| 1 | 351-6004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 136 | SY |
$100.00 |
$175.00 |
$395.50 |
| 2 | 354-6045 |
PLANE ASPH CONC PAV (2") | 22,710 | SY |
$7.00 |
$4.20 |
$4.00 |
| 3 | 361-6078 |
FULL-DEPTH REPAIR CPJR (VAR DEPTH) | 109 | CY |
$1,850.00 |
$2,000.00 |
$1,746.00 |
| 4 | 500-6001 |
MOBILIZATION | 1 | LS |
$87,044.10 |
$80,000.00 |
$103,000.00 |
| 5 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 | MO |
$5,000.00 |
$4,000.00 |
$2,700.00 |
| 6 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 7,609 | LF |
$3.50 |
$0.6500 |
$2.00 |
| 7 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 6 | EA |
$34.00 |
$55.00 |
$550.00 |
| 8 | 658-6106 |
INSTL OM ASSM (OM-3R)(WFLX)GND)GND | 1 | EA |
$400.00 |
$45.00 |
$550.00 |
| 9 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 668 | EA |
$3.50 |
$1.00 |
$9.00 |
| 10 | 666-6035 |
REFL PAV MRK TY I (W)8"(SLD)(090MIL) | 125 | LF |
$3.50 |
$1.10 |
$2.75 |
| 11 | 666-6308 |
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) | 16,704 | LF |
$1.50 |
$0.6500 |
$1.54 |
| 12 | 666-6317 |
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) | 1,894 | LF |
$3.50 |
$0.7000 |
$1.54 |
| 13 | 666-6320 |
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) | 1,246 | LF |
$2.50 |
$0.7000 |
$1.54 |
| 14 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 21 | LF |
$20.00 |
$21.00 |
$16.50 |
| 15 | 668-6092 |
PREFAB PAV MRK TY C (W) (36")(YLD TRI) | 6 | EA |
$70.00 |
$45.00 |
$49.50 |
| 16 | 672-6002 |
PLOWABLE REFL PAV MRKR TY I-C | 7 | EA |
$1.00 |
$10.00 |
$5.50 |
| 17 | 672-6009 |
REFL PAV MRKR TY II-A-A | 269 | EA |
$8.13 |
$5.00 |
$6.60 |
| 18 | 3077-6033 |
SP MIXES SP-C SAC-A PG76-22 | 2,567 | TON |
$155.00 |
$175.10 |
$250.00 |
| 19 | 3077-6075 |
TACK COAT | 1,363 | GAL |
$7.00 |
$4.00 |
$12.75 |
| 20 | 6185-6002 |
TMA (STATIONARY) | 29 | DAY |
$350.00 |
$125.00 |
$526.00 |
| 21 | 6185-6005 |
TMA (MOBILE OPERATION) | 2 | DAY |
$400.00 |
$125.00 |
$827.00 |