| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jul 31, 2026 | 61K85 | CookDistrict 1 | Reconstruction of Weber Dr. from Central Rd. to IL 62 in the city of Rolling Meadows. | — | Executed | Plote Construction, Inc. $2,813,311 · | ||
| Jul 31, 2026 | 61M50 | CookDistrict 1 | Construction of a single-lane roundabout at the intersection of Ravina Ave. and 153rd St. in the village of Orland Park. | — | Active | |||
| Jul 31, 2026 | 62J64 | CookDistrict 1 | Hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement p (3,478-Ft) SMART overlay, Traffic Signal Modernization and ADA improvement project consists of hot-mix asphalt surface removal, placement of hot mix surface course, pedestrian ramp improvements, pavement patching, placement of pavement markings.Located within the Villages of Glencoe and Northbrook in Cook County. | — | Executed | Peter Baker & Son Co. $2,925,476 · | ||
| Jul 31, 2026 | 62T84 | CookDistrict 1 | Sidewalk and ADA improvements (848.83-Ft) The improvement includes replacement of the existing concrete box culvert (SN 016-0926) with a proposed triple cell concrete box culvert (SN 016-8321) consists of sidewalk and ADA improvements. This improvement is located along FAU 2843 (Dixie Highway) over Thron Creek Tributary (0.4 miles North of IL 1) in the City of Chicago Heights, Cook County, IL. | — | Executed | D. Construction, Inc. $1,552,966 · | ||
| Jul 31, 2026 | 62V29 | CookDistrict 1 | Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (3.4-Mile) The improvement consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane pavement marking lines. Location is in villages of Maywood, Forest Park, Melrose Park and River Grove in Cook counties. | — | Executed | Denler, Inc. $334,302 · | ||
| Jul 31, 2026 | 62V45 | CookDistrict 1 | HMA pavement resurfacing with binder and surface courses, class B patching, cleaning and sealing of longitudin (3.3-Mile) Designed Overlay consists of HMA pavement resurfacing with binder and surface courses, class B patching, cleaning and sealing of longitudinal pavement joints between traffic lanes and curb and gutter, placement of thermoplastic and modified urethane pavement markings. This project is located within the City of Alsip and Blue Island in Cook County. | — | Executed | D. Construction, Inc. $1,062,900 · | ||
| Jul 31, 2026 | 62V64 | CookDistrict 1 | Cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement (3,765-Ft) Project consists of cleaning and sealing of longitudinal joints between traffic lanes and curb and gutter on the existing pavement, refreshing existing pavement markings with modified urethane marking lines. Located through the Municipalities of Hanover Park, Bartlett, and Streamwood in Cook County. | — | Executed | Denler, Inc. $85,435 · | ||
| Jul 31, 2026 | 62W20 | CookDistrict 1 | Widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal (1.413-Mile) Bridge Superstructure Replacement (SN 016-0927) consists of widening shoulder widths, replaced approach slabs, continuation of the new shared use pedestrian path, removal and installation of new guardrail, striping ond drainage improvements. The project is in Oak Park Avenue (FAU Route 2774) over I-80 in Tinley Park, IL. | — | Executed | D. Construction, Inc. $7,166,048 · | ||
| Jul 31, 2026 | 62X43 | CookDistrict 1 | Reconstruction of the joints with strip seals, hydro scarification 3/4-), deck repairs, installation of a late (166-Ft) Glenwood Road Bridge (SN 016-0793) over Butterfield Creek project consists of reconstruction of the joints with strip seals, hydro scarification 3/4-), deck repairs, installation of a latex concrete overlay (2¼-) with diamond grinding, application of a protective coat, and substructure concrete repairs, installation of HMA on each side of the bridge. Located within Glenwood Road over Butterfield Creek in the Village of Glenwood in Cook County. | — | Executed | D. Construction, Inc. $290,657 · | ||
| Jul 31, 2026 | 62Y20 | CookDistrict 1 | Deck patching, bridge deck joint replacements, and hydro-scarification and overlay bridge deck overlay (262-Ft) Bridge Deck Overlay and Bridge Joint Replacement will involve bridge repairs. These repairs will generally consist of deck patching, bridge deck joint replacements, and hydro-scarification and overlay bridge deck overlay. This proposed Bridge Repair (SN 016-2705) is located on Ogden Avenue over IL 50 Cicero Avenue, located in Cook County, IL. | — | Executed | Martam Construction Incorporated $1,236,716 · | ||
| Jul 31, 2026 | 80B44 | CookDistrict 1 | Bridge deck scarification and latex concrete overlay, transverse joint repair at the north and south abutments (2,800-Ft) Bridge Overlay includes HMA resurfacing and patching consists of bridge deck scarification and latex concrete overlay, transverse joint repair at the north and south abutments, concrete pier repair, cleaning and adjusting deck drains, road surface removal, HMA overlay and paving, pavement patching, removal and replacement of combination curb and gutter, removal and replacement of guardrail, pavement markings. Located in the Village of Alsip, Cook County. | — | Executed | D. Construction, Inc. $2,052,202 · | ||
| Jul 31, 2026 | 80C87 | CookDistrict 1 | (HMA) overlay on PCC pavement with (HMA) binder and surface course, patching, resurfacing with (HMA) surface c (1,538-Ft) Standard Overlay consists of (HMA) overlay on PCC pavement with (HMA) binder and surface course, patching, resurfacing with (HMA) surface course and (HMA) binder course, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, pavement markings, raised reflective pavement markers. This project is located in the Village of Calumet Park, within Cook County. | — | Executed | Gallagher Asphalt Corporation $288,498 · | ||
| Jul 31, 2026 | 80D50 | CookDistrict 1 | Removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer GRAFFITI REMOVAL shall consist of removing graffiti from the surfaces on State DOT right of way or other locations as directed by the Engineer. Located on the Eisenhower (I-290) from Wells St to Mannheim Rd (US 45) in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $2,425,000 · |
1–13 of 13
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.