| 1 | 104-6001 |
REMOVING CONC (PAV) | 249 | SY |
$5.00 |
$24.00 |
$38.00 |
$17.00 |
| 2 | 104-6054 |
REMOVING CONCRETE(MOW STRIP) | 427 | LF |
$4.80 |
$9.00 |
$9.90 |
$12.00 |
| 3 | 105-6014 |
REMOVING STAB BASE & ASPH PAV (7"-12") | 302 | SY |
$4.10 |
$17.00 |
$25.26 |
$11.00 |
| 4 | 110-6001 |
EXCAVATION (ROADWAY) | 158 | CY |
$10.00 |
$35.00 |
$41.00 |
$150.00 |
| 5 | 110-6002 |
EXCAVATION (CHANNEL) | 1,112 | CY |
$12.33 |
$15.00 |
$22.00 |
$15.00 |
| 6 | 112-6002 |
SUBGRADE WIDENING (DENS CONT) | 6.8 | STA |
$306.80 |
$4,153.00 |
$2,840.00 |
$500.00 |
| 7 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 2,599.89 | CY |
$13.38 |
$30.50 |
$34.00 |
$20.00 |
| 8 | 150-6002 |
BLADING | 40 | HR |
$114.64 |
$212.30 |
$140.00 |
$100.00 |
| 9 | 164-6024 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 3.12 | AC |
$2,525.00 |
$701.25 |
$1,565.00 |
$3,062.44 |
| 10 | 168-6001 |
VEGETATIVE WATERING | 169.4 | MG |
$19.27 |
$35.00 |
$34.00 |
$30.00 |
| 11 | 216-6001 |
PROOF ROLLING | 16 | HR |
$45.00 |
$75.00 |
$110.00 |
$50.00 |
| 12 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 39 | CY |
$50.00 |
$173.00 |
$106.00 |
$100.00 |
| 13 | 260-6006 |
LIME TRT (EXST MATL) (6") | 1,288 | SY |
$4.65 |
$9.80 |
$15.98 |
$12.00 |
| 14 | 260-6016 |
LIME (HYD, COM, OR QK(SLURRY)) | 10 | TON |
$196.79 |
$509.00 |
$260.00 |
$216.00 |
| 15 | 316-6405 |
ASPH (AC-20-5TR OR AC-20XP) | 912 | GAL |
$4.00 |
$9.00 |
$3.40 |
$8.00 |
| 16 | 316-6408 |
AGGR(TY-PD GR-4 OR TY-PL GR-4) | 19 | CY |
$167.06 |
$222.00 |
$535.00 |
$400.00 |
| 17 | 400-6005 |
CEM STABIL BKFL | 110 | CY |
$82.24 |
$41.00 |
$185.00 |
$140.00 |
| 18 | 403-6001 |
TEMPORARY SPL SHORING | 1,431 | SF |
$18.49 |
$15.00 |
$64.00 |
$25.00 |
| 19 | 409-6002 |
PRESTR CONC PIL (18 IN SQ) | 1,638 | LF |
$140.00 |
$88.00 |
$127.00 |
$120.00 |
| 20 | 420-6013 |
CL C CONC (ABUT) | 51.6 | CY |
$900.00 |
$2,341.00 |
$2,900.00 |
$1,200.00 |
| 21 | 420-6029 |
CL C CONC (CAP) | 20.6 | CY |
$1,046.65 |
$2,870.00 |
$3,800.00 |
$1,850.00 |
| 22 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 5,670 | SF |
$18.00 |
$22.50 |
$35.00 |
$25.00 |
| 23 | 422-6015 |
APPROACH SLAB | 128 | CY |
$340.97 |
$701.00 |
$630.00 |
$500.00 |
| 24 | 425-6009 |
PRESTR CONC SLAB BEAM (4SB12) | 532 | LF |
$133.00 |
$175.00 |
$183.00 |
$185.00 |
| 25 | 425-6010 |
PRESTR CONC SLAB BEAM (5SB12) | 665 | LF |
$160.00 |
$170.00 |
$163.00 |
$180.00 |
| 26 | 432-6001 |
RIPRAP (CONC)(4 IN) | 76 | CY |
$387.61 |
$778.00 |
$560.00 |
$540.00 |
| 27 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 199 | CY |
$230.00 |
$218.00 |
$240.00 |
$200.00 |
| 28 | 450-6006 |
RAIL (TY T223) | 318 | LF |
$111.68 |
$218.00 |
$200.00 |
$115.00 |
| 29 | 454-6004 |
ARMOR JOINT (SEALED) | 152 | LF |
$110.00 |
$160.00 |
$140.00 |
$100.00 |
| 30 | 464-6005 |
RC PIPE (CL III)(24 IN) | 114 | LF |
$112.00 |
$164.00 |
$98.00 |
$80.00 |
| 31 | 464-6012 |
RC PIPE (CL III)(60 IN) | 144 | LF |
$345.00 |
$645.00 |
$500.00 |
$285.00 |
| 32 | 467-6395 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 6 | EA |
$1,172.16 |
$2,712.00 |
$1,810.00 |
$1,700.00 |
| 33 | 467-6499 |
SET (TY II) (60 IN) (RCP) (6: 1) (P) | 1 | EA |
$14,000.00 |
$19,795.00 |
$22,100.00 |
$14,500.00 |
| 34 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 2 | EA |
$24,250.00 |
$25,806.00 |
$55,300.00 |
$154,000.00 |
| 35 | 500-6001 |
MOBILIZATION | 1 | LS |
$100,000.00 |
$125,000.00 |
$240,000.00 |
$240,000.00 |
| 36 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 13 | MO |
$2,500.00 |
$1,373.00 |
$2,300.00 |
$18,000.00 |
| 37 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 100 | LF |
$33.00 |
$50.00 |
$36.00 |
$60.00 |
| 38 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 100 | LF |
