18,642Let jobs
$76,971,155,782Total low bids
$79,237,330,402Total estimates
-2.9%Low bids vs estimates
All dates results
Bid tabs (Excel) ExcelCSV| Let date | CCSJ | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| Aug 12, 2026 | 6487-40-001RMC - A00216593 | Williamson Austin |
FY 26 Crack Seal GTAOFM1460 · Routine Maintenance Project - Sealed | $248,885 | $292,322 | FYL ENTERPRISES, LLC | +17.5% | 3 |
| Aug 12, 2026 | 6505-53-001RMC - A00223094 | Brazos Bryan |
FY26 - Bryan AO MBGF -08SH0006 · Routine Maintenance Project - Sealed | $350,900 | $264,125 | RHINO EQUITY, LLC | -24.7% | 2 |
| Aug 12, 2026 | 6500-43-001RMC - A00220783 | Navarro Dallas |
Crack Seal 01 0826SH0031 · Routine Maintenance Project - Sealed | $279,635 | $258,716 | SCOUT 5 CONSTRUCTION LLC | -7.5% | 5 |
| Aug 12, 2026 | 6487-42-001RMC - A00216595 | Burnet Austin |
FY 26 Crack Seal BTAOUS0281 · Routine Maintenance Project - Sealed | $301,553 | $246,706 | FYL ENTERPRISES, LLC | -18.2% | 3 |
| Aug 12, 2026 | 6501-41-001RMC - A00221455 | Ellis Dallas |
CRACK SEAL 09 081226IH0035E · Routine Maintenance Project | $259,470 | $230,014 | SCOUT 5 CONSTRUCTION LLC | -11.4% | 6 |
| Aug 12, 2026 | 6487-44-001RMC - A00216597 | Travis Austin |
FY 26 Crack Seal SAAORM2244 · Routine Maintenance Project - Sealed | $203,173 | $210,976 | FYL ENTERPRISES, LLC | +3.8% | 3 |
| Aug 12, 2026 | 6503-54-001RMC - A00222416 | Polk Lufkin |
2026-08 Polk Tree and Brush RemovalUS0059 · Routine Maintenance Project - Sealed | $279,065 | $205,805 | K & R CONTRACTORS | -26.3% | 6 |
| Aug 12, 2026 | 6499-99-001RMC - A00220574 | Kaufman Dallas |
Crack Seal Kaufman FY'26US0080 · Routine Maintenance Project - Sealed | $237,980 | $203,416 | SCOUT 5 CONSTRUCTION LLC | -14.5% | 5 |
| Aug 12, 2026 | 6497-54-001BPM - A00219680 | Denton Dallas |
BPM Misc Concrete RepairIH0035W · Bridge Preventative Maintenance - Sealed | $214,236 | $168,250 | ROAD DOCTORS LLC | -21.5% | 8 |
| Aug 12, 2026 | 6501-42-001MMC - A00221467 | Collin Dallas |
Emulsion - In House SealFM0982 · Material Maintenance Project | $143,982 | $148,529 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | +3.2% | 2 |
| Aug 12, 2026 | 6487-41-001RMC - A00216594 | Bastrop Austin |
FY 26 Crack Seal BAAOSH0071 · Routine Maintenance Project - Sealed | $120,391 | $133,050 | FYL ENTERPRISES, LLC | +10.5% | 3 |
| Aug 12, 2026 | 6503-42-001RMC - A00222372 | Shelby Lufkin |
2026-08 Shelby Tree And Brush RemovalUS0059 · Routine Maintenance Project - Sealed | $163,825 | $124,256 | ACE CONTRACTORS, INC. | -24.2% | 4 |
| Aug 12, 2026 | 6501-43-001MMC - A00221468 | Collin Dallas |
ROAD SALT FY 27SH0005 · Material Maintenance Project | $93,909 | $101,367 | NSG LOGISTICS, LLC | +7.9% | 2 |
