| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| — | 1-81240-0000 1812400000 | District 1 | Halsted StIL-1 | Preservation - Pavements Crack & Joint Sealing 174th St to Ridge Rd | $50,000 | Planned | ||
| — | 1-81241-0000 1812410000 | District 1 | Cermak Rd | Preservation - Pavements Crack & Joint Sealing Riverside Dr to E of Cicero Ave | $325,000 | Planned | ||
| — | 1-81242-0000 1812420000 | District 1 | Grand AveIL-132 | Preservation - Pavements Crack & Joint Sealing US 45 to E of Hunt Club Rd | $255,000 | Planned | ||
| — | 1-81244-0000 1812440000 | District 1 | Busse RdIL-83 | Preservation - Pavements Crack & Joint Sealing S of Devon Ave to N of Foster Ave | $100,000 | Planned | ||
| — | 1-81247-0000 1812470000 | District 1 | Bishop Ford ExpwyIL-394 | Preservation - Pavements Crack & Joint Sealing S of 182nd St to S of Joe Orr Rd | $400,000 | Planned | ||
| — | 1-81248-0000 1812480000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Crack & Joint Sealing E of Sutton Rd to N of I-90 (Jane Addams Memorial Tollway) | $155,000 | Planned | ||
| — | 1-81250-0000 1812500000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Crack & Joint Sealing E of Barrington Rd to Glen Lake Rd | $215,000 | Planned | ||
| — | 1-81251-0000 1812510000 | District 1 | Harlem AveIL-43 | Preservation - Pavements Crack & Joint Sealing 111th St to 170th St | $590,000 | Planned | ||
| — | 1-81252-0000 1812520000 | District 1 | IL-83Kingery Hwy | Preservation - Pavements Crack & Joint Sealing ILL 19 to N of I-290 | $280,000 | Planned | ||
| — | 1-81254-0000 1812540000 | District 1 | Belvidere RdIL-120 | Preservation - Pavements Crack & Joint Sealing W of I-94 (Tri-State Tollway) to US 41 (Skokie Hwy) | $225,000 | Planned | ||
| — | 1-81255-0000 1812550000 | District 1 | IL-43Waukegan Rd | Preservation - Pavements Crack & Joint Sealing US 41 (Skokie Hwy) to Pulaski Dr/McGaw Rd | $50,000 | Planned | ||
| — | 1-81256-0000 1812560000 | District 1 | IL-31 | Preservation - Pavements Crack & Joint Sealing N of US 14 (Northwest Hwy) to Three Oaks Rd | $35,000 | Planned | ||
| — | 1-81257-0000 1812570000 | District 1 | FAP-305 | Preservation - Pavements Crack & Joint Sealing E of Leonard Rd to Ill 21 (Milwaukee Ave) | $140,000 | Planned | ||
| — | 1-81291-0000 1812910000 | District 1 | Marshfield Ave | Rehabilitation - Pavement Designed Overlay, Drainage 127th St to Vermont Ave | $300,000 | Planned | ||
| — | 1-81295-0000 1812950000 | District 1 | Archer Ave | Preservation - Pavements Smart Overlay S Archer Rd to Ill 43 (Harlem Ave) | $215,000 | Planned | ||
| — | 1-81299-1000 1812991000 | District 1 | Eisenhower ExpwyI-290IL-110 | Maintenance - Pavements Storm Sewer (New), Drainage Des Plaines River to Austin Blvd | $150,000,000 | Planned | ||
| — | 1-81299-2000 1812992000 | District 1 | Eisenhower ExpwyI-290IL-110 | Maintenance - Pavements Storm Sewer (New), Drainage Des Plaines River to Austin Blvd | $100,000,000 | Planned | ||
| — | 1-81305-0000 1813050000 | District 1 | 95th StUS-12US-20 | Preservation - Pavements Smart Overlay, ADA Improvements I-294 (Tri-State Tollway) to Western Ave | $4,200,000 | Planned | ||
| — | 1-81323-0000 1813230000 | District 1 | 17th Ave | Safety Intersection Improvement, ADA Improvements, Lighting At Roosevelt Rd & 14th St | $1,000,000 | Planned | ||
