| 1 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 71 | STA |
$818.19 |
$375.00 |
$800.00 |
$1,250.00 |
|
| 2 | 134-6004 |
BACKFILL (TY A OR B) | 73 | STA |
$291.22 |
$800.00 |
$350.00 |
$1,200.00 |
|
| 3 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 6,459 | SY |
$1.50 |
$0.3500 |
$1.50 |
$1.00 |
|
| 4 | 168-6001 |
VEGETATIVE WATERING | 9.04 | MG |
$91.00 |
$155.00 |
$300.00 |
$140.00 |
|
| 5 | 216-6001 |
PROOF ROLLING | 46 | HR |
$144.64 |
$120.00 |
$25.00 |
$200.00 |
|
| 6 | 351-6003 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(7") | 313 | SY |
$47.00 |
$86.00 |
$145.00 |
$139.00 |
|
| 7 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 1,200 | SY |
$9.10 |
$11.00 |
$16.50 |
$14.00 |
|
| 8 | 354-6043 |
PLANE ASPH CONC PAV (1") | 1,672 | SY |
$2.50 |
$8.00 |
$18.60 |
$9.50 |
|
| 9 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 36 | CY |
$650.00 |
$985.00 |
$1,200.00 |
$1,200.00 |
|
| 10 | 500-6001 |
MOBILIZATION | 1 | LS |
$86,632.00 |
$118,000.00 |
$130,000.00 |
$75,000.00 |
|
| 11 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$3,500.00 |
$1,000.00 |
$4,000.00 |
$25,000.00 |
|
| 12 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 250 | LF |
$7.00 |
$8.50 |
$15.00 |
$5.00 |
|
| 13 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 250 | LF |
$1.75 |
$2.00 |
$5.00 |
$2.00 |
|
| 14 | 530-6005 |
DRIVEWAYS (ACP) | 486 | SY |
$66.23 |
$37.00 |
$102.10 |
$86.00 |
|
| 15 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 7,144 | LF |
$0.8500 |
$0.6000 |
$1.00 |
$2.30 |
|
| 16 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 650 | LF |
$45.00 |
$28.00 |
$32.00 |
$24.00 |
|
| 17 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 2 | EA |
$1,050.00 |
$2,000.00 |
$2,200.00 |
$2,400.00 |
|
| 18 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 650 | LF |
$15.00 |
$2.75 |
$5.00 |
$2.40 |
|
| 19 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 4 | EA |
$210.00 |
$276.00 |
$250.00 |
$300.00 |
|
| 20 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,100.00 |
$3,000.00 |
$3,200.00 |
$4,300.00 |
|
| 21 | 560-6025 |
RELOCATE EXISTING MAILBOX | 6 | EA |
$250.00 |
$385.00 |
$250.00 |
$300.00 |
|
| 22 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 11 | EA |
$841.00 |
$630.00 |
$650.00 |
$760.00 |
|
| 23 | 644-6076 |
REMOVE SM RD SN SUP&AM | 10 | EA |
$134.00 |
$0.1500 |
$99.00 |
$100.00 |
|
| 24 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 15 | EA |
$5.00 |
$27.00 |
$55.00 |
$12.00 |
|
| 25 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 25 | EA |
$40.00 |
$41.00 |
$35.00 |
$30.00 |
|
| 26 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 654 | EA |
$2.00 |
$0.8500 |
$2.00 |
$5.00 |
|
| 27 | 666-6285 |
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL) | 15,886 | LF |
$1.05 |
$1.30 |
$1.00 |
$1.40 |
|
| 28 | 666-6317 |
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) | 1,712 | LF |
$0.7900 |
$0.8500 |
$2.00 |
$0.9000 |
|
| 29 | 666-6320 |
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) | 2,538 | LF |
$0.7500 |
$0.8500 |
$2.00 |
$0.9000 |
|
| 30 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 20 | LF |
$20.00 |
$16.00 |
$40.00 |
$21.00 |
|
| 31 | 672-6009 |
REFL PAV MRKR TY II-A-A | 199 | EA |
$5.00 |
$5.50 |
$6.35 |
$8.25 |
|
| 32 | 712-6017 |
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT) | 15,886 | LF |
$6.00 |
$5.00 |
$4.50 |
$3.50 |
|
| 33 | 3076-6035 |
D-GR HMA TY-D PG64-22 | 2,476 | TON |
$167.00 |
$131.00 |
$165.00 |
$150.00 |
|
| 34 | 3076-6066 |
TACK COAT | 111 | GAL |
$9.60 |
$4.00 |
$4.00 |
$6.00 |
|
| 35 | 3077-6033 |
SP MIXES SP-C SAC-A PG76-22 | 2,461 | TON |
$120.00 |
$150.00 |
$151.80 |
$160.00 |
|
| 36 | 3077-6075 |
TACK COAT | 1,525 | GAL |
$7.00 |
$4.00 |
$4.00 |
$6.00 |
|
| 37 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 60 | DAY |
$100.00 |
$180.00 |
$100.00 |
$200.00 |
|
| 38 | 6185-6002 |
TMA (STATIONARY) | 60 | DAY |
$350.00 |
$365.00 |
$125.00 |
$200.00 |
|
| 39 | 6185-6005 |
TMA (MOBILE OPERATION) | 5 | DAY |
$600.00 |
$700.00 |
$125.00 |
$200.00 |
|