Bid tab 6481-17-001

Let Dec 17, 2025 · San Antonio · Guadalupe Sign up free

‹ Dec 2025 results

FY2026 FM 775 AT ELM CREEK

Let date
Wednesday, December 17, 2025
CCSJ
6481-17-001
District
San Antonio
County
Guadalupe
Highway
FM0775
Limits
AT ELM CREEK to AT ELM CREEK
Classification
Bridge Preventative Maintenance - Sealed · Maintenance
Project number
BPM - A00214344
Working days
10
DBE goal
0%

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$39,974
1 BK FIELD OPERATIONS LLC Low bidder $33,340 -16.6%
2 TAYLOR BRIDGE LLC $37,988 -5.0% +13.9%
3 GARRET SHIELDS INFRASTRUCTURE $42,577 +6.5% +27.7%
4 DIAMOND R CONTRACTING, LLC $45,484 +13.8% +36.4%
5 TEXAS ROAD CONSTRUCTION, LLC $59,334 +48.4% +78.0%

Bid tab: unit prices 18 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BK FIELD OPERAT…#2 TAYLOR BRIDGE L…#3 GARRET SHIELDS …#4 DIAMOND R CONTR…#5 TEXAS ROAD CONS…
1104-7006 REMOV CONC (RIPRAP)28SY $16.48 $100.00 $100.00 $50.00 $120.00 $125.00
2110-7002 EXCAV (CHANNEL)10CY $9.86 $1.00 $150.00 $50.00 $100.00 $600.00
3161-7002 COMPOST MANUF TOPSOIL (4")250SY $3.00 $1.00 $2.00 $5.00 $1.00 $12.00
4164-7004 BROADCAST SEED (PERM_URBAN_CLAY)250SY $1.06 $1.00 $2.50 $1.50 $1.00 $2.00
5169-7001 SOIL RET BLKT(SL_MOD_CLAY_SHORT)250SY $6.62 $5.00 $5.00 $3.00 $1.00 $2.00
6401-7001 FLOWABLE BACKFILL5CY $50.50 $1.00 $500.00 $500.00 $150.00 $500.00
7432-7002 RIPRAP (CONC)(5 IN)8CY $450.13 $850.00 $500.00 $600.00 $1,000.00 $1,000.00
8432-7029 RIPRAP (STONE COMMON)(DRY)(6 IN)10CY $40.18 $1.00 $200.00 $300.00 $500.00 $1,000.00
9454-7001 TYPE A JOINT17LF $55.75 $70.00 $100.00 $100.00 $100.00 $40.00
10459-7007 GABION MATTRESSES (GALV)(12 IN)95SY $113.83 $130.00 $140.00 $100.00 $100.00 $100.00
11500-7001 MOBILIZATION1LS $10,000.00 $4,000.00 $5,000.00 $5,000.00 $10,000.00 $8,000.00
12502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING1MO $3,500.00 $1.00 $1.00 $5,000.00 $2,500.00 $500.00
13505-7001 TMA (STATIONARY)10DAY $73.78 $1.00 $1.00 $300.00 $1.00 $1.00
14506-7020 CONSTRUCTION EXITS (INSTALL) (TY 1)112SY $21.27 $1.00 $10.00 $10.00 $1.00 $42.00
15506-7024 CONSTRUCTION EXITS (REMOVE)112SY $5.14 $1.00 $1.00 $1.00 $1.00 $5.00
16506-7044 BIODEG EROSN CONT LOGS (INSTL) (12")95LF $4.64 $1.00 $5.00 $5.00 $1.00 $3.00
17506-7046 BIODEG EROSN CONT LOGS (REMOVE)95LF $0.9500 $1.00 $1.00 $1.00 $1.00 $1.00
18735-7061 DRIFTWOOD REMOVAL1LS $3,000.00 $4,000.00 $1,000.00 $2,000.00 $2,500.00 $1,000.00