| — | 1-81326-0000 1813260000 | District 1 | US-12US-20US-45 | Rehabilitation - Pavement Designed Overlay, ADA Improvements Lake St to N of I-290 (Eisenhower Expwy) | $3,500,000 | Planned | ||
| — | 1-81333-0000 1813330000 | District 1 | US-30 | Rehabilitation - Bridges Lower Roadway Over ILL 47 | $2,000,000 | Planned | ||
| — | 1-81333-0001 1813330001 | District 1 | US-30 | Reconstruction - Pavement Reconstruction, Drainage Over ILL 47 | $4,000,000 | Planned | ||
| — | 1-81338-0000 1813380000 | District 1 | Cicero AveIL-50 | Miscellaneous Improvement Traf Signal Modernization, Turning Lanes, ADA Improvements At 147th St | $2,500,000 | Planned | ||
| — | 1-81363-0000 1813630000 | District 1 | I-90I-94Kennedy Expwy | Preservation - Bridges Bridge Painting At Various Locations | $13,000,000 | Planned | ||
| — | 1-81364-0000 1813640000 | District 1 | IL-31 | Preservation - Pavements Smart Overlay US 12 (Tryon Grove Rd) to Ringwood Rd | $3,500,000 | Planned | ||
| — | 1-81365-0000 1813650000 | District 1 | Various | Preservation - Bridges Bridge Deck Sealing Various Bridges | $300,000 | Planned | ||
| — | 1-81366-0000 1813660000 | District 1 | I-57Various | Preservation - Bridges Bridge Painting Various Expressway Locations (South Cook) | $4,000,000 | Planned | ||
| — | 1-81366-0010 1813660010 | District 1 | 127th St | Preservation - Bridges Bridge Painting At Metra RR (0.5 M W I-57) | $1,000,000 | Planned | ||
| — | 1-81367-0000 1813670000 | District 1 | I-90I-94Kennedy Expwy | Preservation - Bridges Bridge Deck Sealing Various Bridges | $460,000 | Planned | ||
| — | 1-81368-0000 1813680000 | District 1 | FAU-186FAU-2706Various | Preservation - Bridges Bridge Deck Sealing Various Locations in Lake Co - N of Ill 137 | $550,000 | Planned | ||
| — | 1-81368-1000 1813681000 | District 1 | FAU-1257FAU-2706Various | Preservation - Bridges Bridge Deck Sealing Various Locations in Lake Co - S of Ill 137 | $550,000 | Planned | ||
| — | 1-81369-0000 1813690000 | District 1 | Various | Preservation - Bridges Bridge Deck Sealing Various Bridges in West Cook Co, Kane Co & Kendall Co) | $225,000 | Planned | ||
| — | 1-81370-0000 1813700000 | District 1 | Various | Preservation - Bridges Bridge Painting Various Expwy Overhead Bridges (South Cook Co & Will Co) | $550,000 | Planned | ||
| — | 1-81370-0010 1813700010 | District 1 | Various | Preservation - Bridges Bridge Painting Various Expwy Overhead Bridges (South Cook Co & Will Co) | $41,000 | Planned | ||
| — | 1-81370-0011 1813700011 | District 1 | IL-1Various | Preservation - Bridges Bridge Painting Various Expwy Overhead Bridges (South Cook Co & Will Co) | $252,000 | Planned | ||
| — | 1-81371-0000 1813710000 | District 1 | Various | Preservation - Bridges Bridge Painting Various Locations (South Lake & North Cook) | $825,000 | Planned | ||
| — | 1-81371-0010 1813710010 | District 1 | Edens ExpwyI-94 | Preservation - Bridges Bridge Painting At Tower Rd | $275,000 | Planned | ||
| — | 1-81372-0000 1813720000 | District 1 | I-80 | Maintenance - Pavements Noise Barriers E of Parker Rd | $10,000,000 | Planned | ||
| — | 1-81373-0000 1813730000 | District 1 | I-90I-94Kennedy Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Lake St | $3,250,000 | Planned | ||
