| 1 | 100-6028 |
PREP ROW (TREE PRUNING) | 5 | EA |
$4,500.00 |
$703.80 |
$6,160.00 |
$3,400.00 |
$550.00 |
$4,500.00 |
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 326 | CY |
$35.00 |
$27.37 |
$40.30 |
$55.00 |
$33.00 |
$35.00 |
| 3 | 112-6001 |
SUBGRADE WIDENING (ORD COMP) | 2 | STA |
$3,200.00 |
$2,052.75 |
$4,510.00 |
$3,500.00 |
$2,750.00 |
$6,349.00 |
| 4 | 132-6007 |
EMBANKMENT (FINAL)(ORD COMP)(TY D) | 31 | CY |
$75.00 |
$273.70 |
$166.00 |
$158.00 |
$55.00 |
$30.00 |
| 5 | 216-6001 |
PROOF ROLLING | 10 | HR |
$125.00 |
$313.78 |
$580.00 |
$290.00 |
$192.50 |
$150.00 |
| 6 | 247-6041 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 80 | CY |
$110.00 |
$462.16 |
$188.00 |
$310.00 |
$275.00 |
$362.00 |
| 7 | 310-6005 |
PRIME COAT (AE-P) | 86 | GAL |
$22.00 |
$23.46 |
$25.00 |
$26.00 |
$27.50 |
$18.00 |
| 8 | 400-6005 |
CEM STABIL BKFL | 25 | CY |
$245.00 |
$199.41 |
$280.00 |
$332.00 |
$330.00 |
$113.00 |
| 9 | 409-6002 |
PRESTR CONC PIL (18 IN SQ) | 676 | LF |
$84.29 |
$172.19 |
$155.00 |
$195.00 |
$220.00 |
$693.00 |
| 10 | 420-6013 |
CL C CONC (ABUT) | 17.6 | CY |
$2,400.00 |
$2,789.88 |
$3,810.00 |
$3,700.00 |
$3,300.00 |
$2,558.00 |
| 11 | 420-6025 |
CL C CONC (BENT) | 13.2 | CY |
$2,400.00 |
$2,083.25 |
$3,880.00 |
$3,700.00 |
$5,500.00 |
$3,133.00 |
| 12 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 2,340 | SF |
$30.00 |
$28.49 |
$43.80 |
$33.00 |
$33.00 |
$53.00 |
| 13 | 422-6015 |
APPROACH SLAB | 38.5 | CY |
$685.00 |
$513.77 |
$749.00 |
$1,000.00 |
$1,650.00 |
$2,047.00 |
| 14 | 425-6010 |
PRESTR CONC SLAB BEAM (5SB12) | 442.5 | LF |
$326.53 |
$149.10 |
$254.00 |
$120.00 |
$302.50 |
$81.00 |
| 15 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 683 | CY |
$100.00 |
$134.80 |
$49.70 |
$240.00 |
$247.50 |
$248.00 |
| 16 | 450-6006 |
RAIL (TY T223) | 204 | LF |
$160.00 |
$305.97 |
$237.00 |
$280.00 |
$302.50 |
$250.00 |
| 17 | 454-6003 |
ARMOR JOINT | 44 | LF |
$195.00 |
$180.11 |
$323.00 |
$322.00 |
$150.00 |
$106.00 |
| 18 | 496-6009 |
REMOV STR (BRIDGE 0 - 99 FT LENGTH) | 1 | EA |
$35,000.00 |
$26,392.50 |
$70,000.00 |
$52,000.00 |
$55,000.00 |
$26,308.00 |
| 19 | 500-6001 |
MOBILIZATION | 1 | LS |
$135,392.79 |
$66,157.20 |
$103,000.00 |
$93,000.00 |
$110,000.00 |
$130,000.00 |
| 20 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$6,000.00 |
$2,919.05 |
$5,240.00 |
$4,200.00 |
$5,500.00 |
$11,096.00 |
| 21 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 50 | LF |
$60.00 |
$41.06 |
$146.00 |
$50.00 |
$330.00 |
$92.00 |
| 22 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 50 | LF |
$20.00 |
$20.53 |
$41.50 |
$12.00 |
$11.00 |
$24.00 |
| 23 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 320 | LF |
$5.00 |
$6.42 |
$12.40 |
$5.50 |
$16.50 |
$8.00 |
| 24 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 320 | LF |
$1.50 |
$3.20 |
$3.91 |
$1.00 |
$5.50 |
$2.00 |
| 25 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 50 | LF |
$45.00 |
$38.24 |
$91.00 |
$36.00 |
$44.00 |
$41.00 |
| 26 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,200.00 |
$2,193.51 |
$3,660.00 |
$2,060.00 |
$4,400.00 |
$3,731.00 |
| 27 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,100.00 |
$3,753.60 |
$5,320.00 |
$3,520.00 |
$5,500.00 |
$5,000.00 |
| 28 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 8 | EA |
$25.00 |
$23.46 |
$42.60 |
$55.00 |
$110.00 |
$17.00 |
| 29 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 8 | EA |
$30.00 |
$46.92 |
$75.00 |
$55.00 |
$110.00 |
$35.00 |
| 30 | 3076-6066 |
TACK COAT | 43 | GAL |
$21.30 |
$29.33 |
$24.40 |
$50.00 |
$165.00 |
$60.00 |
| 31 | 3076-6071 |
D-GR HMA TY-D PG 64-22 (EXEMPT) | 47 | TON |
$402.00 |
$763.62 |
$461.00 |
$470.00 |
$330.00 |
$360.00 |
| 32 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
$9,518.90 |
$5,890.00 |
$5,600.00 |
$22,000.00 |
$7,634.00 |