IDOT Jobs

Nov 2025 · 13 jobs · — Sign up free
★ My Jobs

Filtered by: County: Cook Clear all

13 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Nov 7, 2025 61J94 CookDistrict 1 Construct a shared-use path adjacent to Meacham Road, from IL 72 to American Lane, and adjacent to Golf Road from Meacham Road to Roosevelt Boulevard in Schaumburg. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $997,000 ·
Nov 7, 2025 61L43 CookDistrict 1 HMA resurfacing on Woodfield Road from Plum Grove Road to Meacham Road in Schaumburg. Includes; HMA full depth patching, curb and gutter, sidewalks, shared use path, traffic signal modifications, and lighting. — Executed Nov 25 New K-Five Construction Corporation $5,837,039 ·
Nov 7, 2025 61L76 CookDistrict 1 Resurfacing and pedestrian safety improvements at the intersection of 9th Ave. at Van Buren Street, and at Quiney Street in Maywood. — Executed Nov 25 New Davis Concrete Construction Co. $298,167 ·
Nov 7, 2025 61L77 CookDistrict 1 Construct PCC Sidewalks along Center Avenue from Maple Avenue to Laurel Avenue. Includes: ADA Ramps, curb and gutter, landscaping, pavement markings and driveways. — Executed Nov 25 New Triggi Construction, Inc. $359,832 ·
Nov 7, 2025 61L82 CookDistrict 1 Construction of a three-span cast-in-place RC slab bridge to carry 21st Street over Addison Creek in Broadview. Includes; full depth HMA pavement, sidewalk, curb and gutter, storm sewer, and lighting. — Executed Nov 25 New Dunnet Bay Construction Company $2,582,436 ·
Nov 7, 2025 61L92 CookDistrict 1 Rehabilitation of Devon Avenue from Lincoln Avenue to McCormick Boulevard in Lincolnwood. Includes; HMA resurfacing, curb and gutter, sidewalks, lighting, parkway ebhancements and water main. — Executed Nov 25 New Capitol Cement Co., Inc. $5,462,909 ·
Nov 7, 2025 61L98 CookDistrict 1 Reconstruction and HMA resurfacing of shoenbeck Road from US 12 to Camp McDonald Road in Mount Prospect. Includes; sidewalks, ADA ramps, pedestrian signals, driveways, storm sewers, and curb and gutter. — Executed Nov 25 New PirTano Construction Co., LLC $1,778,510 ·
Nov 7, 2025 62R63 CookDistrict 1 (2,891-Ft) Bridge Replacement Project. lighting, traffic signals and ADA improvements for structure (SN 016-0834) for I-94 (Edens Expressway) at Devon Avenue (Overhead) in the City of Chicago and the Village of Lincolnwood within Cook County. — Executed Nov 25 New Dunnet Bay Construction Company $15,646,955 ·
Nov 7, 2025 62U41 CookDistrict 1 (481-Ft) Bridge Replacement Project, bridge approach slab replacement for Structure Number (016-2068), lighting, traffic signal modernization, ADA improvement, resurfacing, I-290 at Keeler Avenue. — Executed Nov 25 New Lorig Construction Company $22,596,336 ·
Nov 7, 2025 80B53 CookDistrict 1 A full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenso This improvement consists of a full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenson Expressway) in the City of Chicago and Cook County. — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $1,180,528 ·
Nov 7, 2025 80B69 CookDistrict 1 Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of lim The project consists of Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of limbs, sticks, leaves, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter on various State maintained arterial routes located within the northern half of Cook County. — Executed Nov 25 New Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,622,500 ·
Nov 7, 2025 80B71 CookDistrict 1 Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within southern half of Cook County. — Executed Nov 25 New Central Sweeping of Illinois, LLC $4,010,755 ·
Nov 7, 2025 80B73 CookDistrict 1 GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on The project consists of GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on the inbound and outbound mainlines and ramps of the Kennedy (I-90/94), Dan Ryan (I-90/94), Bishop Ford (I-94), the Stevenson (I-55), and I-57 Expressways in Cook County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $1,110,000 ·
1–13 of 13

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.