| Nov 7, 2025 | 61J94 | CookDistrict 1 | Construct a shared-use path adjacent to Meacham Road, from IL 72 to American Lane, and adjacent to Golf Road from Meacham Road to Roosevelt Boulevard in Schaumburg. | — | Executed | A Lamp Concrete Contractors, Inc. $997,000 · | ||
| Nov 7, 2025 | 61L43 | CookDistrict 1 | HMA resurfacing on Woodfield Road from Plum Grove Road to Meacham Road in Schaumburg. Includes; HMA full depth patching, curb and gutter, sidewalks, shared use path, traffic signal modifications, and lighting. | — | Executed | K-Five Construction Corporation $5,837,039 · | ||
| Nov 7, 2025 | 61L76 | CookDistrict 1 | Resurfacing and pedestrian safety improvements at the intersection of 9th Ave. at Van Buren Street, and at Quiney Street in Maywood. | — | Executed | Davis Concrete Construction Co. $298,167 · | ||
| Nov 7, 2025 | 61L77 | CookDistrict 1 | Construct PCC Sidewalks along Center Avenue from Maple Avenue to Laurel Avenue. Includes: ADA Ramps, curb and gutter, landscaping, pavement markings and driveways. | — | Executed | Triggi Construction, Inc. $359,832 · | ||
| Nov 7, 2025 | 61L82 | CookDistrict 1 | Construction of a three-span cast-in-place RC slab bridge to carry 21st Street over Addison Creek in Broadview. Includes; full depth HMA pavement, sidewalk, curb and gutter, storm sewer, and lighting. | — | Executed | Dunnet Bay Construction Company $2,582,436 · | ||
| Nov 7, 2025 | 61L92 | CookDistrict 1 | Rehabilitation of Devon Avenue from Lincoln Avenue to McCormick Boulevard in Lincolnwood. Includes; HMA resurfacing, curb and gutter, sidewalks, lighting, parkway ebhancements and water main. | — | Executed | Capitol Cement Co., Inc. $5,462,909 · | ||
| Nov 7, 2025 | 61L98 | CookDistrict 1 | Reconstruction and HMA resurfacing of shoenbeck Road from US 12 to Camp McDonald Road in Mount Prospect. Includes; sidewalks, ADA ramps, pedestrian signals, driveways, storm sewers, and curb and gutter. | — | Executed | PirTano Construction Co., LLC $1,778,510 · | ||
| Nov 7, 2025 | 62R63 | CookDistrict 1 | (2,891-Ft) Bridge Replacement Project. lighting, traffic signals and ADA improvements for structure (SN 016-0834) for I-94 (Edens Expressway) at Devon Avenue (Overhead) in the City of Chicago and the Village of Lincolnwood within Cook County. | — | Executed | Dunnet Bay Construction Company $15,646,955 · | ||
| Nov 7, 2025 | 62U41 | CookDistrict 1 | (481-Ft) Bridge Replacement Project, bridge approach slab replacement for Structure Number (016-2068), lighting, traffic signal modernization, ADA improvement, resurfacing, I-290 at Keeler Avenue. | — | Executed | Lorig Construction Company $22,596,336 · | ||
| Nov 7, 2025 | 80B53 | CookDistrict 1 | A full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenso This improvement consists of a full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenson Expressway) in the City of Chicago and Cook County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,180,528 · | ||
| Nov 7, 2025 | 80B69 | CookDistrict 1 | Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of lim The project consists of Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of limbs, sticks, leaves, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter on various State maintained arterial routes located within the northern half of Cook County. | — | Executed | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,622,500 · | ||
| Nov 7, 2025 | 80B71 | CookDistrict 1 | Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within southern half of Cook County. | — | Executed | Central Sweeping of Illinois, LLC $4,010,755 · | ||
| Nov 7, 2025 | 80B73 | CookDistrict 1 | GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on The project consists of GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on the inbound and outbound mainlines and ramps of the Kennedy (I-90/94), Dan Ryan (I-90/94), Bishop Ford (I-94), the Stevenson (I-55), and I-57 Expressways in Cook County. | — | Executed | ERA-Valdivia Contractors, Inc. $1,110,000 · |
1–13 of 13
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.