IDOT Jobs

All dates · 8 jobs · — Sign up free
★ My Jobs

Filtered by: County: Cook, Kane Clear all

8 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 15, 2018 62G12 CookKaneDistrict 1 Trombone mast arm replacement at various locations. — Executed Nov 26 New H & H Electric Co. $2,323,187 ·
Jun 14, 2019 62J11 CookKaneMcHenryDistrict 1 Intermittent resurfacing on various routes in McHenry, Kane and Cook counties. — Executed Nov 26 New J. A. Johnson Paving Company $1,797,700 ·
Apr 24, 2020 62J96 CookKaneDistrict 1 Centerline joint repair and patching project on US 20 that starts at Plank Rd and extends E for 7.4 miles to a point approximately 80 ft W of the centerline of Shales Pkwy. — Executed Nov 26 New Geneva Construction Company $1,396,008 ·
Nov 5, 2021 62N52 CookKaneDistrict 1 (2.63-Mile) Standard overlay and ADA improvement project on IL 19 (Irving Park Road) from IL 25 to IL 59 in Cook and Kane Counties. — Executed Nov 26 New Arrow Road Construction Co. $2,384,740 ·
Aug 4, 2023 62U47 CookKaneDistrict 1 Trombone Mast Arm replacement in various locations in District 1. — Executed Nov 26 New Home Towne Electric, Inc. $1,389,836 ·
Jun 14, 2024 62U83 CookKaneDistrict 1 6,108 feet (1.16 mi) project which includes pavement reconstruction and widening, pavement rehabilitation, drainage, lighting, signing, noise barriers, safety improvements, superstructure replacement and widening of US 20 over St Charles St (SN 045-0006), and superstructure replacement of US 20 over Liberty St (045-0007) and US 20 over Poplar Creek (SN 016-0217) from E of Grace St to W of Shales Pkwy in the City of Elgin within Kane and Cook Counties. — Executed Nov 26 New Dunnet Bay Construction Company $27,446,572 ·
Jun 13, 2025 62Y02 CookKaneDistrict 1 Cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work (0.01-Mile) This is a bridge painting project consists of cleaning and painting steel surfaces as designated on the plans and any incidental and collateral work. This project has two locations: (SN 045-0037 and SN 047-0029) 1) Galena Blvd over IL-56 in the Village of Sugar Grove. 2) US 30 over Blackberry Creek in the Village of Montgomery. — Executed Nov 25 New Capital Industrial Services, LLC $499,333 ·
Aug 1, 2025 62X45 CookKaneKendallDistrict 1 Bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the This improvement consists of bridge deck concrete sealer entire top surface of bridge deck, sidewalks, top of inside vertical faces of the parapets, face of curbs, and inside and outside of dividing walls along walkways of the structure placement of modified urethane pavement markings. Located throughout Cook, Kane and Kendall Counties. — Executed Nov 25 New Mosley Construction 1, LLC $1,455,444 ·
1–8 of 8

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.