‹ Jan 2018 results
14-00016-02-PV
- Let date
- Friday, January 19, 2018
- Contract
- 97661 · job page
- District
- District 8
- County
- Madison
- Highway
- Limits
- Reconstruction of East Main Street from Lakeview Access Road west for 1,550 ft. ,in the Village of Maryville.
- Classification
- ·
- Project number
Bidders 9
| # | Contractor | Total bid | vs estimate | vs low |
| EE | Engineer's estimate | — | | |
| 1 |
Keller Construction, Inc. Low bidder |
$869,486 |
|
|
| 2 |
Baxmeyer Construction, Inc. |
$962,788 |
|
+10.7% |
| 3 |
Hank's Excavating & Landscaping, Inc. |
$999,427 |
|
+14.9% |
| 4 |
RCS Construction, Inc. |
$1,012,195 |
|
+16.4% |
| 5 |
Lake Contracting, Inc. |
$1,052,418 |
|
+21.0% |
| 6 |
Bruce Concrete Construction Inc. |
$1,078,848 |
|
+24.1% |
| 7 |
Stutz Excavating, Inc. |
$1,098,668 |
|
+26.4% |
| 8 |
The Kilian Corporation |
$1,171,008 |
|
+34.7% |
| 9 |
Supplied Industrial Solutions, Inc. |
$1,291,301 |
|
+48.5% |
Bid tab: unit prices 79 items
ExcelCSV
| Seq | Bid code | Description | Qty | Unit | Estimate |
#1 Keller Construc… | #2 Baxmeyer Constr… | #3 Hank's Excavati… | #4 RCS Constructio… | #5 Lake Contractin… | #6 Bruce Concrete … | #7 Stutz Excavatin… | #8 The Kilian Corp… |
| 1 | XX009207 |
CMP CULVERT EL 8X12 | 16 | FOOT |
|
$651.48 |
$813.00 |
$340.00 |
$756.00 |
$680.00 |
$714.48 |
$650.00 |
$450.00 |
| 2 | XX009208 |
ENERGY DISSIPAT OUTFL | 1 | EACH |
|
$3,885.00 |
$3,650.00 |
$4,800.00 |
$5,273.65 |
$11,320.10 |
$1,937.33 |
$4,500.00 |
$6,000.00 |
| 3 | X0327301 |
RELOCATE EX MAILBOX | 1 | EACH |
|
$135.00 |
$150.00 |
$250.00 |
$182.50 |
$300.00 |
$539.95 |
$200.00 |
$150.00 |
| 4 | X1200160 |
CONN EX DRG STRUCTURE | 1 | EACH |
|
$611.51 |
$900.00 |
$1,200.00 |
$636.60 |
$850.00 |
$670.61 |
$665.00 |
$425.00 |
| 5 | X2200018 |
ORNAMENTAL FENCE | 728 | FOOT |
|
$63.76 |
$66.00 |
$42.80 |
$79.48 |
$65.52 |
$95.83 |
$65.65 |
$64.50 |
| 6 | X6024242 |
INLETS SPL N1 | 24 | EACH |
|
$1,726.59 |
$1,680.00 |
$1,300.00 |
$1,809.53 |
$1,850.00 |
$1,894.36 |
$1,435.00 |
$1,925.00 |
| 7 | X6024244 |
INLETS SPL N2 | 2 | EACH |
|
$1,509.55 |
$1,620.00 |
$1,500.00 |
$1,901.24 |
$1,750.00 |
$1,656.10 |
$1,250.00 |
$1,745.00 |
| 8 | X6024246 |
INLETS SPL N3 | 2 | EACH |
|
$2,718.61 |
$3,300.00 |
$2,800.00 |
$2,723.08 |
$2,988.00 |
$2,983.89 |