$9.24 |
$3.31 |
$8.10 |
$15.00 |
| 39 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 740 | LF |
$5.80 |
$2.70 |
$5.60 |
$6.00 |
| 40 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 740 | LF |
$1.29 |
$1.00 |
$1.05 |
$1.00 |
| 41 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 11 | MO |
$4,143.79 |
$3,188.00 |
$6,150.00 |
$18,500.00 |
| 42 | 512-6001 |
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 270 | LF |
$41.11 |
$98.00 |
$105.00 |
$100.00 |
| 43 | 512-6025 |
PORT CTB (MOVE)(SGL SLP)(TY 1) | 810 | LF |
$3.99 |
$5.45 |
$10.98 |
$10.00 |
| 44 | 512-6049 |
PORT CTB (REMOVE)(SGL SLP)(TY 1) | 270 | LF |
$7.00 |
$7.80 |
$28.00 |
$10.00 |
| 45 | 512-6108 |
0512-XXXX PTB (SSCB)(STRUCTURAL) | 215 | LF |
$200.00 |
$253.00 |
$78.00 |
$70.00 |
| 46 | 530-6016 |
DRIVEWAYS (BASE) | 420 | SY |
$22.00 |
$51.45 |
$33.00 |
$14.00 |
| 47 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 800 | LF |
$24.65 |
$26.00 |
$28.00 |
$23.60 |
| 48 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 8 | EA |
$1,850.00 |
$2,176.00 |
$1,840.00 |
$1,940.00 |
| 49 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 375 | LF |
$2.50 |
$2.50 |
$2.55 |
$2.16 |
| 50 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,555.00 |
$3,500.00 |
$2,700.00 |
$3,115.00 |
| 51 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 2 | EA |
$350.00 |
$332.00 |
$255.00 |
$297.00 |
| 52 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 4 | EA |
$1,900.00 |
$1,795.00 |
$1,910.00 |
$2,000.00 |
| 53 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 4 | EA |
$900.00 |
$1,795.00 |
$910.00 |
$1,200.00 |
| 54 | 545-6007 |
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 4 | EA |
$22,616.67 |
$30,692.00 |
$24,700.00 |
$6,995.00 |
| 55 | 658-6013 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB | 15 | EA |
$22.00 |
$27.90 |
$24.10 |
$25.00 |
| 56 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 24 | EA |
$28.00 |
$44.65 |
$39.25 |
$25.00 |
| 57 | 662-6050 |
WK ZN PAV MRK REMOV (REFL) TY II-A-A | 540 | EA |
$4.00 |
$3.35 |
$3.05 |
$3.00 |
| 58 | 662-6057 |
WK ZN PAV MRK REMOV (TRAF BTN) TY W | 120 | LF |
$1.60 |
$5.60 |
$5.10 |
$2.50 |
| 59 | 662-6058 |
WK ZN PAV MRK REMOV (TRAF BTN) TY Y | 4,320 | EA |
$3.26 |
$3.35 |
$3.10 |
$3.00 |
| 60 | 662-6075 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 96 | LF |
$8.05 |
$16.75 |
$15.25 |
$5.00 |
| 61 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 170 | EA |
$0.9500 |
$3.00 |
$3.35 |
$1.50 |
| 62 | 666-6224 |
PAVEMENT SEALER 4" | 2,461 | LF |
$0.2000 |
$0.2500 |
$0.2200 |
$0.2500 |
| 63 | 666-6302 |
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | 1,640 | LF |
$0.3400 |
$1.45 |
$1.38 |
$0.5000 |
| 64 | 666-6311 |
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) | 821 | LF |
$0.2600 |
$1.60 |
$1.45 |
$0.5000 |
| 65 | 672-6009 |
REFL PAV MRKR TY II-A-A | 178 | EA |
$3.10 |
$6.00 |
$5.45 |
$5.00 |
| 66 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 2,461 | LF |
$0.3900 |
$0.9000 |
$0.0900 |
$0.5000 |
| 67 | 677-6007 |
ELIM EXT PAV MRK & MRKS (24") | 96 | LF |
$3.00 |
$8.54 |
$7.70 |
$3.00 |
| 68 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 2,461 | LF |
$0.0100 |
$0.4500 |
$0.4300 |
$0.3000 |
| 69 | 3076-6003 |
D-GR HMA TY-B PG64-22 (EXEMPT) | 53 | TON |
$90.16 |
$275.00 |
$425.00 |
$800.00 |
| 70 | 3076-6071 |
D-GR HMA TY-D PG 64-22 (EXEMPT) | 2 | TON |
$152.00 |
$750.00 |
$620.00 |
$800.00 |
| 71 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 320 | DAY |
$119.00 |
$0.9000 |
$135.00 |
$80.00 |
| 72 | 6185-6002 |
TMA (STATIONARY) | 320 | DAY |
$310.00 |
$131.50 |
$300.00 |
$220.00 |
| 73 | 6185-6005 |
TMA (MOBILE OPERATION) | 20 | DAY |
$200.00 |
$229.50 |
$675.00 |
$550.00 |