PM | MurrayDivision 7 | SH-7 | Resurface SH-7: FROM 0.52 MILES EAST OF US-77N, EAST 5.22 MILES | $4,200,000 | Planned | ||
| FY 2034 | 39467(04) J3-9467(004)PM | ComancheDivision 7 | I-44 | Resurface I-44: FROM 0.85 MILES NORTH OF US-62 (ROGERS LANE), NORTH 5.60 MILES | $4,200,000 | Planned | ||
| FY 2034 | 39468(04) J3-9468(004)PM | MurrayDivision 7 | I-35 | Resurface I-35: FROM MM 45.8, NORTH 6.60 MILES TO MM 52.4 | $4,200,000 | Planned | ||
| FY 2034 | 39469(04) J3-9469(004)PM | StephensDivision 7 | SH-7 | Resurface SH-7: FROM 6.04 MILES EAST OF SH-65, EAST 7.65 MILES | $4,200,000 | Planned | ||
| FY 2035 | 17670(07) J1-7670(007)FP | SequoyahDivision 1 | I-40 | Interchange I-40: I-40/US-59 INTERCHANGE IN SALLISAW | $14,000,0002 items | Planned | ||
| FY 2035 | 20931(04) NHPP-030N(044)PM | TulsaDivision 8 | US-169 | Interchange US-169: INTERCHANGE AT BROKEN ARROW EXPRESSWAY(SELECT MOVEMENTS) | $28,400,000 | Planned | ||
| FY 2035 | 23270(04) J2-3270(004)PM | MayesDivision 8 | SH-28 | Grade, Drain & Surface SH-28: BEG. APPROX. 8.1 MILES EAST OF JCT SH-28/US-69 & EXTEND EAST 4.75 MILES | $32,000,000 | Planned | ||
| FY 2035 | 23288(08) J2-3288(008)PM | ClevelandPottawatomieDivision 3 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM 0.2 MILES WEST OF POTTAWATOMIE COUNTY LINE, EAST 5.5 MILES TO SH-102 | $46,100,0002 items | Planned | ||
| FY 2035 | 24213(04) STP-140C(148)PM | Le FloreDivision 2 | SH-63 | Grade,Drain,Bridge & Surface SH-63: FROM JCT US-271 IN TALIHINA, EXTEND EAST 5.0 MI | $17,900,0006 items | Planned | ||
| FY 2035 | 24410(04) J2-4410(004)PM | MarshallDivision 2 | SH-199 | Widen, Resurface & Bridge SH-199: FROM APPROX. 1.6 MI EAST OF JCT SH-99, EXTEND EAST APPROX. 5.0 MI | $16,700,0004 items | Planned | ||
| FY 2035 | 24411(04) J2-4411(004) | BryanMarshallDivision 2 | SH-199 | Widen & Resurface SH-199: FROM APPROX. 6.6 MI EAST OF JCT SH-99, EXTEND EAST APPROX. 5.3 MI | $15,000,000 | Planned | ||
| FY 2035 | 27072(04) J2-7072(004)PM | CaddoDivision 7 | SH-8 | Grade,Drain,Bridge & Surface SH-8: FROM JCT SH-19/US-277 IN CYRIL, EXTEND WEST & NORTH APPROX 5.0 MIS | $16,100,000 | Planned | ||
| FY 2035 | 31007(04) NHPP-255N(553)PM | OklahomaDivision 4 | SH-0 | Pavement Rehabilitation SH-0: LINCOLN BLVD DOWEL BAR RETROFIT AND DIAMOND GRINDING FROM I-235 JCT NORTH TO NE 14TH ST | $3,600,000 | Planned | ||
| FY 2035 | 31007(05) NHPP-255N(600)PM | OklahomaDivision 4 | SH-0 | Pavement Rehabilitation SH-0: LINCOLN BLVD DOWEL BAR RETROFIT AND DIAMOND GRINDING FROM NE 30TH, EXTEND NORTH TO I-44 JCT | $6,000,000 | Planned | ||
| FY 2035 | 31811(04) J3-1811(004)PM | KingfisherDivision 4 | SH-51 | Widen & Resurface SH-51: FROM SH-132, EXTEND EAST TO US-81 | $22,600,0002 items | Planned | ||
| FY 2035 | 31853(04) NHPP-022N(252)FP | ChoctawDivision 2 | US-70 | Bridge & Approaches US-70: BEGIN 11.5 MI EAST OF THE BRYAN C/L, EXTEND EAST 0.3 MI | $8,000,000 | Planned | ||
| FY 2035 | 31964(04) J3-1964(004)PM | DelawareDivision 8 | SH-116 | Grade, Drain & Surface SH-116: FROM APPROX. 2 MI EAST OF US-59, EXTEND EAST APPROX. 2.2 MILES | $14,100,0001 items | Planned | ||
| FY 2035 | 32688(04) J3-2688(004)PM | GarfieldDivision 4 | US-60 | Grade, Drain & Surface US-412: FROM US-81 EXTEND EAST 3 MILES TO US-64 (PH I) | $10,900,000 | Planned | ||