| — | 1-81374-0000 1813740000 | District 1 | I-55IL-171 Intchg | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Des Plaines River | $5,500,000 | Planned | ||
| — | 1-81375-0000 1813750000 | District 1 | I-80 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Maple Rd | $1,250,000 | Planned | ||
| — | 1-81376-0000 1813760000 | District 1 | Governors HwyIL-50 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At CN RR (S of Industrial Dr) | $3,400,000 | Planned | ||
| — | 1-81376-0030 1813760030 | District 1 | Cermak Rd | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Des Plaines River | $2,500,000 | Planned | ||
| — | 1-81377-0000 1813770000 | District 1 | Cicero AveIL-50 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Ogden Ave | $1,250,000 | Planned | ||
| — | 1-81378-0000 1813780000 | District 1 | I-90I-94Kennedy Expwy | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Washington Blvd | $3,250,000 | Planned | ||
| — | 1-81379-0000 1813790000 | District 1 | Various | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Various Locations | $3,050,000 | Planned | ||
| — | 1-81379-0030 1813790030 | District 1 | Peterson AveUS-14 | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At North Shore Channel | $1,500,000 | Planned | ||
| — | 1-81380-0000 1813800000 | District 1 | Various | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Various Locations | $11,000,000 | Planned | ||
| — | 1-81381-0000 1813810000 | District 1 | Various | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Various Locations | $14,500,000 | Planned | ||
| — | 1-81382-0000 1813820000 | District 1 | Various | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Various Locations | $2,951,000 | Planned | ||
| — | 1-81383-0000 1813830000 | District 1 | Various | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Various Locations | $8,500,000 | Planned | ||
| — | 1-81384-0000 1813840000 | District 1 | Various | Preservation - Bridges Bridge Joint Replace/Repair, Bridge Deck Overlay At Various Locations | $2,450,000 | Planned | ||
| — | 1-81387-0000 1813870000 | District 1 | Harlem AveIL-43 | Maintenance - Bridges Bridge Repair, Pier Repair At Cal Sag Channel | $15,000,000 | Planned | ||
| — | 1-81387-0010 1813870010 | District 1 | I-290 | Maintenance - Bridges Bridge Repair, Pier Repair At Grand Ave | $15,000,000 | Planned | ||
| — | 1-81394-0000 1813940000 | District 1 | Skokie HwyUS-41 | Miscellaneous Improvement Lighting At Park Ave W & Clavey Rd | $1,900,000 | Planned | ||
| — | 1-81406-0000 1814060000 | District 1 | Montrose Ave | Safety Intersection Improvement, Safety Improvements, ADA Improvements At Forest Preserve Dr | $6,000,000 | Planned | ||
| — | 1-81411-0000 1814110000 | District 1 | Eisenhower ExpwyI-290IL-110 | Maintenance - Pavements Drainage, ADA Improvements 22nd St to Des Plaines River | $12,444,000 | Planned | ||
| — | 1-81416-0000 1814160000 | District 1 | Algonquin RdIL-62 | Preservation - Pavements Smart Overlay Old Plum Grove Rd to Meacham Rd | $2,805,000 | Planned | ||
| — | 1-81418-0000 1814180000 | District 1 | Higgins RdIL-72 | Preservation - Pavements Smart Overlay E of I-90 (Jane Addams Memorial Tollway) to W of Barrington Rd | $1,050,000 | Planned | ||
| — | 1-81419-0000 1814190000 | District 1 | 111th StIL-171IL-83 | Preservation - Pavements Smart Overlay N of Main St to S of Central Ave | $12,785,000 | Planned | ||