| Aug 12, 2026 | 6487-43-001RMC - A00216596 | Travis Austin |
FY 26 Crack Seal NAAOFM0969 · Routine Maintenance Project - Sealed | $91,316 | $100,511 | FYL ENTERPRISES, LLC | +10.1% | 3 |
| Aug 12, 2026 | 6500-42-001MMC - A00220779 | Denton Dallas |
Aggregate 04 0826US0380 · Material Maintenance Project | $66,000 | $82,200 | ARCOSA LWS, LLC | +24.5% | 1 |
| Aug 12, 2026 | 6501-46-001MMC - A00221479 | Collin Dallas |
CUTBACK FY27SH0005 · Material Maintenance Project | $55,800 | $46,680 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -16.3% | 2 |
| Aug 12, 2026 | 6501-48-001MMC - A00221482 | Collin Dallas |
FLEXIBLE BASE COLLIN FY27SH0005 · Material Maintenance Project | $46,000 | $42,400 | RK HALL, LLC | -7.8% | 4 |
| Aug 12, 2026 | 6502-55-001RMC - A00221865 | Denton Dallas |
Crack Seal Denton 04 0826FM0455 · Routine Maintenance Project - Sealed | $49,945 | $38,286 | Alpha Pavement Markings LLC | -23.3% | 6 |
| Aug 12, 2026 | 6501-40-001RMC - A00221446 | Collin Dallas |
RPM (Long Line 3364) 8.2026FM3364 · Routine Maintenance Project - Sealed | $28,844 | $33,307 | STRIPE-A-ZONE, LLC | +15.5% | 2 |
| Aug 12, 2026 | 6498-30-001RMC - A00219979 | Collin Dallas |
Crack Seal 07 08.26SH0005 · Routine Maintenance Project - Sealed | $39,339 | $31,659 | Alpha Pavement Markings LLC | -19.5% | 6 |
| Aug 12, 2026 | 6500-48-001MMC - A00220793 | Kaufman Dallas |
Lime (Material Only) 06 0826FM2728 · Material Maintenance Project | $11,625 | $14,500 | TEXAS LIME COMPANY | +24.7% | 2 |
| Aug 12, 2026 | 6508-17-001SUP - A00223733 | Randall Amarillo |
Janitorial Amarillo Dist. Office FY 27IH0027 · State Use Project | $98,404 | — | 0 | ||
| Aug 12, 2026 | 6508-19-001SUP - A00223743 | Moore Amarillo |
Janitorial Dumas AE & Maint FY 27FM2203 · State Use Project | $17,267 | — | 0 | ||
| Aug 11, 2026 | 6502-72-001RMC - A00221935 | Midland Odessa |
6502-72-001 Miscellaneous ConcreteIH0020 · Routine Maintenance Project - Sealed | $714,000 | $1,037,872 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | +45.4% | 2 |
| Aug 11, 2026 | 6495-42-001RMC - A00218786 | Harris Houston |
6495-42-001STRIPING/GRAPHICS S. HARRISSL0008 · Routine Maintenance Project - Sealed | $752,114 | $637,744 | TRP INFRASTRUCTURE SERVICES, LLC | -15.2% | 2 |
| Aug 11, 2026 | 6505-00-001MMC - A00222989 | Walker Bryan |
FY26 Walker HMA - 08IH0045 · Material Maintenance Project | $656,000 | $636,380 | BIG CREEK CONSTRUCTION, LTD. | -3.0% | 3 |
| Aug 11, 2026 | 6505-35-001MMC - A00223049 | Pecos Odessa |
6505-35-001 Salt & ChlorideBI0010G · Material Maintenance Project | $504,375 | $593,707 | NSG LOGISTICS, LLC | +17.7% | 1 |
| Aug 11, 2026 | 6502-69-001RMC - A00221918 | Smith Tyler |
FY 27 CRACKSEAL - HOT POUR - SOUTHUS0069 · Routine Maintenance Project | $632,576 | $592,020 | D & M CONTRACTORS, LLC | -6.4% | 6 |
