Filtered by: County: Jasper Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jun 15, 2018 | 74853 | ClarkCrawfordJasperDistrict 7 | Replacing existing non-crashworthy traffic barrier end-sections and steel plate beam guardrail at various locations. | — | Executed | Midwest Fence Corporation $1,444,046 · | ||
| Jun 14, 2019 | 74754 | JasperDistrict 7 | 12.2 miles of resurfacing on IL 49 from the Cumberland County line to Main Street in Willow Hill. | — | Executed | Howell Paving, Inc. $3,872,911 · | ||
| Jan 17, 2020 | 74407 | JasperDistrict 7 | 6.3 miles of patching, milling, resurfacing, longitudinal joint sealant and shoulder work on IL 33 from IL 130 to IL 49. | — | Executed | Howell Paving, Inc. $3,438,121 · | ||
| Nov 6, 2020 | 74993 | JasperDistrict 7 | Bridge deck repairs and overlay, bridge joint replacement and repairs on SN 040-0017 on IL 33 at the North Fork of the Embarras River, at the Crawford County line. | — | Executed | Howell Paving, Inc. $976,972 · | ||
| Jan 21, 2022 | 74A67 | JasperDistrict 7 | Cleaning and painting SN 040-0017 on IL 33 at the Jasper and Crawford County line. | — | Executed | ERA-Valdivia Contractors, Inc. $149,019 · | ||
| Apr 29, 2022 | 74A83 | CumberlandJasperDistrict 7 | 20.2 miles of aggregate shoulder placement on IL 130 from the Coles County line to 0.3 miles north of I-70 at Greenup and from the Cumberland County line to 1030N, north of Newton. | — | Executed | Beniach Construction Co., Inc. $349,437 · | ||
| Jun 17, 2022 | 95917 | JasperDistrict 7 | Remove existing guardrail and terminals, install new steel plate beam guardrail and traffic barrier terminals on various routes in Jasper County. | — | Executed | Lovewell Fencing, Inc. $1,086,076 · | ||
| Jun 17, 2022 | 95918 | JasperDistrict 7 | Reconstruct existing roadway with a 10" soil-cement base course from IL 130 to IL 49. | — | Executed | Mt. Carmel Stabilization Group, Inc. $747,728 · | ||
| Jun 16, 2023 | 74975 | JasperDistrict 7 | 10.3 miles of patching, milling, resurfacing, HMA shoulders, aggregate wedge shoulders and rumble strips on IL 130 from Edwards Street in Newton to the Richland County line. | — | Executed | Howell Paving, Inc. $7,289,962 · | ||
| Jun 14, 2024 | 95962 | JasperDistrict 7 | Reconstruct CH 10 with soil-cement base course and bituminous cover coat from IL 130 to St. Marie Road. | — | Executed | Mt. Carmel Stabilization Group, Inc. $667,704 · | ||
| Sep 20, 2024 | 74C57 | JasperDistrict 7 | Expansion joint repairs, bridge deck scarification, concrete deck overlay, deck grooving and approach slab patching on SN 040-0019 carrying IL 33 over a stream, 0.1 miles south of IL 33. | — | Executed | C-Hill Civil Contractors, Inc. $555,555 · | ||
| Sep 20, 2024 | 74D15 | ClarkJasperDistrict 7 | Pedestrian signal upgrades at 3 intersections: IL 1 and Archer Avenue in Marshal, IL 33 and Jackson Street in Newton, and IL 33/130 and Van Buren Street in Newton. | — | Executed | Pals Electric, Inc. $48,713 · | ||
| Apr 25, 2025 | 74C44 | JasperDistrict 7 | 11.3 miles of resurfacing, shoulder work and patching on IL 33 from the Effingham County line to west of West End Avenue in Newton. | — | Executed | Howell Paving, Inc. $4,744,251 · | ||
| Apr 25, 2025 | 74D30 | JasperRichlandDistrict 7 | Tree removal and trimming on IL 130 from Ste. Marie Spur (600th Avenue) to Cove Lane in Olney. | — | Executed | Thor General Contracting LLC $290,712 · | ||
| Apr 24, 2026 | 74E24 | JasperDistrict 7 | 10.6 miles of shoulder reconstruction on IL 33 from IL 130 to the Crawford County line. | — | Executed | Howell Paving, Inc. $215,113 · |
1–15 of 15
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.