| — | 1-81420-0000 1814200000 | District 1 | 127th St | Preservation - Pavements Smart Overlay W of Kostner Ave to W of Western Ave | $6,005,000 | Planned | ||
| — | 1-81422-0000 1814220000 | District 1 | IL-19Irving Park Rd | Rehabilitation - Pavement Designed Overlay W of Oak Ridge Dr | $20,000 | Planned | ||
| — | 1-81425-0000 1814250000 | District 1 | County Line Rd | Rehabilitation - Pavement Designed Overlay Greenbay Rd to Sheridan Rd | $700,000 | Planned | ||
| — | 1-81430-0000 1814300000 | District 1 | Palatine Rd | Rehabilitation - Pavement Designed Overlay E of Roselle Rd to Smith St | $1,700,000 | Planned | ||
| — | 1-81432-0000 1814320000 | District 1 | IL-126Main St | Rehabilitation - Pavement Standard Overlay Essington Rd to Lockport Rd | $4,900,000 | Planned | ||
| — | 1-81433-0000 1814330000 | District 1 | 96th AveUS-45US-52 | Rehabilitation - Pavement Designed Overlay Wilmington-Peotone Rd to County Line Rd | $1,700,000 | Planned | ||
| — | 1-81434-0000 1814340000 | District 1 | York St | Rehabilitation - Pavement Designed Overlay N of Brush Hill Rd to Ill 38 (Roosevelt Rd) | $300,000 | Planned | ||
| — | 1-81435-0000 1814350000 | District 1 | Galena Blvd | Rehabilitation - Pavement Designed Overlay E of Ill 56 to W of Orchard Rd | $4,300,000 | Planned | ||
| — | 1-81437-0000 1814370000 | District 1 | Main St | Rehabilitation - Pavement Designed Overlay Illinois St to W of Ill 83/171 (Archer Ave) | $3,100,000 | Planned | ||
| — | 1-81438-0000 1814380000 | District 1 | E Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Renwick Rd to S of Helen Rd | $400,000 | Planned | ||
| — | 1-81439-0000 1814390000 | District 1 | Doris AveUS-52 | Rehabilitation - Pavement Designed Overlay Ill 53 (Chicago St) to S of Pinewood Ln | $3,100,000 | Planned | ||
| — | 1-81440-0000 1814400000 | District 1 | Mcdonough StUS-52US-6 | Rehabilitation - Pavement Designed Overlay E of US 6 (Railroad St) to US 6/Ill 53 (Chicago St) | $600,000 | Planned | ||
| — | 1-81441-0000 1814410000 | District 1 | Pulaski Rd/crawfor | Rehabilitation - Pavement Designed Overlay Vollmer Rd to S of Thornwood Ave | $510,000 | Planned | ||
| — | 1-81442-0000 1814420000 | District 1 | Touhy Ave | Rehabilitation - Pavement Designed Overlay E of Capital Dr to Kedzie Ave | $870,000 | Planned | ||
| — | 1-81445-0000 1814450000 | District 1 | IL-72South Frontage Rd | Rehabilitation - Pavement Designed Overlay W of Ill 25 (Dundee Ave) | $120,000 | Planned | ||
| — | 1-81446-0000 1814460000 | District 1 | New Willow Rd | Rehabilitation - Pavement Designed Overlay W of Ill 43 (Waukegan Rd) to I-94 (Edens Expwy) | $4,500,000 | Planned | ||
| — | 1-81448-0000 1814480000 | District 1 | South Frontage RdUS-14 | Rehabilitation - Pavement Designed Overlay W of Lake Shore Dr | $300,000 | Planned | ||
| — | 1-81450-0000 1814500000 | District 1 | Troy RdUS-52 | Rehabilitation - Pavement Designed Overlay County Line Rd to Wynstone Dr | $1,100,000 | Planned | ||
| — | 1-81453-0000 1814530000 | District 1 | First AveIL-171 | Rehabilitation - Pavement Designed Overlay 43rd St to S of 44th St | $500,000 | Planned | ||
| — | 1-81456-0000 1814560000 | District 1 | Claire Blvd/rexfor | Rehabilitation - Pavement Designed Overlay Pulaski Rd to I-294 (Tri-State Tollway) | $320,000 | Planned | ||
