ODOT Jobs

FY 2034 · 10 jobs · $92,200,000 Sign up free
★ My Jobs

Filtered by: District: Division 7 Clear all

10 jobs · $92,200,000 estimated

ExcelCSV
Let date Contract / J/P County / Division Highway Description Estimate Status Added Low bidder
FY 2034 29574(04) J2-9574(004)PM CaddoDivision 7 US-281 Bridge & Approaches US-281: OVER WASHITA RIVER AND TWO O'FLOWS FROM APPROX 0.74 MILES N. OF US-62 EXTEND N. APPROX 0.71 MILES $21,500,0003 items Planned Nov 25 New
FY 2034 35170(08) J3-5170(008)PM GradyDivision 7 SH-92 Widen & Resurface SH-92: FROM SECTION LINE E1260, EXTEND N. 7.39 MIS. $25,300,000 Planned Nov 25 New
FY 2034 35171(04) J3-5171(004)PM CaddoDivision 7 SH-8 Intersect Modif SH-8: AT PETREE ROAD, 1.0 MI. S. OF US-62 $2,000,0001 items Planned Nov 25 New
FY 2034 35176(04) J3-5176(004)PM ComancheDivision 7 SH-17 Grade,Drain,Bridge & Surface SH-17: FROM CYPRESS LANE ON THE E. SIDE OF ELGIN, E. 1.0 MI. $7,100,0001 items Planned Nov 25 New
FY 2034 35620(04) J3-5620(004)PM GradyDivision 7 SH-4 Resurface SH-4: FROM SH-37, NORTH 2.30 MILES $4,200,000 Planned Nov 25 New
FY 2034 36160(04) J3-6160(004)PM GradyDivision 7 SH-37 Grade,Drain,Bridge & Surface SH-37: FROM 2.04 MIS. E. OF THE CADDO C/L, EXTEND E. 6.7 MIS. TO JCT SH-37/US-81 $15,300,0001 items Planned Nov 25 New
FY 2034 39466(04) J3-9466(004)PM MurrayDivision 7 SH-7 Resurface SH-7: FROM 0.52 MILES EAST OF US-77N, EAST 5.22 MILES $4,200,000 Planned Nov 25 New
FY 2034 39467(04) J3-9467(004)PM ComancheDivision 7 I-44 Resurface I-44: FROM 0.85 MILES NORTH OF US-62 (ROGERS LANE), NORTH 5.60 MILES $4,200,000 Planned Nov 25 New
FY 2034 39468(04) J3-9468(004)PM MurrayDivision 7 I-35 Resurface I-35: FROM MM 45.8, NORTH 6.60 MILES TO MM 52.4 $4,200,000 Planned Nov 25 New
FY 2034 39469(04) J3-9469(004)PM StephensDivision 7 SH-7 Resurface SH-7: FROM 6.04 MILES EAST OF SH-65, EAST 7.65 MILES $4,200,000 Planned Nov 25 New
1–10 of 10

Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.