IDOT Jobs

2019 · 11 jobs · — Sign up free
★ My Jobs

Filtered by: County: Clinton Clear all

11 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 18, 2019 76M03 ClintonDistrict 8 Bridge and jooint repair on SN 014-0031 on Old US 50 approximately 1.2 miles east of Aviston. — Executed Nov 26 New Keller Construction, Inc. $305,388 ·
Mar 8, 2019 76H15 ClintonDistrict 8 5 miles of resurfacing on IL 160 from IL 161 in New Baden to 4th Street in Trenton. — Executed Nov 26 New The Kilian Corporation $2,828,290 ·
Mar 8, 2019 76L08 ClintonDistrict 8 4.4 miles of resurfacing and HMA soulders/ rumble strips on IL 160/ IL 177 from 0.1 mile west of Sand Hill Road to the Washington County line/ Kaskaskia River Bridge. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $2,189,288 ·
Mar 8, 2019 76M07 ClintonDistrict 8 7.5 miles of patching and underdrains on I-64 from the St. Clair County line to the Washington County line in Clinton County. — Executed Nov 26 New Keeley & Sons, Inc. $823,830 ·
Apr 26, 2019 76H14 ClintonDistrict 8 3.8 miles of resurfacing on IL 160 from IL 161 to IL 177. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,595,478 ·
Apr 26, 2019 76M15 ClintonDistrict 8 Slab on slab repair and culvert maintenance at SN 014-2005 carrying IL 127 over Mid Trib Flat Branch, 1.2 miles south of the Bond County line. — Executed Nov 26 New Stutz Excavating, Inc. $137,628 ·
Jun 14, 2019 46916 ClintonDistrict 8 RESURFACING OF PARK ROADS AND PARKING LOT. ADA SIDEWALK AND RAMP UPGRADES AND REPLACEMENT OF CULVERTS AT ELDON HAZLET STATE PARK. — Executed Nov 26 New Howell Paving, Inc. $1,323,717 ·
Jun 14, 2019 97705 ClintonDistrict 8 Resurfacing and guardrail replacement on CH 3 from US 50 to Gambill Road. — Executed Nov 26 New Howell Paving, Inc. $1,166,409 ·
Jul 12, 2019 76M64 ClintonDistrict 8 2.5 miles of resurfacing on IL 160 from the Madison County line to 0.3 miles north of US 50. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $657,842 ·
Jul 12, 2019 76M76 ClintonDistrict 8 3.2 miles of resurfacing on US 50 from 0.2 miles west of IL 160 to the Sugar Creek Overflow. — Executed Nov 26 New Christ Bros. Asphalt, Inc. $1,049,313 ·
Nov 8, 2019 76M28 ClintonDistrict 8 Tree removal along Old US 50 from Koch Lane to Hilmes Road. — Executed Nov 26 New Nettle Creek Nursery, Inc. $64,600 ·
1–11 of 11

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.