| FY 2035 | 32688(11) J3-2688(011)PM | GarfieldDivision 4 | US-60 | Grade, Drain & Surface US-81: FROM US-412 EXTEND NORTH 0.7 MILES TO OAK AVENUE (PH III) | $5,700,000 | Planned | ||
| FY 2035 | 32820(04) J3-2820(004)PM | McIntoshDivision 1 | Pavement Rehabilitation I-40: US-69 INTERCHANGE RAMPS | $6,100,000 | Planned | |||
| FY 2035 | 32823(04) STP-251C(184)PM | MuskogeeDivision 1 | US-62 | Grade,Drain,Bridge & Surface US-62/SH16/US-64/SH-72 INTERSECTION (BRIDGE OVER SH-72) | $11,000,000 | Planned | ||
| FY 2035 | 32882(15) J3-2882(015)PM | OklahomaDivision 4 | SH-152 | Grade,Drain,Bridge & Surface SH-152: EB & WB SH-152 FROM COUNCIL TO MERIDIAN INCLUDES INTERCHANGES AT MERIDIAN AND MACARTHUR. | $75,000,000 | Planned | ||
| FY 2035 | 33774(04) J3-3774(004)PM | OklahomaDivision 4 | I-35 | Grade,Drain,Bridge & Surface I-35: FROM SH-66, EXTEND NORTH 5.28 MILES TO THE LOGAN COUNTY LINE | $82,300,000 | Planned | ||
| FY 2035 | 33801(04) J3-3801(004)PM | HaskellDivision 1 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM 1.0 MI E OF SH-2 JCT., EAST 4.0 MI | $19,600,0005 items | Planned | ||
| FY 2035 | 33870(04) J3-3870(004) | BryanDivision 2 | US-69 | Grade,Drain,Bridge & Surface US-69: FROM APPROX 4.25 MI NORTH OF THE OK/TX STATE LINE, EXT NORTH APPROX 4.5 MI | $25,000,0001 items | Planned | ||
| FY 2035 | 33875(10) J3-3875(010)PM | PushmatahaDivision 2 | SH-3 | Resurface SH-3: FROM APPROX 10.7 MI EAST OF JCT US-271, EXT EAST APPROX 2.0 MI | $1,000,000 | Planned | ||
| FY 2035 | 33875(11) J3-3875(011)PM | PushmatahaDivision 2 | SH-3 | Grade,Drain,Bridge & Surface SH-3: FROM APPROX 12.7 MI EAST OF JCT US-271, EXT EAST APPROX 3.1 MI | $8,000,0005 items | Planned | ||
| FY 2035 | 34252(04) J3-4252(004)PM | McClainDivision 3 | SH-76 | Grade,Drain,Bridge & Surface SH-76: FROM NORTH FORK OF WALNUT CREEK, NORTH 4.5 MILES TO SH-130 | $35,800,0002 items | Planned | ||
| FY 2035 | 34306(04) J3-4306(004)PM | KingfisherDivision 4 | SH-3 | Widen & Resurface SH-3: FROM THE KINGFISHER C/L EXTEND EAST 8 MI TO N2820 RD | $6,000,000 | Planned | ||
| FY 2035 | 35027(04) J3-5027(004)PM | OttawaDivision 8 | US-60 | Grade, Drain & Surface US-60: FROM 0.58 MI EAST OF SH-125 N IN FAIRLAND EX E 5.82 MI | $40,300,000 | Planned | ||
| FY 2035 | 35043(04) J3-5043(004)PM | OttawaDivision 8 | SH-10 | Widen & Resurface SH-10: FROM US-60 TO SH-10C | $24,600,000 | Planned | ||
| FY 2035 | 35114(08) J3-5114(008)PM | CreekDivision 8 | SH-16 | Widen, Resurface & Bridge SH-16: FROM TURKEY CREEK EAST 4.14 MILES TO N100RD | $11,700,000 | Planned | ||
| FY 2035 | 35176(08) J3-5176(008)PM | ComancheDivision 7 | SH-17 | Grade,Drain,Bridge & Surface SH-17: FROM 1.0 MI. E. OF CYPRESS LANE ON THE E. SIDE OF ELGIN, E. 5.47 MIS. TO SH-65 | $23,400,0001 items | Planned | ||
| FY 2035 | 35218(04) J3-5218(004)PM | GarvinDivision 3 | SH-19 | Grade, Drain & Surface SH-19: FROM 2.0 MILES EAST OF GRADY COUNTY LINE, EAST 3.5 MILES TO WASHITA RIVER | $19,000,000 | Planned | ||
| FY 2035 | 35453(04) J3-5453(004)PM | AtokaDivision 2 | SH-7 | Grade,Drain,Bridge & Surface SH-7: FROM JOHNSTON CL, EXTEND EAST APPROX 6.0 MI | $16,800,0001 items | Planned | ||
