| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 1, 2026 estimated | 31893(04) NHPP-210N(113)PM | CarterDivision 7 | SH-142 | Bridge & Approaches SH-142: OVER THE BNSF RAILROAD 3.8 MIS. E. OF I-35 | $17,600,0001 items | Planned | ||
| Apr 1, 2027 estimated | 30364(04) STP-226B(164)PM | GradyDivision 7 | US-277 | Bridge & Approaches US-277: OVER SMITH CREEK 2.7 MIS. W. OF US-81 | $7,300,0001 items | Planned | ||
| Apr 1, 2027 estimated | 31079(04) J3-1079(004)PM | TulsaDivision 8 | SH-11 | Bridge & Approaches SH-11: OVER BIRD CREEK, LOCATED 2 MI SOUTH WASHINGTON C/L | $5,600,0001 items | Planned | ||
| Apr 1, 2027 estimated | 32100(04) J3-2100(004)PM | MuskogeeSequoyahDivision 1 | SH-100 | Bridge & Approaches SH-100: OVER ARKANSAS RIVER AT THE MUSKOGEE/SEQUOYAH C/L | $33,555,0001 items | Planned | ||
| May 1, 2027 estimated | 32159(04) J3-2159(004)PM | CoalDivision 3 | US-75 | Bridge & Approaches US-75: OVER BLACK CREEK, 6.5 MILES NORTH OF SH-3 | $3,700,0001 items | Planned | ||
| Jul 1, 2027 estimated | 29829(04) J2-9829(004)PM | CreekDivision 8 | SH-99 | Bridge & Approaches SH-99: OVER THE CIMARRON RIVER, 4.4 MILES E S PAYNE C/L | $8,400,0001 items | Planned | ||
| Aug 1, 2027 estimated | 31692(04) J3-1692(004)PM | BeckhamDivision 5 | I-40 | Bridge & Approaches I-40: AT TURKEY CR, EAST & WEST BOUND LANES AND SAND CR EAST BOUND LANES, LOCATED 16.2 & 19.9 MILES EAST OF THE TEXAS STATE LINE. | $12,000,0003 items | Planned | ||
| Sep 1, 2027 estimated | 29682(04) J2-9682(004)PM | CreekDivision 8 | SH-16 | Bridge & Approaches SH-16: OVER SAND CREEK, 0.7 MILES EAST OF THE JCT. SH-48 | $7,100,0001 items | Planned | ||
| Sep 1, 2027 estimated | 34236(04) J3-4236(004)FP | HarmonDivision 5 | US-62 | Bridge & Approaches US-62: AT THE EAST FORK OF SANDY CREEK LOCATED 2.9 M EAST OF SH-30. | $4,600,0001 items | Planned | ||
| Sep 1, 2027 estimated | 34970(04) J3-4970(004)PM | HarmonDivision 5 | SH-30 | Bridge & Approaches SH-30: AT EAST FORK OF SANDY CREEK, LOCATED 3.4 M NORTH OF US-62. | $3,100,0001 items | Planned | ||
| Feb 1, 2028 estimated | 35578(04) J3-5578(004)PM | BeckhamDivision 5 | SH-152 | Bridge & Approaches SH-152: OVER DEEP CREEK, 1.9 MILES EAST OF US-283. | $4,100,0001 items | Planned | ||
| Apr 1, 2028 estimated | 39375(04) J3-9375(004)PM | CanadianDivision 4 | I-40 | Bridge & Approaches I-40: UNDER NORTH CIMARRON ROAD 7.0 MILES EAST OF US-81 | $15,500,0001 items | Planned | ||
| May 1, 2028 estimated | 27119(04) J2-7119(004)PM | KayDivision 4 | US-177 | Bridge & Approaches US-177: OVER UNNAMED CREEK 7.3 MILES NORTH OF SH-11 | $1,100,0001 items | Planned | ||
| May 1, 2028 estimated | 32689(04) J3-2689(004)PM | CanadianDivision 4 | I-40 | Bridge & Approaches I-40: COUNTRY CLUB ROAD OVER I-40, 2 MILES WEST OF US-81 | $18,100,0001 items | Planned | ||