| — | 1-81457-0000 1814570000 | District 1 | Barrington Rd | Rehabilitation - Pavement Designed Overlay Ill 59 to Ill 68 (Dundee Rd) | $1,500,000 | Planned | ||
| — | 1-81458-0000 1814580000 | District 1 | Chicago Heights-gl | Rehabilitation - Pavement Designed Overlay S of Holbrook Rd to Vollmer Rd | $1,400,000 | Planned | ||
| — | 1-81459-0000 1814590000 | District 1 | Lawrence Ave | Rehabilitation - Pavement Designed Overlay Ill 171 (Cumberland Rd) to Ill 43 (Harlem Ave) | $3,500,000 | Planned | ||
| — | 1-81460-0000 1814600000 | District 1 | 175th St | Rehabilitation - Pavement Designed Overlay W of Western Ave to I-294 (Tri-State Tollway) | $2,400,000 | Planned | ||
| — | 1-81462-0000 1814620000 | District 1 | 47th St | Rehabilitation - Pavement Designed Overlay East Ave to W of Plainfield Rd | $1,500,000 | Planned | ||
| — | 1-81463-0000 1814630000 | District 1 | Burnham Ave | Rehabilitation - Pavement Designed Overlay N of 161st St to 172nd St | $1,700,000 | Planned | ||
| — | 1-81464-0000 1814640000 | District 1 | Burnham Ave | Rehabilitation - Pavement Designed Overlay N of 176th St to S of 197th St | $5,200,000 | Planned | ||
| — | 1-81466-0000 1814660000 | District 1 | IL-64North Ave | Rehabilitation - Pavement Designed Overlay County Line Rd to W of Ill 47 | $5,500,000 | Planned | ||
| — | 1-81468-0000 1814680000 | District 1 | East Frontage RdI-55 | Rehabilitation - Pavement Designed Overlay Bluff Rd to Front St | $600,000 | Planned | ||
| — | 1-81471-0000 1814710000 | District 1 | IL-83Lake St | Rehabilitation - Pavement Designed Overlay S of US 45 to N of Buffalo Grove Rd | $13,000,000 | Planned | ||
| — | 1-81472-0000 1814720000 | District 1 | IL-43Waukegan Rd | Rehabilitation - Pavement Designed Overlay Hampton Blvd to S of Talbot Ave | $1,100,000 | Planned | ||
| — | 1-81473-0000 1814730000 | District 1 | IL-59 | Maintenance - Pavements Patching Artesian Rd to English Row Ave | $5,000,000 | Planned | ||
| — | 1-81475-0000 1814750000 | District 1 | 31st St | Rehabilitation - Pavement Designed Overlay Ill 50 (Cicero Ave) to Kostner Ave | $1,010,000 | Planned | ||
| — | 1-81476-0000 1814760000 | District 1 | Archer AveIL-171 | Rehabilitation - Pavement Standard Overlay Roberts Rd to 79th St | $4,700,000 | Planned | ||
| — | 1-81477-0000 1814770000 | District 1 | 22nd St | Rehabilitation - Pavement Designed Overlay W of Enterprise Dr to I-294 (Tri-State Tollway) | $3,760,000 | Planned | ||
| — | 1-81481-0000 1814810000 | District 1 | Tower Rd | Rehabilitation - Pavement Designed Overlay W of Forestway Dr | $150,000 | Planned | ||
| — | 1-81483-0000 1814830000 | District 1 | New Ave | Rehabilitation - Pavement Designed Overlay W of I-355 to Lockport St | $1,200,000 | Planned | ||
| — | 1-81485-0000 1814850000 | District 1 | Hicks Rd | Rehabilitation - Pavement Designed Overlay US 14 (Northwest Hwy) to Euclid Ave | $2,300,000 | Planned | ||
| — | 1-81486-0000 1814860000 | District 1 | Justamere Rd | Rehabilitation - Pavement Designed Overlay 143rd St to N of Conway Ct | $500,000 | Planned | ||
| — | 1-81487-0000 1814870000 | District 1 | Wolf Rd | Rehabilitation - Pavement Designed Overlay S of Camp McDonald Rd to Euclid Rd | $275,000 | Planned |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.