$2,600.00 |
$2,845.00 |
| 9 | X6024248 |
INLETS SPL N4 | 1 | EACH |
|
$3,870.19 |
$3,700.00 |
$3,500.00 |
$3,536.11 |
$4,225.00 |
$4,248.30 |
$3,730.00 |
$3,950.00 |
| 10 | X7010216 |
TRAF CONT & PROT SPL | 1 | L SUM |
|
$8,200.00 |
$8,800.00 |
$22,000.00 |
$8,639.14 |
$19,000.00 |
$8,423.16 |
$11,600.00 |
$8,500.00 |
| 11 | X7030005 |
TEMP PAVT MKING REMOV | 1,087 | SQ FT |
|
$1.02 |
$1.00 |
$0.8500 |
$0.8600 |
$1.10 |
$0.8600 |
$0.8500 |
$0.00 |
| 12 | X7830070 |
GRV RCSD PVT MRKG 5 | 3,100 | FOOT |
|
$1.02 |
$1.30 |
$1.30 |
$1.35 |
$1.35 |
$1.35 |
$1.30 |
$1.30 |
| 13 | X7830078 |
GRV RCSD PVT MRKG 13 | 54 | FOOT |
|
$2.55 |
$14.00 |
$14.00 |
$14.58 |
$2.95 |
$14.58 |
$14.00 |
$13.75 |
| 14 | Z0056610 |
STORM SEW WM REQ 15 | 190 | FOOT |
|
$46.73 |
$61.00 |
$56.00 |
$52.93 |
$50.50 |
$51.25 |
$93.75 |
$54.00 |
| 15 | Z0056612 |
STORM SEW WM REQ 18 | 104 | FOOT |
|
$55.40 |
$73.00 |
$65.00 |
$67.26 |
$59.55 |
$60.79 |
$83.25 |
$68.00 |
| 16 | Z0056616 |
STORM SEW WM REQ 24 | 15 | FOOT |
|
$96.06 |
$133.00 |
$100.00 |
$116.17 |
$102.50 |
$105.41 |
$113.00 |
$125.00 |
| 17 | 20100210 |
TREE REMOV OVER 15 | 96 | UNIT |
|
$31.03 |
$51.00 |
$32.00 |
$33.51 |
$34.13 |
$34.02 |
$68.00 |
$53.00 |
| 18 | 20100500 |
TREE REMOV ACRES | 0.2 | ACRE |
|
$59,546.80 |
$71,500.00 |
$62,500.00 |
$64,281.86 |
$65,501.00 |
$65,264.17 |
$44,500.00 |
$9,200.00 |
| 19 | 20200100 |
EARTH EXCAVATION | 3,432 | CU YD |
|
$14.93 |
$15.75 |
$12.00 |
$16.12 |
$16.50 |
$16.35 |
$16.50 |
$23.00 |
| 20 | 20800150 |
TRENCH BACKFILL | 696 | CU YD |
|
$38.62 |
$22.00 |
$24.00 |
$28.47 |
$42.00 |
$42.37 |
$33.15 |
$27.50 |
| 21 | 25000100 |
SEEDING CL 1 | 0.9 | ACRE |
|
$1,742.02 |
$2,850.00 |
$1,850.00 |
$1,881.39 |
$1,852.00 |
$1,908.99 |
$46.20 |
$1,325.00 |
| 22 | 25000400 |
NITROGEN FERT NUTR | 81 | POUND |
|
$1.43 |
$2.00 |
$4.45 |
$1.55 |
$1.75 |
$1.57 |
$1.20 |
$1.30 |
| 23 | 25000500 |
PHOSPHORUS FERT NUTR | 81 | POUND |
|
$1.43 |
$2.00 |
$4.45 |
$1.55 |
$1.75 |
$1.57 |
$1.20 |
$1.30 |
| 24 | 25000600 |
POTASSIUM FERT NUTR | 81 | POUND |
|
$1.43 |
$2.00 |
$4.45 |
$1.55 |
$1.75 |
$1.57 |
$1.20 |
$1.30 |
| 25 | 25100115 |
MULCH METHOD 2 | 0.66 | ACRE |
|
$2,105.85 |
$2,420.00 |
$4,100.00 |
$2,274.20 |
$2,305.00 |
$2,306.92 |
$1,340.00 |
$2,050.00 |
| 26 | 25100630 |