| Jun 1, 2028 estimated | 36262(04) J3-6262(004)PM | NobleDivision 4 | SH-15 | Bridge & Approaches SH-15: OVER UNNAMED CREEK 5.7 MILES EAST OF THE GARFIELD C/L | $1,500,0001 items | Planned | ||
| Jul 1, 2028 estimated | 27123(04) J2-7123(004)PM | KayDivision 4 | US-177 | Bridge & Approaches US-177: OVER UNNAMED CREEK 5.6 MILES NORTH OF SH-11 | $900,0001 items | Planned | ||
| Aug 1, 2028 estimated | 28029(04) STP-211C(087)PM | CherokeeDivision 1 | SH-100 | Bridge & Approaches SH-100: OVER DRY CREEK, 0.5 MILES EAST OF JCT SH-82 | $14,200,0001 items | Planned | ||
| Aug 1, 2028 estimated | 29849(04) J2-9849(004)PM | KingfisherDivision 4 | US-81 | Bridge & Approaches US-81: NB & SB BRIDGES OVER THE UP RAILROAD 5.3 MILES NORTH OF SH-33 | $21,600,0002 items | Planned | ||
| Nov 1, 2028 estimated | 35217(04) J3-5217(004)PM | LincolnDivision 3 | SH-66 | Bridge & Approaches SH-66: OVER SLWC RAILROAD, 0.9 MILES EAST OF SH-18 | $2,300,0001 items | Planned | ||
| Jan 1, 2029 estimated | 35156(04) J3-5156(004)PM | TulsaDivision 8 | US-169 | Bridge & Approaches US-169: UNDER E. 96TH STREET. APPROX. 5 MILES NORTH OF SH-266 | $9,400,0001 items | Planned | ||
| Feb 1, 2029 estimated | 35773(04) J3-5773(004)PM | CimarronDivision 6 | SH-325 | Bridge & Approaches SH-325: OVER S CARRIZO CREEK, 9.8 MI EAST OF THE NEW MEXICO S/L | $4,800,0001 items | Planned | ||
| Mar 1, 2029 estimated | 28993(04) J2-8993(004)PM | KayDivision 4 | US-60B | Bridge & Approaches US-60B: EB & WB OVER BOIS D' ARC CREEK 0.5 MIS. E. OF THE US-60 JCT. | $6,900,0002 items | Planned | ||
| May 1, 2029 estimated | 34969(04) J3-4969(004)FP | HarmonDivision 5 | US-62 | Bridge & Approaches US-62: AT THE WEST FORK OF SANDY CREEK, LOCATED 0.3 M EAST OF THE TEXAS STATE LINE. | $4,200,0001 items | Planned | ||
| Jul 1, 2029 estimated | 36141(04) J3-6141(004)PM | BeckhamDivision 5 | I-40B | Bridge & Approaches I-40B: OVER W FORK OF ELK CR, 4.0 MILES NE OF THE WEST I-40 JCT IN ELK CITY. | $3,000,0001 items | Planned | ||
| Aug 1, 2029 estimated | 34334(04) J3-4334(004)FP | MuskogeeSequoyahDivision 1 | I-40 | Bridge & Approaches I-40: OVER ARKANSAS RIVER, BEGIN MP 290, E 1.0 MI | $86,000,0001 items | Planned | ||
| FY 2030 | 32824(04) J3-2824(004)PM | HaskellDivision 1 | SH-71 | Bridge & Approaches SH-71: OVER LONGTOWN CREEK, FROM 1.15 MI. N. OF PITTSBURG C/L, N. .3 MI | $3,800,000 | Planned | ||
| FY 2030 | 34251(04) J3-4251(004)PM | SeminoleDivision 3 | SH-59 | Bridge & Approaches SH-59: OVER UNNAMED CREEK, 1.0 MILE EAST OF US-270 | $2,300,0001 items | Planned | ||
| FY 2030 | 35015(04) J3-5015(004)PM | SeminoleDivision 3 | SH-9 | Bridge & Approaches SH-9: OVER TIGER & UNNAMED CREEKS, 4.9 & 5.0 MILES EAST OF SH-99 | $4,900,0002 items | Planned | ||
