Filtered by: County: Macon Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 74596 | MaconDistrict 7 | Complete replacement of bridge decks, abutments, steel girders and approach slabs, using cross-overs, on IL 105 over Lake Decatur. (SN 058-0047 and 058-0048) | — | Executed | ICC Group Inc. $8,549,000 · | ||
| Jan 21, 2022 | 74756 | MaconDistrict 7 | 7.8 miles of standard overlay, resurfacing and ramp repair on I-72 / US 36 from the Sangamon County line to 1.4 miles west of US 51, west of Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $20,829,742 · | ||
| Jan 21, 2022 | 74A39 | MaconDistrict 7 | Cleaning and painting two bridges carrying eastbound and westbound US 36 over US 51 in Harristown. (SN 058-0106 and SN 058-0107) | — | Executed | Civil Coatings and Construction Inc. $996,793 · | ||
| Jan 21, 2022 | 74A77 | MaconDistrict 7 | 2.9 miles of patching on IL 48 from 0.1 miles north of I-72 to Pershing Road in Decatur. | — | Executed | Kinney Contractors, Inc. $478,814 · | ||
| Jan 21, 2022 | 95893 | MaconDistrict 7 | Construction of a grade separation structure to carry Brush College Road over the Norfold Southern Railroad and Fairies Parkway in Decatur. | — | Rejected | William Charles Construction Company, LLC and White Construction, LLC JV $68,927,124 · | ||
| Mar 11, 2022 | 74637 | MaconDistrict 7 | 2.6 miles of resurfacing, median curb repair, ADA upgrades, signal improvements and bridge joint replacement and repairs on Old US 51 Business from IL 121 to I-72. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,810,726 · | ||
| Mar 11, 2022 | 95912 | MaconDistrict 7 | Remove and replace two strucures to carry Reas Bridge Road over Lake Decatur. | — | Rejected | ICC Group Inc. $30,042,000 · | ||
| Apr 29, 2022 | 95915 | MaconDistrict 7 | Sidewalk removal, new PCC sidewalks, pipe culverts, pavement markings at various locations in Warrensburg. | — | Rejected | Kinney Contractors, Inc. $166,604 · | ||
| Jun 17, 2022 | 74780 | MaconDistrict 7 | 6 miles of overlay and bridge joint replacement and repairs with bridge deck overlay on Old US 51 from US 51 to Cleveland Ave in Decatur. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $13,349,233 · | ||
| Jun 17, 2022 | 74902 | MaconDistrict 7 | Traffic signal modernization at the intersection of IL 105 (East William Street) and North Country Club Road in Decatur. | — | Executed | Bodine Electric of Decatur $437,840 · | ||
| Jun 17, 2022 | 74959 | MaconMoultrieDistrict 7 | 8.3 miles of patching, milling, resurfacing, guardrail replacement and culvert replacements on US 36 from 0.4 miles east of Airport Road in Decatur to 0.2 miles west of IL 32. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $6,357,255 · | ||
| Jun 17, 2022 | 95919 | MaconDistrict 7 | Reconstruction of Faries Park Road from 1 mile south of Gun Club Road to .3 mile north of Gun club Road. | — | Executed | Dunn Company $782,944 · | ||
| Jun 17, 2022 | 95920 | MaconDistrict 7 | Replace the bridge carrying Washington Street over Friends Creek, 4.9 miles northeast of Argenta. | — | Executed | County Contractors, Inc. $815,520 · | ||
| Jun 17, 2022 | 95922 | MaconDistrict 7 | Cold-In-Place recycling and HMA resurfacing on CH 21 from Il 121 to Damon Road. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $3,559,453 · |
1–14 of 14
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.