Filtered by: County: Various Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 12, 2026 | 46678 | VariousDistrict 4 | Installation of pavement marking on various routes in various counties throughout District 4. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $3,083,382 · | ||
| Jun 12, 2026 | 46679 | VariousDistrict 4 | Replaecment of raised reflective pavement markers on various routes in various counties throughout District 4. | — | Executed | Precision Pavement Markings Inc. $1,560,696 · | ||
| Jun 12, 2026 | 62W82 | VariousDistrict 1 | This project proposes converting the entire closed loop system into a centralized traffic management system with remote connection capabilities. This project will install new single mode fiber optic cable, network switches, PTZ cameras and ATC controllers among other equipment to allow for remote access and monitoring capabilities at these locations. There are eighty-two (82) signalized intersections proposed on this project located in Cook and DuPage Counties within the Cities of Rolling Meadow | — | Executed | H & H Electric Co. $6,878,841 · | ||
| Jun 12, 2026 | 64V31 | VariousDistrict 2 | Intersection safety improvements at US 52/IL 64 and IL 78 in Carroll County, US 52 and Freeport Rd. and IL 72 and River Rd. in Ogle County, IL 70 and Meridian Rd. and IL 75 and Meridian Rd. in Winnebago County, and IL 251 and Chicago/Shaw Rd. in Lee County. | — | Executed | ROADSAFE TRAFFIC SYSTEMS, INC. $349,356 · | ||
| Jun 12, 2026 | 66T36 | VariousDistrict 3 | One year contract to repair damaged High Tension Cable Median Barrier, Guardrail, Attenuators, etc., caused by motorists along various routes in District 3. Funded by MCHD funds, Contract Maintenance funds, and Maintenance of HTC Median Barrier funds. | — | Executed | Kujo, Inc. $2,101,221 · | ||
| Jun 12, 2026 | 66T40 | VariousDistrict 3 | The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated within the right-of-way of the Interstate Routes, including, but not limited to, medians; inside and outside areas adjacent to exit and entrance ramps at various interchanges; interchange gore areas between mainline and ramps; and inside and outside of on/off ramps at rest areas within District 3 on interstates I-180, I-39, | — | Executed | The Final Connection, Inc. $153,733 · | ||
| Jun 12, 2026 | 66T60 | VariousDistrict 3 | Removal and proper disposal of medium (6-15 inch diameter) and large (greater than 15 inch diameter) trees, tree trimming, clearing of undesirable bushes, and the maintenance of old growth oak trees along state-maintained routes of Bureau, La Salle, Livingston, and Grundy counties. Work will be limited to occur between October 1, 2026 and March 31st, 2027 due to Threatened and Endangered Species (TandE). | — | Executed | Homer Tree Service, Inc. $769,735 · | ||
| Jun 12, 2026 | 76U96 | VariousDistrict 8 | Highway lighting and traffic signal maintenance at various locations throughout District 8. | — | Executed | Electrico, Inc. $2,003,468 · | ||
| Jun 12, 2026 | 76U97 | VariousDistrict 8 | Guardrail and cable median repairs at various locations in District 8. | — | Executed | Illini Excavation & Reclamation, Inc. $5,201,570 · | ||
| Jun 12, 2026 | 76U98 | VariousDistrict 8 | Maintenance and service of all ITS equipment at various locations throughout District 8. | — | Executed | Electrico, Inc. $573,010 · | ||
| Jun 12, 2026 | 76V08 | VariousDistrict 8 | Various interstate bridge deck patching on a callout basis throughout District 8. | — | Executed | Keeley & Sons, Inc. $2,580,521 · | ||
| Jun 12, 2026 | 76V09 | VariousDistrict 8 | Structural repairs to various bridges at various locations throughout District 8. | — | Executed | Keeley & Sons, Inc. $3,642,071 · | ||
| Jun 12, 2026 | 76V13 | VariousDistrict 8 | Traffic signal modernization at various locations throughout District 8. | — | Executed | Gerstner Electric, Inc. $1,847,416 · | ||
| Jun 12, 2026 | 78C20 | VariousDistrict 9 | Various electrical repairs and/or replacements at various locations throughout District 9. | — | Executed | F. W. Electric, Inc. $318,316 · | ||
| Jun 12, 2026 | 80C96 | VariousDistrict 1 | Forestry, weed control, and landscape work includes pruning, tree removal, and selective clearing of trees, shrubs, and brush, controlling and removing invasive weeds repairing, installing, and establishing new vegetative material including trees, shrubs, and seeding. Located within the right-of-way limits within the municipal limits of Chicago, Lincolnwood, Skokie, Morton Grove, Wilmette, Northfield, Glencoe, and Northbrook. | — | Executed | Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc. $3,638,649 · |
1–15 of 15
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.