| FY 2030 | 35427(04) J3-5427(004)PM | WashitaDivision 5 | SH-152 | Bridge & Approaches SH-152: OVER THE WASHITA RIVER AND OVERFLOW LOCATED 8.25 AND 8.5 MILES EAST OF US-183. | $9,200,0002 items | Planned | ||
| FY 2030 | 35692(04) J3-5692(004)PM | CaddoDivision 7 | US-281 | Bridge & Approaches US-281: OVER MEDICINE CREEK, APPROX. 2.64 MIS. W. OF JCT US-281/SH-152E | $4,800,0001 items | Planned | ||
| FY 2030 | 35693(04) J3-5693(004)PM | CaddoDivision 7 | SH-37 | Bridge & Approaches SH-37: OVER BUGGY CREEK, APPROX. 0.80 MIS. S. OF CANADIAN C/L | $4,400,0001 items | Planned | ||
| FY 2030 | 35715(04) J3-5715(004)PM | KiowaDivision 5 | SH-9B | Bridge & Approaches SH-9B: OVER AN UNNAMED CREEK, 1.5 MILES NORTH AND EAST OF SH-9 IN HOBART. | $1,400,0001 items | Planned | ||
| FY 2030 | 36143(04) J3-6143(004)PM | CusterDivision 5 | I-40 | Bridge & Approaches I-40: S FRONTAGE ROAD OVER BEAR CR, 3.7 MILES EAST OF THE I-40B EAST JCT IN CLINTON. | $2,800,0001 items | Planned | ||
| FY 2030 | 36144(04) J3-6144(004)PM | CusterDivision 5 | I-40 | Bridge & Approaches I-40: N FRONTAGE ROAD OVER UNNAMED CR, 0.4 MILE WEST OF SH-54. | $1,300,0001 items | Planned | ||
| FY 2031 | 34238(04) J3-4238(004)PM | WashitaDivision 5 | SH-54B | Bridge & Approaches SH-54B: AT AN UNNAMED CREEK LOCATED 2.6 M EAST OF SH-54. | $1,400,0001 items | Planned | ||
| FY 2031 | 34246(04) J3-4246(004)PM | GarvinDivision 3 | SH-76 | Bridge & Approaches SH-76: OVER UNNAMED CREEK, 4.8 MILES NORTH OF CARTER COUNTY LINE | $2,900,0002 items | Planned | ||
| FY 2031 | 35462(04) J3-5462(004)PM | TulsaDivision 8 | US-75 | Bridge & Approaches US-75: AT 96TH STREET NORTH 10.3 MILES NORTH OF I-244 | $5,000,000 | Planned | ||
| FY 2031 | 35464(04) J3-5464(004)PM | TulsaDivision 8 | US-75 | Bridge & Approaches US-75: AT 126TH STREET NORTH, 2 MILES SOUTH OF SH-20 JCT. | $5,000,000 | Planned | ||
| FY 2031 | 35691(04) J3-5691(004)PM | CaddoDivision 7 | US-281 | Bridge & Approaches US-281: OVER WILDCAT & FLAT DRAW CREEKS, APPROX. 0.52 MIS. & 0.64 MIS. W. OF JCT US-281/SH-152E | $5,200,0002 items | Planned | ||
| FY 2031 | 36179(04) J3-6179(004)PM | LincolnDivision 3 | US-177 | Bridge & Approaches US-177: OVER BELLCOW CREEK, 6.2 MILES NORTH OF SH-66 | $2,200,0001 items | Planned | ||
| FY 2032 | 33465(04) J3-3465(004)PM | SequoyahDivision 1 | US-64 | Bridge & Approaches US-64: OVER GARRISON CR. TRIB. O'FLOW, & GENERAL OVERFLOWS APPROX. 20 MI. EAST OF US-59 JCT. WB ONLY | $11,600,0003 items | Planned | ||
| FY 2032 | 33465(07) J3-3465(007)PM | SequoyahDivision 1 | US-64 | Bridge & Approaches US-64: OVER GARRISON CR. TRIB. O'FLOW, & GENERAL OVERFLOWS APPROX. 20 MI. EAST OF US-59 JCT. WB ONLY | $10,200,0002 items | Planned | ||
