IDOT Jobs

2025 · 8 jobs · — Sign up free
★ My Jobs

Filtered by: County: Lee Clear all

8 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 17, 2025 64M10 LeeDistrict 2 Removal and replacement of an existing box culvert carrying US 30 over a creek located 0.1 mile west of Atkinson Road. — Executed Nov 25 New Martin & Company Excavating $746,263 ·
Mar 7, 2025 64R02 LeeDistrict 2 Reconstruction of sidewalk ramps for those with disabilities at ramps deemed uncompliant, patching, milling, and resurfacing along various state routes in Dixon, Illinois. Gross Length 4,163 ft. — Executed Nov 25 New Martin & Company Excavating $4,036,696 ·
Mar 7, 2025 85775 LeeDistrict 2 Surface Profile Milling, Cold-in-Place Recycling, and HMA Resurfacing on Perry Road from IL 251 to the BNSF Railroad in Steward. — Executed Nov 25 New Martin & Company Excavating $640,103 ·
Apr 25, 2025 64T79 LeeDistrict 2 Pavement patching along IL 38 from Franklin Grove to Ashton (9.22 miles gross length). — Executed Nov 25 New O'Brien Civil Works, Inc. $310,362 ·
Apr 25, 2025 85773 LeeDistrict 2 Replace the bridge carrying Brooklyn Road over Willow Creek, 0.5 mile north of US 30. — Executed Nov 25 New Martin & Company Excavating $950,396 ·
Jun 13, 2025 64M76 LeeDistrict 2 Remove and replace culvert over a drainage way 0.3 mile south of US 30, north of Amboy on US 52. — Executed Nov 25 New Martin & Company Excavating $493,527 ·
Jun 13, 2025 64T31 LeeDistrict 2 Crack joint sealing on US 52 from Water St in Amboy to north of Henkel Rd and on IL 2 from Page Dr in Dixon to US 52/IL 26. 4,227 ft gross length. — Executed Nov 25 New Denler, Inc. $255,552 ·
Jun 13, 2025 64U41 LeeDistrict 2 .3 miles of longitudinal joint repair along IL 38 in Franklin Grove. — Executed Nov 25 New Martin & Company Excavating $58,245 ·
1–8 of 8

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.