| Aug 11, 2026 | 6494-85-001RMC - A00218658 | Eastland Brownwood |
CLEANING AND SEALING CRACKS 2026IH0020 · Routine Maintenance Project | $706,238 | $555,420 | SCOUT 5 CONSTRUCTION LLC | -21.4% | 4 |
| Aug 11, 2026 | 6504-95-001RMC - A00222960 | Ector Odessa |
6504-95-001 Crack SealIH0020 · Routine Maintenance Project - Sealed | $508,120 | $484,960 | GREENPAK SOLUTIONS, LIMITED LIABILITY COMPANY | -4.6% | 5 |
| Aug 11, 2026 | 6501-51-001RMC - A00221492 | Childress Childress |
FY27 Districtwide Tree RemovalUS0287 · Routine Maintenance Project - Sealed | $509,190 | $453,016 | BLACK CROWN CONSTRUCTION LLC | -11.0% | 7 |
| Aug 11, 2026 | 6505-09-001RMC - A00223001 | Midland Odessa |
6505-09-001 Cleaning & Sealing CracksIH0020 · Routine Maintenance Project | $496,710 | $452,636 | SCOUT 5 CONSTRUCTION LLC | -8.9% | 5 |
| Aug 11, 2026 | 6500-14-001RMC - A00220662 | Waller Houston |
RMC 6500-14-001US0290 · Routine Maintenance Project - Sealed | $434,160 | $398,235 | TRP INFRASTRUCTURE SERVICES, LLC | -8.3% | 2 |
| Aug 11, 2026 | 6505-36-001MMC - A00223050 | Midland Odessa |
6505-36-001 Salt & ChlorideIH0020 · Material Maintenance Project | $338,000 | $366,378 | NSG LOGISTICS, LLC | +8.4% | 1 |
| Aug 11, 2026 | 6505-37-001MMC - A00223051 | Ector Odessa |
6505-37-001 Salt & ChlorideSL0338 · Material Maintenance Project | $320,625 | $349,356 | NSG LOGISTICS, LLC | +9.0% | 1 |
| Aug 11, 2026 | 6505-44-001MMC - A00223079 | Stephens Brownwood |
LRA (MATERIALS ONLY) STEPHENS COUS0180 · Material Maintenance Project | $302,000 | $341,675 | VULCAN CONSTRUCTION MATERIALS, LLC | +13.1% | 2 |
| Aug 11, 2026 | 6505-49-001RMC - A00223084 | Midland Odessa |
6505-49-001 Pump Station MaintenanceBI0020E · Routine Maintenance Project | $366,368 | $314,644 | E.V.G. ENTERPRISE | -14.1% | 2 |
| Aug 11, 2026 | 6502-66-001RMC - A00221894 | Wood Tyler |
FY 27 CRACKSEAL - HOT POUR - NORTHUS0080 · Routine Maintenance Project | $376,908 | $309,487 | SCOUT 5 CONSTRUCTION LLC | -17.9% | 6 |
| Aug 11, 2026 | 6505-18-001RMC - A00223019 | Washington Bryan |
FY26 - Brenham AO MBGF -08SH0036 · Routine Maintenance Project - Sealed | $350,900 | $268,455 | T&L CLEANING SERVICES LLC | -23.5% | 2 |
| Aug 11, 2026 | 6504-13-001RMC - A00222594 | San Jacinto Lufkin |
2027-01 San Jacinto MBGFUS0059 · Routine Maintenance Project - Sealed | $201,750 | $244,385 | RHINO EQUITY, LLC | +21.1% | 1 |
| Aug 11, 2026 | 6498-38-001RMC - A00220004 | Anderson Tyler |
FY 26 Anderson Co. Tree TrimmingUS0287 · Routine Maintenance Project | $288,080 | $223,693 | CROSS PLUS CONSTRUCTION, LLC | -22.4% | 5 |
| Aug 11, 2026 | 6496-38-001RMC - A00219294 | Waller Houston |
