IDOT Jobs

All dates · 15 jobs · — Sign up free
★ My Jobs

Filtered by: County: Jasper Clear all

15 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 15, 2018 74853 ClarkCrawfordJasperDistrict 7 Replacing existing non-crashworthy traffic barrier end-sections and steel plate beam guardrail at various locations. — Executed Nov 26 New Midwest Fence Corporation $1,444,046 ·
Jun 14, 2019 74754 JasperDistrict 7 12.2 miles of resurfacing on IL 49 from the Cumberland County line to Main Street in Willow Hill. — Executed Nov 26 New Howell Paving, Inc. $3,872,911 ·
Jan 17, 2020 74407 JasperDistrict 7 6.3 miles of patching, milling, resurfacing, longitudinal joint sealant and shoulder work on IL 33 from IL 130 to IL 49. — Executed Nov 26 New Howell Paving, Inc. $3,438,121 ·
Nov 6, 2020 74993 JasperDistrict 7 Bridge deck repairs and overlay, bridge joint replacement and repairs on SN 040-0017 on IL 33 at the North Fork of the Embarras River, at the Crawford County line. — Executed Nov 26 New Howell Paving, Inc. $976,972 ·
Jan 21, 2022 74A67 JasperDistrict 7 Cleaning and painting SN 040-0017 on IL 33 at the Jasper and Crawford County line. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $149,019 ·
Apr 29, 2022 74A83 CumberlandJasperDistrict 7 20.2 miles of aggregate shoulder placement on IL 130 from the Coles County line to 0.3 miles north of I-70 at Greenup and from the Cumberland County line to 1030N, north of Newton. — Executed Nov 26 New Beniach Construction Co., Inc. $349,437 ·
Jun 17, 2022 95917 JasperDistrict 7 Remove existing guardrail and terminals, install new steel plate beam guardrail and traffic barrier terminals on various routes in Jasper County. — Executed Nov 26 New Lovewell Fencing, Inc. $1,086,076 ·
Jun 17, 2022 95918 JasperDistrict 7 Reconstruct existing roadway with a 10" soil-cement base course from IL 130 to IL 49. — Executed Nov 26 New Mt. Carmel Stabilization Group, Inc. $747,728 ·
Jun 16, 2023 74975 JasperDistrict 7 10.3 miles of patching, milling, resurfacing, HMA shoulders, aggregate wedge shoulders and rumble strips on IL 130 from Edwards Street in Newton to the Richland County line. — Executed Nov 26 New Howell Paving, Inc. $7,289,962 ·
Jun 14, 2024 95962 JasperDistrict 7 Reconstruct CH 10 with soil-cement base course and bituminous cover coat from IL 130 to St. Marie Road. — Executed Nov 26 New Mt. Carmel Stabilization Group, Inc. $667,704 ·
Sep 20, 2024 74C57 JasperDistrict 7 Expansion joint repairs, bridge deck scarification, concrete deck overlay, deck grooving and approach slab patching on SN 040-0019 carrying IL 33 over a stream, 0.1 miles south of IL 33. — Executed Nov 26 New C-Hill Civil Contractors, Inc. $555,555 ·
Sep 20, 2024 74D15 ClarkJasperDistrict 7 Pedestrian signal upgrades at 3 intersections: IL 1 and Archer Avenue in Marshal, IL 33 and Jackson Street in Newton, and IL 33/130 and Van Buren Street in Newton. — Executed Nov 26 New Pals Electric, Inc. $48,713 ·
Apr 25, 2025 74C44 JasperDistrict 7 11.3 miles of resurfacing, shoulder work and patching on IL 33 from the Effingham County line to west of West End Avenue in Newton. — Executed Nov 25 New Howell Paving, Inc. $4,744,251 ·
Apr 25, 2025 74D30 JasperRichlandDistrict 7 Tree removal and trimming on IL 130 from Ste. Marie Spur (600th Avenue) to Cove Lane in Olney. — Executed Nov 25 New Thor General Contracting LLC $290,712 ·
Apr 24, 2026 74E24 JasperDistrict 7 10.6 miles of shoulder reconstruction on IL 33 from IL 130 to the Crawford County line. — Executed Nov 25 New Howell Paving, Inc. $215,113 ·
1–15 of 15

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.