EROSION CONTR BLANKET | 917 | SQ YD |
|
$1.37 |
$2.25 |
$1.05 |
$1.48 |
$1.50 |
$1.50 |
$1.70 |
$1.40 |
| 27 | 25100635 |
HD EROS CONTR BLANKET | 255 | SQ YD |
|
$1.70 |
$2.75 |
$1.40 |
$1.84 |
$2.00 |
$1.86 |
$1.90 |
$2.00 |
| 28 | 28000250 |
TEMP EROS CONTR SEED | 90 | POUND |
|
$2.52 |
$9.50 |
$6.00 |
$6.34 |
$2.75 |
$8.40 |
$10.75 |
$4.00 |
| 29 | 28000400 |
PERIMETER EROS BAR | 1,173 | FOOT |
|
$1.98 |
$3.25 |
$1.90 |
$2.14 |
$2.25 |
$2.16 |
$3.35 |
$3.20 |
| 30 | 28000500 |
INLET & PIPE PROTECT | 36 | EACH |
|
$115.07 |
$120.00 |
$225.00 |
$124.26 |
$125.00 |
$125.94 |
$142.00 |
$105.00 |
| 31 | 28100803 |
STONE DUMP RIP CL A2 | 4 | TON |
|
$130.07 |
$137.00 |
$90.00 |
$140.67 |
$139.00 |
$142.56 |
$150.00 |
$100.00 |
| 32 | 28100807 |
STONE DUMP RIP CL A4 | 59 | TON |
|
$58.68 |
$60.00 |
$40.00 |
$63.37 |
$64.00 |
$64.36 |
$55.50 |
$55.00 |
| 33 | 28200200 |
FILTER FABRIC | 65 | SQ YD |
|
$2.55 |
$2.50 |
$5.00 |
$2.74 |
$2.85 |
$2.81 |
$3.50 |
$1.50 |
| 34 | 31100700 |
SUB GRAN MAT A 8 | 5,712 | SQ YD |
|
$9.42 |
$7.30 |
$9.00 |
$11.42 |
$9.75 |
$10.42 |
$10.50 |
$11.50 |
| 35 | 40201000 |
AGGREGATE-TEMP ACCESS | 350 | TON |
|
$20.00 |
$21.00 |
$28.00 |
$23.78 |
$23.00 |
$39.17 |
$24.50 |
$27.00 |
| 36 | 42000060 |
WELDED WIRE REINF | 4,477 | SQ YD |
|
$5.76 |
$6.00 |
$8.50 |
$6.88 |
$6.69 |
$6.69 |
$16.50 |
$9.50 |
| 37 | 42000301 |
PCC PVT 8 JOINTED | 4,477 | SQ YD |
|
$36.62 |
$39.00 |
$40.00 |
$40.20 |
$30.50 |
$47.71 |
$41.50 |
$53.00 |
| 38 | 42001300 |
PROTECTIVE COAT | 8,011 | SQ YD |
|
$0.00 |
$0.0100 |
$0.6000 |
$1.14 |
$0.8600 |
$0.5100 |
$0.1000 |
$1.25 |
| 39 | 42300200 |
PCC DRIVEWAY PAVT 6 | 197 | SQ YD |
|
$59.25 |
$68.00 |
$85.00 |
$58.77 |
$62.50 |
$53.10 |
$73.00 |
$76.00 |
| 40 | 42300400 |
PCC DRIVEWAY PAVT 8 | 756 | SQ YD |
|
$59.81 |
$72.00 |
$84.00 |
$62.94 |
$63.50 |
$62.14 |
$80.00 |
$79.00 |
| 41 | 42400100 |
PC CONC SIDEWALK 4 | 13,936 | SQ FT |
|
$4.10 |
$4.75 |
$5.00 |
$5.57 |
$5.75 |
$5.79 |
$4.25 |
$6.25 |
| 42 | 42400800 |
DETECTABLE WARNINGS | 24 | SQ FT |
|
$27.00 |
$15.00 |
$60.00 |
$38.16 |
$25.00 |
$30.60 |
$24.00 |
$55.00 |
| 43 | 44000100 |
PAVEMENT REM | 718 | SQ YD |
|
$4.81 |
$7.25 |
$9.00 |
$5.17 |
$4.95 |
$5.27 |
$8.00 |
$6.50 |
| 44 | 44000200 |
DRIVE PAVEMENT REM | 583 | SQ YD |
|
$5.96 |
$4.00 |
$22.00 |
$6.44 |
$5.96 |
