| 1 | 100-6002 |
PREPARING ROW | 94.5 | STA |
$300.00 |
$1,250.00 |
$350.00 |
$180.00 |
|
| 2 | 110-6003 |
EXCAVATION (SPECIAL) | 4,181.8 | CY |
$12.00 |
$12.00 |
$15.00 |
$59.00 |
|
| 3 | 162-6002 |
BLOCK SODDING | 500 | SY |
$5.00 |
$4.25 |
$4.00 |
$3.40 |
|
| 4 | 168-6001 |
VEGETATIVE WATERING | 3,780 | MG |
$9.00 |
$12.00 |
$1.00 |
$10.00 |
|
| 5 | 170-6006 |
IRRIGATION SYSTEM LOCATION A | 1 | LS |
$68,000.00 |
$35,000.00 |
$27,500.00 |
$88,400.00 |
|
| 6 | 170-6007 |
IRRIGATION SYSTEM LOCATION B | 1 | LS |
$30,000.00 |
$140,000.00 |
$104,000.00 |
$52,400.00 |
|
| 7 | 170-6008 |
IRRIGATION SYSTEM LOCATION C | 1 | LS |
$30,000.00 |
$45,000.00 |
$58,500.00 |
$29,700.00 |
|
| 8 | 192-6001 |
PLANT MATERIAL (4" CNTR) | 3,774 | EA |
$2.00 |
$1.00 |
$2.00 |
$1.25 |
|
| 9 | 192-6002 |
PLANT MATERIAL (1-GAL) | 8,934 | EA |
$12.00 |
$5.50 |
$5.60 |
$6.00 |
|
| 10 | 192-6003 |
PLANT MATERIAL (3-GAL) | 4,494 | EA |
$18.00 |
$12.50 |
$19.75 |
$12.00 |
|
| 11 | 192-6004 |
PLANT MATERIAL (5-GAL) | 1,473 | EA |
$30.00 |
$15.00 |
$20.65 |
$10.00 |
|
| 12 | 192-6012 |
MULCH | 832.8 | CY |
$20.00 |
$32.00 |
$30.00 |
$28.00 |
|
| 13 | 192-6015 |
LANDSCAPE EDGE | 130 | LF |
$7.00 |
$20.00 |
$6.00 |
$3.20 |
|
| 14 | 192-6016 |
PLANT BED PREPARATION | 1,472 | SY |
$2.00 |
$1.75 |
$2.50 |
$8.00 |
|
| 15 | 192-6024 |
PLANT MATERIAL (30 GAL) (TREE) | 18 | EA |
$300.00 |
$170.00 |
$250.00 |
$160.00 |
|
| 16 | 192-6026 |
PLANT MATERIAL (65 GAL) (TREE) | 2 | EA |
$600.00 |
$800.00 |
$450.00 |
$280.00 |
|
| 17 | 192-6044 |
PLANT MATERIAL (MIN 2" CAL) (B&B) | 29 | EA |
$500.00 |
$325.00 |
$200.00 |
$220.00 |
|
| 18 | 192-6046 |
PLANT MATERIAL (MIN 3" CAL) (B&B) | 54 | EA |
$700.00 |
$425.00 |
$300.00 |
$310.00 |
|
| 19 | 192-6089 |
PLANT SOIL MIX (TY 2) | 4,508.8 | CY |
$35.00 |
$15.00 |
$40.00 |
$56.00 |
|
| 20 | 192-6097 |
CONC LNDSCP EDG (12 IN WIDTH) | 2,922 | LF |
$18.00 |
$25.00 |
$20.00 |
$16.00 |
|
| 21 | 193-6001 |
PLANT MAINTENANCE | 9 | MO |
$4,000.00 |
$1,100.00 |
$5,000.00 |
$3,400.00 |
|
| 22 | 193-6007 |
IRRIGATION SYSTEM OPER AND MAINT | 9 | MO |
$1,200.00 |
$600.00 |
$750.00 |
$1,400.00 |
|
| 23 | 500-6001 |
MOBILIZATION | 1 | LS |
$115,000.00 |
$30,000.00 |
$68,845.00 |
$30,000.00 |
|
| 24 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 | MO |
$3,500.00 |
$7,250.00 |
$5,000.00 |
$2,200.00 |
|
| 25 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 6,895 | LF |
$5.00 |
$0.1000 |
$0.0100 |
$3.00 |
|
| 26 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 6,895 | LF |
$1.25 |
$0.1000 |
$0.0100 |
$0.7500 |
|
| 27 | 618-6034 |
CONDT (PVC) (SCH 40) (4") (BORE) | 885 | LF |
$25.00 |
$26.00 |
$18.00 |
$26.00 |
|
| 28 | 1005-6001 |
LOOSE AGGR FOR GROUNDCOVER (TYPE I) | 32.6 | CY |
$90.00 |
$100.00 |
$124.00 |
$108.00 |
|
| 29 | 6185-6001 |
TMA (STATIONARY) | 2 | EA |
$10,000.00 |
$3,850.00 |
$200.00 |
$3,800.00 |
|