| FY 2035 | 35499(04) J3-5499(004)PM | TulsaDivision 8 | US-169 | Bridge & Approaches US-169: AT 86TH STREET 9.6 MILES NORTH OF I-44 | $10,000,0001 items | Planned | ||
| FY 2035 | 35544(04) J3-5544(004)PM | HaskellDivision 1 | SH-9 | Grade,Drain,Bridge & Surface SH-9: FROM 10TH ST IN KEOTA, EXTEND E APPROX 5.8 MI TO LEFLORE C/L | $18,000,0004 items | Planned | ||
| FY 2035 | 35590(07) J3-5590(007)PM | LincolnDivision 3 | SH-18 | Grade,Drain,Bridge & Surface SH-18: FROM 6.4 MILES NORTH OF US-62 AT SH-18B, NORTH 7.1 MILES TO SH-66 | $17,300,0001 items | Planned | ||
| FY 2035 | 35607(04) J3-5607(004)PM | ChoctawDivision 2 | SH-93 | Bridge Rehabilitation SH-93: OVER FRAZIER CREEK, 11.7 MI NORTH OF JCT US-70 | $3,000,0001 items | Planned | ||
| FY 2035 | 35690(04) J3-5690(004)PM | CaddoDivision 7 | SH-58 | Widen & Resurface SH-58: FROM 11.00 MIS. N. OF SH-152, EXTEND N. 5.97 MIS. | $21,000,000 | Planned | ||
| FY 2035 | 35701(04) J3-5701(004)PM | GradyDivision 7 | US-81 | Grade,Drain,Bridge & Surface US-81: FROM 1ST ST. IN POCASSET, EXTEND N. 6.85 MIS. | $31,900,0002 items | Planned | ||
| FY 2035 | 35732(04) J3-5732(004)PM | AtokaDivision 2 | US-69 | Grade, Drain & Surface US-69: FROM 14.5 MI NORTH OF BRYAN C/L, EXTEND NORTH APPROX 1.6 MI | $13,000,000 | Planned | ||
| FY 2035 | 35769(04) J3-5769(004)PM | McClainDivision 3 | SH-59 | Widen & Resurface SH-59: FROM US-77, EAST 8.0 MILES | $15,800,0001 items | Planned | ||
| FY 2035 | 36243(04) J3-6243(004)PM | WagonerDivision 1 | US-69 | Pavement Rehabilitation US-69: FROM SH-51B, EXTEND N APPROX 2.3 MI. | $12,500,000 | Planned | ||
| FY 2035 | 36266(04) J3-6266(004)PM | TulsaDivision 8 | US-169 | Grade,Drain,Bridge & Surface US-169: FROM MEMORIAL DR. EXTEND NORTH 2.5 MILES | $21,500,000 | Planned | ||
| FY 2035 | 36272(04) J3-6272(004)PM | OsageDivision 8 | SH-11 | Widen & Resurface SH-11: FROM SH-99 EXTEND EAST APPROX. 4.7 MILES. | $11,800,000 | Planned | ||
| FY 2035 | 36272(07) J3-6272(007)PM | OsageDivision 8 | SH-11 | Widen & Resurface SH-11: FROM SH-99 BEGIN 4.7 MILES EAST, EXTEND 4.7 MILES TO END OF PROJECT. | $11,800,000 | Planned | ||
| FY 2035 | 36274(04) J3-6274(004)PM | PawneeDivision 8 | SH-99 | Widen & Resurface SH-99: FROM THE CIMARRON TURNPIKE EXTEND NORTH TO US-64 | $11,300,000 | Planned | ||
| FY 2035 | 36275(04) J3-6275(004)PM | MayesDivision 8 | SH-28 | Widen & Resurface SH-28: FROM THE ROGERS C/L EXTEND EAST APPROX. 3 MILES TO I-44. | $9,000,000 | Planned | ||
| FY 2035 | 38325(04) J3-8325(004)PM | MuskogeeDivision 1 | US-62 | Intersection Safety Improvement US-62: JCT US-62 & 4 MI RD | $7,500,000 | Planned | ||
| FY 2035 | 38350(04) J3-8350(004)PM | PittsburgDivision 2 | SH-9 | Bridge Rehabilitation SH-9: OVER LONGTOWN CREEK 3.3 MI EAST OF MCINTOSH C/L | $3,000,0001 items | Planned | ||
| FY 2035 | 38353(04) J3-8353(004)PM | ChoctawDivision 2 | SH-93 | Bridge Rehabilitation SH-93: OVER KIAMICHI RIVER, 8.3 MI NORTH US-70 JCT | $8,000,0001 items | Planned | ||
| FY 2035 | 38418(04) J3-8418(004)PM | AtokaDivision 2 | US-69 | Widen & Resurface US-69: FROM B STREET NORTH APPROX 0.30 MI TO JCT US-75 | $5,000,000 | Planned |
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.