| FY 2032 | 33793(04) STP-246C(068)PM | McIntoshDivision 1 | SH-9 | Bridge & Approaches SH-9: OVER UNNAMED CRK & WALLACE CRK 6.0 & 6.2 MI E OF JCT SH-52 | $8,600,0002 items | Planned | ||
| FY 2032 | 34338(04) J3-4338(004)PM | MuskogeeDivision 1 | US-64B | Bridge & Approaches US-64B: OVER UP R.R., APPROX. 2.25 MI S OF US-64B / US-62B JCT. | $7,500,0002 items | Planned | ||
| FY 2032 | 35612(04) J3-5612(004)PM | KayDivision 4 | US-60 | Bridge & Approaches US-60: OVER US-77 2 MILES EAST OF I-35 NEAR TONKAWA | $2,000,0002 items | Planned | ||
| FY 2032 | 35846(04) J3-5846(004)PM | OkmulgeeDivision 1 | US-75 | Bridge & Approaches US-75: OVER OKMULGEE CREEK, 2.27 MI N OF US-62 JCT. | $5,600,0002 items | Planned | ||
| FY 2032 | 36140(04) J3-6140(004)PM | BeckhamDivision 5 | I-40 | Bridge & Approaches I-40: SOUTH FRONTAGE ROAD OVER TIMBER CREEK AND OVERFLOW, 2.7 & 2.8 MILES EAST OF EAST I-40B JCT IN SAYRE. | $3,600,0002 items | Planned | ||
| FY 2033 | 29610(04) J2-9610(004)PM | OttawaDivision 8 | US-60 | Bridge & Approaches US-60: OVER SPRING AND NEOSHO RIVER, 11.1 MI EAST OF US-69 | $39,400,0002 items | Planned | ||
| FY 2033 | 29846(04) J2-9846(004)FP | OklahomaDivision 4 | I-40 | Bridge & Approaches I-40: EB & WB BRIDGES OVER SUNNYLANE 2 MILES EAST OF I-35 | $31,000,0002 items | Planned | ||
| FY 2033 | 30397(04) J3-0397(004)PM | PittsburgDivision 2 | US-69 | Bridge & Approaches US-69: OVER DANCING RABBIT CREEK, APPROX. 0.2 MI NORTH OF INDIAN NATION TNP | $5,400,0002 items | Planned | ||
| FY 2033 | 31263(04) J3-1263(004)PM | PottawatomieDivision 3 | SH-39 | Bridge & Approaches SH-39: OVER CHISM CREEK AND TWO UNNAMED CREEKS, FROM 2.0 MILES EAST OF US-177, EAST 0.8 MILE | $9,000,0003 items | Planned | ||
| FY 2033 | 34247(04) J3-4247(004)PM | SeminoleDivision 3 | US-270 | Bridge & Approaches US-270: OVER UNNAMED CREEK, 0.6 MILES SOUTHEAST OF SH-56 | $3,400,0001 items | Planned | ||
| FY 2033 | 34946(04) J3-4946(004)PM | PittsburgDivision 2 | SH-31 | Bridge & Approaches SH-31: OVER BLUE CREEK, 13.45 MI EAST OF JCT US-270 | $5,500,0001 items | Planned | ||
| FY 2033 | 34971(04) J3-4971(004)PM | CusterDivision 5 | SH-33 | Bridge & Approaches SH-33: AT UNNAMED CREEK LOCATED 1.4 M EAST OF SH-34. | $2,400,0001 items | Planned | ||
| FY 2033 | 35009(04) J3-5009(004)PM | ChoctawDivision 2 | US-271 | Bridge & Approaches US-271: OVER THE RED RIVER & CO RD AT THE OK/TX STATELINE | $23,000,0002 items | Planned | ||
| FY 2033 | 35597(04) J3-5597(004)PM | Le FloreDivision 2 | SH-83 | Bridge & Approaches SH-83: OVER COWSKIN CREEK, 7.55 MI EAST OF JCT US-59 | $3,000,0001 items | Planned | ||
| FY 2033 | 35844(04) J3-5844(004)PM | McIntoshDivision 1 | US-266 | Bridge & Approaches US-266: OVER UNNAMED CREEK, 0.7 MI W OF US-69 JCT. | $2,700,0001 items | Planned | ||