$6.52 |
$11.45 |
$7.00 |
| 45 | 44004000 |
PAVED DITCH REMOVAL | 69 | FOOT |
|
$3.76 |
$3.00 |
$9.00 |
$4.07 |
$4.00 |
$4.12 |
$6.50 |
$4.25 |
| 46 | 44201329 |
CL C PATCH T2 8 | 16 | SQ YD |
|
$302.40 |
$203.00 |
$190.00 |
$132.97 |
$180.00 |
$337.50 |
$530.00 |
$130.00 |
| 47 | 50105220 |
PIPE CULVERT REMOV | 240 | FOOT |
|
$6.57 |
$6.00 |
$10.00 |
$7.10 |
$7.25 |
$7.20 |
$11.50 |
$11.00 |
| 48 | 52200800 |
SEG CONC BLOCK WALL | 3,105 | SQ FT |
|
$30.62 |
$37.50 |
$42.00 |
$33.14 |
$37.50 |
$39.96 |
$34.00 |
$36.50 |
| 49 | 542C0211 |
P CUL CL C 1 6 | 46 | FOOT |
|
$9.85 |
$13.70 |
$13.00 |
$36.11 |
$11.00 |
$10.80 |
$15.75 |
$26.00 |
| 50 | 54213660 |
PRC FLAR END SEC 15 | 3 | EACH |
|
$759.84 |
$650.00 |
$575.00 |
$768.93 |
$825.00 |
$833.01 |
$620.00 |
$515.00 |
| 51 | 54213669 |
PRC FLAR END SEC 24 | 2 | EACH |
|
$933.70 |
$850.00 |
$735.00 |
$920.11 |
$10.20 |
$1,023.79 |
$750.00 |
$785.00 |
| 52 | 550A0070 |
STORM SEW CL A 1 15 | 747 | FOOT |
|
$32.10 |
$36.75 |
$35.00 |
$36.74 |
$35.00 |
$35.21 |
$61.50 |
$53.00 |
| 53 | 550A0090 |
STORM SEW CL A 1 18 | 297 | FOOT |
|
$46.63 |
$37.75 |
$40.00 |
$46.04 |
$49.00 |
$51.15 |
$67.00 |
$45.00 |
| 54 | 550A0120 |
STORM SEW CL A 1 24 | 16 | FOOT |
|
$57.27 |
$59.75 |
$64.00 |
$91.00 |
$62.00 |
$62.84 |
$111.00 |
$76.00 |
| 55 | 550A0360 |
STORM SEW CL A 2 15 | 282 | FOOT |
|
$38.63 |
$46.50 |
$42.00 |
$52.67 |
$41.50 |
$42.07 |
$89.00 |
$50.00 |
| 56 | 550B0040 |
STORM SEW CL B 1 10 | 46 | FOOT |
|
$30.04 |
$19.00 |
$20.00 |
$40.90 |
$33.00 |
$32.96 |
$27.00 |
$40.00 |
| 57 | 55100200 |
STORM SEWER REM 6 | 25 | FOOT |
|
$8.44 |
$6.00 |
$17.00 |
$13.39 |
$9.75 |
$9.24 |
$4.50 |
$13.00 |
| 58 | 55100900 |
STORM SEWER REM 18 | 123 | FOOT |
|
$6.37 |
$9.00 |
$10.00 |
$11.61 |
$7.50 |
$6.98 |
$22.50 |
$16.00 |
| 59 | 60108208 |
PIPE UNDERDR T 2 8 | 45 | FOOT |
|
$22.95 |
$33.00 |
$26.00 |
$54.70 |
$26.00 |
$25.18 |
$29.00 |
$31.00 |
| 60 | 60108300 |
PIPE UNDERDRAIN 8 SP | 51 | FOOT |
|
$14.16 |
$23.00 |
$13.00 |
$19.55 |
$17.00 |
$15.52 |
$17.00 |
$21.00 |
| 61 | 60218400 |
MAN TA 4 DIA T1F CL | 1 | EACH |
|
$1,642.70 |
$1,950.00 |
$1,700.00 |
$2,206.22 |
$1,850.00 |
$1,802.34 |
$1,825.00 |
$2,450.00 |
| 62 | 60235700 |
INLETS TA T3F&G | 1 | EACH |
|
$1,267.88 |
$1,050.00 |
$1,100.00 |
$1,362.82 |
$1,393.00 |