RMC 6496-38-001US 290 · Routine Maintenance Project - Sealed | $212,400 | $193,948 | TEXAS DRAINAGE INC. | -8.7% | 3 |
| Aug 11, 2026 | 6501-71-001BPM - A00221534 | Smith Tyler |
FY27 Cleaning and Sealing Bridge JointsUS0069 · Bridge Preventative Maintenance - Sealed | $204,170 | $167,226 | INFRATEX CONSTRUCTION LLC | -18.1% | 11 |
| Aug 11, 2026 | 6501-02-001BPM - A00221216 | Freestone Bryan |
FY27 - Freestone BPM - 09FM1365 · Bridge Preventative Maintenance | $154,058 | $144,678 | GARRET SHIELDS INFRASTRUCTURE | -6.1% | 3 |
| Aug 11, 2026 | 6501-29-001BPM - A00221404 | Gregg Tyler |
FY27 BPM JOINTS IH-20IH0020 · Bridge Preventative Maintenance - Sealed | $257,618 | $133,105 | 12TWELVE ROAD AND BRIDGE LLC | -48.3% | 13 |
| Aug 11, 2026 | 6496-40-001RMC - A00219341 | Shelby Lufkin |
2026-08 Shelby MBGFUS0096 · Routine Maintenance Project - Sealed | $186,000 | $126,342 | AUSTIN BARRICADE COMPANY, L.L.C. | -32.1% | 3 |
| Aug 11, 2026 | 6506-41-001MMC - A00223314 | Pecos Odessa |
6506-41-001 ASPPMBI0010G · Material Maintenance Project | $107,500 | $103,000 | TOUCHSTONE RESOURCES, LLC | -4.2% | 3 |
| Aug 11, 2026 | 6505-33-001MMC - A00223047 | Midland Odessa |
6505-33-001 EmulsionIH0020 · Material Maintenance Project | $82,500 | $78,720 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -4.6% | 2 |
| Aug 11, 2026 | 6505-34-001MMC - A00223048 | Ector Odessa |
6505-34-001 EmulsionIH0020 · Material Maintenance Project | $66,000 | $60,720 | WRIGHT ASPHALT PRODUCTS COMPANY LLC | -8.0% | 2 |
| Aug 11, 2026 | 6498-41-001RMC - A00220007 | Gregg Tyler |
FY 26 Tree Trimming Gregg CoFM1252 · Routine Maintenance Project | $59,360 | $49,461 | CROSS PLUS CONSTRUCTION, LLC | -16.7% | 6 |
| Aug 11, 2026 | 6499-63-001SUP - A00220420 | Hidalgo Pharr |
Debris Removal State Use FY 2027IH0069C · State Use Project | $697,288 | — | 0 | ||
| Aug 11, 2026 | 6507-54-001EMC - A00223601 | Kerr San Antonio |
EMERGENCY BEAM REPAIR JULY 2026 FLOODSH0016 · Emergency Maintenance Project - Sealed | $654,524 | — | 0 | ||
| Aug 11, 2026 | 6507-82-001EMC - A00223658 | Kinney Laredo |
Bridge Repair - Kinney CountyUS0090 · Emergency Maintenance Project - Sealed | $624,908 | — | 0 | ||
| Aug 11, 2026 | 6508-54-001SUP - A00223841 | Hardin Beaumont |
KOUNTZE LITTER MAINT.US0069 · State Use Project | $108,887 | — | 0 | ||
| Aug 11, 2026 | 6508-55-001SUP - A00223842 | Jefferson Beaumont |
PORT ARTHUR GROUNDS MAINTENANCE FY27SH0347 · State Use Project | $32,265 | — | 0 | ||
| Aug 10, 2026 | 6494-59-001SUP - A00218623 | Fort Bend Houston |
SUP 6494-59-001 Litter RemovalUS0059 · State Use Project | $481,707 | — | 0 | ||
| Aug 10, 2026 | 6488-75-001SUP - A00217189 | Blanco Austin |
Johnson City Maintenance Litter FY27US0281 · State Use Project | $188,864 | — | 0 | ||
