Filtered by: County: Henry Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Apr 24, 2026 | 61L48 | McHenryDistrict 1 | Reconstruct and realign Kreutzer Road from east of IL 47 to Haligus Road in Huntley. Includes; pavement removal, earth excavation, HMA pavement, storm sewer, curb and gutter, sidewalks, box culvert, and highway lighting. | — | Executed | William Charles Construction Company, LLC $12,274,333 · | ||
| Apr 24, 2026 | 61L86 | McHenryDistrict 1 | Construct a single-span PPC I-girder bridge with RC concrete deck to carry W. Solon Road over the North Branch Nippersink Creek. Includes; HMA approach, driveways, storm sewer, sheet pile retaining wall, and guardrail. | — | Executed | Dunnet Bay Construction Company $4,604,844 · | ||
| Apr 24, 2026 | 61M35 | McHenryDistrict 1 | Construction of sidewalks along FAU 0006 (Marengo Rd.) and FAU 0005 (Ayer St.) in the City of Harvard. Additional work includes curb and gutter, patching, storm sewer and other required work. | — | Executed | Landmark Contractors, Inc. $333,272 · | ||
| Apr 24, 2026 | 80B10 | McHenryDistrict 1 | Milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt sur (13,136-Ft) Smart Overlay project consists of milling of the existing hot-mix asphalt (HMA) surface, pavement patching, resurfacing with hot-mix asphalt surface course, longitudinal joint sealing, placement of thermoplastic pavement markings. Located on US Route 14 from State Line Road to North of Oak Grove Road in unincorporated McHenry County. | — | Executed | Peter Baker & Son Co. $1,180,922 · | ||
| Apr 24, 2026 | 80B12 | McHenryDistrict 1 | Pavement patching, pavement widening, and curb removal and repair (705.72-Ft) HMA surface removal and overlaying consist of pavement patching, pavement widening, and curb removal and repair. Drainage, grading, and landscaping improvements. Located near the intersection of US 12 and Commercial Street, in the Village of Richmond in McHenry County, Illinois. | — | Executed | Alliance Contractors, Inc. $393,625 · | ||
| Apr 24, 2026 | 80B20 | McHenryDistrict 1 | Class B patches, and joint sealing, curb and gutter removal and replacement, drainage structure adjustments, p (2.42-Mile) PCC pavement patching improvement consists of Class B patches, and joint sealing, curb and gutter removal and replacement, drainage structure adjustments, placement of modified urethane pavement markings and raised reflective pavement markers, ADA improvements, APS installation. Located on IL Route 120 (Elm St.) from West of Martin Rd. to E. Green St. within the City of McHenry in McHenry County. | — | Executed | Triggi Construction, Inc. $1,799,920 · | ||
| Apr 24, 2026 | 80C85 | McHenryDistrict 1 | Pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installa (15,400-Ft) Roadway Reconstruction Project consists of pavement removal, earth excavation and placement of embankment, box culvert installation, storm sewer installation, new PCC pavement with concrete curb and gutter, sidewalk and shared use path construction, traffic signals and interconnection installations water main relocation, pavement marking, landscaping, erosion and sediment control. Location in the City of McHenry, Village of Prairie Grove, and unincorporated Nunda Township within McHe | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $49,786,194 · |
1–7 of 7
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.