| FY 2033 | 36142(04) J3-6142(004)PM | CaddoDivision 5 | I-40 | Bridge & Approaches I-40: SOUTH FRONTAGE ROAD OVER UNNAMED CR, 1.3 MILES E OF THE CUSTER C/L. | $4,600,0001 items | Planned | ||
| FY 2033 | 36145(04) J3-6145(004)PM | WashitaDivision 5 | I-40 | Bridge & Approaches I-40: N FRONTAGE ROAD OVER TURKEY CR, 6.5 MILES EAST OF THE BECKHAM C/L. | $2,200,0001 items | Planned | ||
| FY 2033 | 36146(04) J3-6146(004)PM | WashitaDivision 5 | I-40 | Bridge & Approaches I-40: S FRONTAGE ROAD OVER CLINTON LAKE, 8.1 MILES EAST OF THE BECKHAM C/L. | $2,600,0001 items | Planned | ||
| FY 2033 | 36186(04) J3-6186(004)PM | PottawatomieDivision 3 | US-177 | Bridge & Approaches US-177: OVER LITTLE RIVER, 1.9 MILES NORTH OF SH-59B | $5,000,0001 items | Planned | ||
| FY 2033 | 36187(04) J3-6187(004)PM | GarvinDivision 3 | SH-76 | Bridge & Approaches SH-76: OVER RUSH CREEK, 1.1 MILES NORTH OF STEPHENS COUNTY LINE | $3,000,0001 items | Planned | ||
| FY 2033 | 36369(04) J3-6369(004)PM | RogersDivision 8 | US-412 | Bridge & Approaches US-412: AT 289TH E AVE. APPROX. 4.3 MILES EAST OF I-44 JCT. | $12,000,000 | Planned | ||
| FY 2034 | 29574(04) J2-9574(004)PM | CaddoDivision 7 | US-281 | Bridge & Approaches US-281: OVER WASHITA RIVER AND TWO O'FLOWS FROM APPROX 0.74 MILES N. OF US-62 EXTEND N. APPROX 0.71 MILES | $21,500,0003 items | Planned | ||
| FY 2034 | 29850(04) J2-9850(004)PM | OklahomaDivision 4 | I-40 | Bridge & Approaches I-40: EB & WB BRIDGES OVER MACARTHUR BLVD. 3.0 MIS. E. OF THE CANADIAN C/L | $45,000,0002 items | Planned | ||
| FY 2034 | 30391(04) J3-0391(004)FP | ClevelandOklahomaDivision 3 | I-44 | Bridge & Approaches I-44: FROM JUST SOUTH OF 89TH STREET, NORTH TO 0.5 MI NORTH OF 89TH STREET IN OKC | $4,500,0002 items | Planned | ||
| FY 2034 | 33765(04) J3-3765(004)PM | TillmanDivision 5 | SH-36 | Bridge & Approaches SH-36: AT DEEP RED, DEEP RED O'FLOW & ONE UNNAMED CR LOCATED 3.9, 4.0 & 4.2 M NORTH OF US-70. | $6,500,0003 items | Planned | ||
| FY 2034 | 33788(29) J3-3788(029)PM | TulsaDivision 8 | I-44 | Bridge & Approaches I-44: OVER THE ARKANSAS RIVER .5 MILE EAST OF US-75 WP 6 | $80,700,000 | Planned | ||
| FY 2034 | 38545(05) J3-8545(005)PM | McClainDivision 3 | I-35 | Bridge & Approaches I-35: NORTHBOUND AND SOUTHBOUND OVER SH-39 | $21,000,0002 items | Planned | ||
| FY 2035 | 31853(04) NHPP-022N(252)FP | ChoctawDivision 2 | US-70 | Bridge & Approaches US-70: BEGIN 11.5 MI EAST OF THE BRYAN C/L, EXTEND EAST 0.3 MI | $8,000,000 | Planned | ||
| FY 2035 | 35499(04) J3-5499(004)PM | TulsaDivision 8 | US-169 | Bridge & Approaches US-169: AT 86TH STREET 9.6 MILES NORTH OF I-44 | $10,000,0001 items | Planned |
1–71 of 71
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.