| Aug 10, 2026 | 6497-05-001SUP - A00219527 | Hidalgo Pharr |
6497-05-001 Drain Inlet CleaningIH0002 · State Use Project | $811,615 | — | 0 | ||
| Aug 10, 2026 | 6499-62-001SUP - A00220417 | Starr Pharr |
MBGFR FY27 (Roma)US0083 · State Use Project - Sealed | $951,208 | — | 0 | ||
| Aug 10, 2026 | 6504-97-001SUP - A00222966 | Brazoria Houston |
SUP 6504-97-001 Litter RemovalSH0288 · State Use Project | $394,089 | — | 0 | ||
| Aug 10, 2026 | 6507-71-001SUP - A00223641 | Dallas Dallas |
East Dallas County Janitorial & GroundsIH0045 · State Use Project | $30,760 | — | 0 | ||
| Aug 10, 2026 | 6508-69-001SUP - A00223868 | Refugio Corpus Christi |
6508-69-001 Refugio JanitorialUS0077 · State Use Project | $23,576 | — | 0 | ||
| Aug 10, 2026 | 6508-70-001SUP - A00223872 | San Patricio Corpus Christi |
6508-70-001 San Patricio PicnicIH0037 · State Use Project | $86,766 | — | 0 | ||
| Aug 10, 2026 | 6508-76-001SUP - A00223885 | Karnes Corpus Christi |
6508-76-001 Karnes JanitorialUS0181 · State Use Project | $30,098 | — | 0 | ||
| Aug 7, 2026 | 6508-27-001SUP - A00223763 | Live Oak Corpus Christi |
6508-27-001 Live Oak JanitorialUS0059 · State Use Project | $33,408 | — | 0 | ||
| Aug 7, 2026 | 6508-36-001SUP - A00223810 | Kleberg Corpus Christi |
6508-36-001 Kleberg JanitorialBU0077V · State Use Project | $30,678 | — | 0 | ||
| Aug 6, 2026 | 0018-05-089F 2026(017) | Webb Laredo |
Interchange@Uniroyal Dr&SH 84IH 35 · Interchange (New or Reconstructed) | $226,858,176 | $205,813,981 | PULICE CONSTRUCTION, INC. | -9.3% | 4 |
| Aug 6, 2026 | 3510-04-069STP 2026(997)MM | Fort Bend Houston |
SH 99 NB FR, Fry to Westheimer PkwySH 99 · New Location Non-Freeway | $42,352,206 | $32,673,736 | JAMES CONSTRUCTION GROUP, LLC | -22.9% | 9 |
| Aug 6, 2026 | 0041-07-121F 2026(989) | Potter Amarillo |
US 87 HIR AMA CRK TO SL 335US 87 · Restoration | $31,174,130 | $30,085,056 | J. LEE MILLIGAN, INC. | -3.5% | 3 |
| Aug 6, 2026 | 0842-03-037F 2026(994) | Victoria Yoakum |
FM 236 WIDEN ROAD - ADD LANES 2024FM 236 · Widen Non-Freeway | $33,725,491 | $24,999,762 | CK NEWBERRY, LLC | -25.9% | 3 |
| Aug 6, 2026 | 1012-03-027F 2026(992) | Collin Dallas |
FM 981 from SH 78 to FM 1562FM 981 · Rehabilitation of Existing Road | $18,327,262 | $18,829,388 | D. L. LENNON INCORPORATED - CONTRACTOR | +2.7% | 7 |
| Aug 6, 2026 | 2158-01-020F 2026(848) | Gregg Tyler |
FM2275,FM1845-SH300,WDNFM 2275 · Widen Non-Freeway | $19,466,265 | $17,959,231 | LONGVIEW BRIDGE AND ROAD, LTD. | -7.7% | 5 |
| Aug 6, 2026 | 0314-07-070STP 2026(892)MM | Parker Fort Worth |
IH 20; FM 1884 TO SH 171aIH 20 · Rehabilitation of Existing Road | $18,156,437 | $15,697,165 | INDUS ROAD & BRIDGE, INC. | -13.5% | 7 |
| Aug 6, 2026 | 0140-13-023F 2026(932) | Crockett San Angelo |