$1,390.90 |
$880.00 |
$1,305.00 |
| 63 | 60236200 |
INLETS TA T8G | 2 | EACH |
|
$1,154.48 |
$850.00 |
$835.00 |
$1,316.72 |
$1,269.00 |
$1,266.78 |
$880.00 |
$1,305.00 |
| 64 | 60237420 |
INLETS TA T20F&G | 1 | EACH |
|
$1,268.97 |
$1,100.00 |
$1,100.00 |
$1,316.66 |
$1,393.00 |
$1,391.98 |
$880.00 |
$1,305.00 |
| 65 | 60255500 |
MAN ADJUST | 1 | EACH |
|
$503.09 |
$180.00 |
$500.00 |
$601.50 |
$525.00 |
$551.82 |
$575.00 |
$405.00 |
| 66 | 60256910 |
MAN ADJ NEW T20F&G | 1 | EACH |
|
$1,208.05 |
$1,225.00 |
$1,800.00 |
$965.42 |
$1,405.00 |
$1,323.95 |
$985.00 |
$810.00 |
| 67 | 60500040 |
REMOV MANHOLES | 2 | EACH |
|
$298.07 |
$425.00 |
$650.00 |
$395.26 |
$330.00 |
$326.68 |
$450.00 |
$675.00 |
| 68 | 60605000 |
COMB CC&G TB6.24 | 3,100 | FOOT |
|
$9.85 |
$23.45 |
$27.00 |
$25.89 |
$35.00 |
$23.40 |
$22.60 |
$31.00 |
| 69 | 60617900 |
PAVED FLUME | 1 | SQ YD |
|
$402.00 |
$375.00 |
$850.00 |
$556.14 |
$2,600.00 |
$429.85 |
$500.00 |
$300.00 |
| 70 | 66400105 |
CH LK FENCE 4 | 128 | FOOT |
|
$25.30 |
$26.00 |
$26.00 |
$39.05 |
$26.00 |
$28.62 |
$26.00 |
$25.50 |
| 71 | 67100100 |
MOBILIZATION | 1 | L SUM |
|
$28,250.00 |
$22,000.00 |
$10,000.00 |
$9,719.03 |
$49,913.13 |
$18,198.38 |
$37,000.00 |
$39,360.00 |
| 72 | 70300220 |
TEMP PVT MK LINE 4 | 3,100 | FOOT |
|
$0.00 |
$0.6000 |
$0.6000 |
$0.5900 |
$1.75 |
$0.5900 |
$0.6000 |
$0.00 |
| 73 | 70300260 |
TEMP PVT MK LINE 12 | 54 | FOOT |
|
$0.00 |
$9.00 |
$9.00 |
$9.45 |
$3.50 |
$9.46 |
$9.20 |
$0.00 |
| 74 | 72000100 |
SIGN PANEL T1 | 48 | SQ FT |
|
$22.19 |
$23.00 |
$23.00 |
$23.49 |
$24.25 |
$23.49 |
$22.85 |
$22.50 |
| 75 | 72900100 |
METAL POST TY A | 120 | FOOT |
|
$11.22 |
$12.00 |
$11.50 |
$11.88 |
$12.00 |
$11.88 |
$11.50 |
$11.35 |
| 76 | 72900200 |
METAL POST TY B | 41 | FOOT |
|
$12.75 |
$13.00 |
$13.00 |
$13.50 |
$13.75 |
$13.51 |
$13.00 |
$12.90 |
| 77 | 78003110 |
PREF PL PM TB LINE 4 | 3,100 | FOOT |
|
$2.55 |
$2.25 |
$2.35 |
$2.43 |
$2.75 |
$2.43 |
$2.35 |
$2.30 |
| 78 | 78003150 |
PREF PL PM TB LINE 12 | 54 | FOOT |
|
$8.42 |
$15.00 |
$14.00 |
$14.58 |
$9.10 |
$14.58 |
$14.20 |
$14.00 |
| 79 | 78100100 |
RAISED REFL PAVT MKR | 20 | EACH |
|
$96.90 |
$140.00 |
$135.00 |
$139.59 |
$110.00 |
$139.59 |
$135.00 |
$135.00 |
Showing the first 8 bidders. The Excel and CSV downloads include all 9.