0140-13-023 IH 10 Truck ParkingIH 10 · Safety Rest Area | $19,998,295 | $13,741,321 | RAGLE CONSTRUCTION, INC. | -31.3% | 6 |
| Aug 6, 2026 | 0283-02-040F 2026(265) | Archer Wichita Falls |
SH 79, FM 2224 to 1.7 miles southSH 79 · Super-2 Highway | $13,619,478 | $13,042,633 | A. L. HELMCAMP, INC. | -4.2% | 5 |
| Aug 6, 2026 | 0610-05-060F 2026(876) | Bowie Atlanta |
IH 30 Truck ParkingIH 30 · Safety Rest Area | $12,397,796 | $10,625,436 | EAST TEXAS BRIDGE, INC. | -14.3% | 4 |
| Aug 6, 2026 | 0168-03-038F 2026(975) | Parmer Lubbock |
US 60- In Friona 5th St. to WalnutUS 60 · Rehabilitation of Existing Road | $10,053,819 | $9,764,859 | A. L. HELMCAMP, INC. | -2.9% | 5 |
| Aug 6, 2026 | 0254-01-149F 2B26(021) | Live Oak Corpus Christi |
FY 2029 US 281 Live Oak Co.US 281 · Rehabilitation of Existing Road | $10,519,558 | $9,709,793 | STX CIVIL | -7.7% | 8 |
| Aug 6, 2026 | 0541-02-033C 541-2-33 | Hall Childress |
SH 256 FM 2361, E to US 287SH 256 · Rehabilitation of Existing Road | $8,833,130 | $9,477,781 | J. LEE MILLIGAN, INC. | +7.3% | 3 |
| Aug 6, 2026 | 0276-01-044F 2026(846) | Maverick Laredo |
US57 Rehabilitation of Existing RoadwayUS 57 · Rehabilitation of Existing Road | $11,559,333 | $8,822,697 | ANDERSON COLUMBIA CO., INC. | -23.7% | 3 |
| Aug 6, 2026 | 2528-01-006C 2528-1-6 | Reeves Odessa |
FM_2448_WIDEN_AND_OVERLAY_REEVES_COUNTYFM 2448 · Rehabilitation of Existing Road | $8,844,235 | $8,604,312 | DAN WILLIAMS COMPANY | -2.7% | 5 |
| Aug 6, 2026 | 0025-02-234F 2026(916) | Bexar San Antonio |
IH 10: 0025-02-234; ITSIH 10 · Corridor Traffic Management | $10,408,179 | $7,903,389 | SICE, INC. | -24.1% | 7 |
| Aug 6, 2026 | 2552-04-055STP 2026(324)HES | El Paso El Paso |
ELP_SL0375_1-SYS (2022)SL 375 · Safety Improvement Projects | $6,949,288 | $6,996,636 | ALBATROSS CONSTRUCTION LLC | +0.7% | 4 |
| Aug 6, 2026 | 0535-02-050F 2B26(041) | Guadalupe San Antonio |
IH 10: 0535-02-050; BRIH 10 · Bridge Replacement | $5,699,899 | $5,753,739 | HUNTER INDUSTRIES, LTD. | +0.9% | 8 |
| Aug 6, 2026 | 0420-01-051STP 2026(952)HES | Jackson Yoakum |
SH 172 CONSTRUCT ROUNDABOUT 2909SH 172 · Safety Improvement Projects | $5,670,190 | $5,347,067 | STX CIVIL | -5.7% | 3 |
| Aug 6, 2026 | 0500-03-664F 2026(852) | Harris Houston |
IH 45 FR OL: N of BNSF RR to CaninoIH 45 · Overlay | $4,502,237 | $5,092,365 | MBN ENTERPRISES LLC | +13.1% | 5 |
| Aug 6, 2026 | 6505-48-001RMC - A00223083 | Cameron Maintenance Division |
PHR Debris Removal & DisposalUS0083 · Routine Maintenance Project - Sealed | $7,033,325 | $4,425,474 | AFTERMATH DISASTER RECOVERY INC | -37.1% | 2 |
| Aug 6, 2026 | 0114-10-102F 2026(879) | Washington Bryan |
US 290WB F: FM 1155 T: Waller CL -RER 26US 290 · Rehabilitation of Existing Road | $4,214,219 | $4,287,440 | BIG CREEK CONSTRUCTION, LTD. | +1.7% | 6 |
| Aug 6, 2026 | 3534-01-021STP 2026(853)VRU | Bell Waco |
PED | FM 3470 | SH 201 | IH 14FM 3470 · Pedestrian, Sidewalks & Curb Ramps | $4,466,140 | $4,094,515 | Rucoba & Maya Construction, LLC | -8.3% | 8 |
| Aug 6, 2026 | 1197-01-027F 2026(856) | Hays Austin |
RM 150 - SE of Darden Hill to RM 1826RM 150 · Safety Improvement Projects | $3,130,181 | $3,441,590 | STX CIVIL | +9.9% | 7 |
| Aug 6, 2026 | 6501-56-001RMC - A00221512 | Bowie Atlanta |
CO Concrete Pavement Repair FY2027US0059 · Routine Maintenance Project - Sealed | $3,544,140 | $3,381,575 | O. TREVINO CONSTRUCTION, LLC | -4.6% | 3 |
| Aug 6, 2026 | 0208-01-026F 2026(875) | Harrison Atlanta |
SH 43 from US 59 to SL 390SH 43 · Overlay | $3,307,700 | $3,320,428 | MADDEN CONTRACTING COMPANY, LLC. | +0.4% | 5 |
| Aug 6, 2026 | 0363-03-061F 2026(985) | Tarrant Fort Worth |
SH 121 FR from Hickory Dr. to Hickory DrSH 121 · Overlay | $2,924,978 | $3,202,525 | FOUTSCO PAVING COMPANY, LLC | +9.5% | 5 |
| Aug 6, 2026 | 0081-01-053BR 2025(243) | Tarrant Fort Worth |
SH 121: SH 121 WB@ IH 35W SBSS 347 · Bridge Maintenance | $1,581,478 | $2,868,397 | RAGLE CONSTRUCTION, INC. | +81.4% | 2 |
| Aug 6, 2026 | 0069-07-113STP 2026(864)HES | Tom Green San Angelo |
0069-07-113 US 87 Intersection ImproveUS 87 · Safety Improvement Projects | $1,800,040 | $2,825,728 | REECE ALBERT, INC. | +57.0% | 2 |
| Aug 6, 2026 | 0911-28-082BR 2025(034) | Houston Lufkin |
CR 1170 at Sikes Creek - HBPCR 1170 · Bridge Replacement | $2,474,314 | $2,809,388 | THK CONSTRUCTION LLC | +13.5% | 6 |
| Aug 6, 2026 | 6500-92-001RMC - A00221146 | Coryell Waco |
Pavement Markings - Site Specific (DW)US0281 · Routine Maintenance Project | $3,504,596 | $2,469,735 | STRIPE-A-ZONE, LLC | -29.5% | 5 |
| Aug 6, 2026 | 0027-10-074BR 2019(124) | Harris Houston |
UA 90, SB AT BUFFALO BAYOUUA 90 · Bridge Maintenance | $1,782,087 | $2,463,336 | GARRET SHIELDS INFRASTRUCTURE | +38.2% | 4 |
| Aug 6, 2026 | 0252-03-056STP 2026(902)VRU | Blanco Austin |
US 281 at PR 1US 281 · Safety Improvement Projects | $2,495,199 | $2,419,095 | HUNTER INDUSTRIES, LTD. | -3.1% | 7 |
| Aug 6, 2026 | 0327-06-031F 2026(873) | Willacy Pharr |
BUS 77W - Impr. Traffic SignalBU 77W · Traffic Control Devices | $2,849,662 | $2,385,103 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | -16.3% | 3 |
Source: TxDOT Bid Tabulations (data.texas.gov), which covers state and local lettings from the previous 24 months. Bid Potato keeps every month it has loaded, so history grows past that window. Totals are as read at the letting; on packaged proposals the low bid can be the whole package total. Confirm against TxDOT's official tabulations.