| 1 | 100-6002 |
PREPARING ROW | 4.4 | STA |
$7,700.00 |
$7,137.00 |
$5,757.50 |
$40,000.00 |
|
| 2 | 110-6001 |
EXCAVATION (ROADWAY) | 230 | CY |
$35.00 |
$5.00 |
$40.00 |
$75.00 |
|
| 3 | 110-6002 |
EXCAVATION (CHANNEL) | 225 | CY |
$70.00 |
$6.50 |
$40.00 |
$50.00 |
|
| 4 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 120 | CY |
$50.00 |
$2.00 |
$40.00 |
$62.00 |
|
| 5 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 2,229 | SY |
$6.00 |
$4.00 |
$1.14 |
$4.00 |
|
| 6 | 164-6023 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 2,229 | SY |
$1.50 |
$0.9500 |
$1.00 |
$1.00 |
|
| 7 | 164-6029 |
CELL FBR MLCH SEED(TEMP)(WARM) | 1,115 | SY |
$1.70 |
$3.00 |
$1.00 |
$1.00 |
|
| 8 | 164-6031 |
CELL FBR MLCH SEED(TEMP)(COOL) | 1,115 | SY |
$2.00 |
$4.00 |
$1.00 |
$1.00 |
|
| 9 | 168-6001 |
VEGETATIVE WATERING | 22.3 | MG |
$200.00 |
$45.00 |
$10.41 |
$30.00 |
|
| 10 | 247-6230 |
FL BS (CMP IN PLACE)(TY A GR 1-2)(8") | 788 | SY |
$45.00 |
$30.00 |
$14.51 |
$50.00 |
|
| 11 | 316-6029 |
ASPH (RC-250) | 181 | GAL |
$15.00 |
$14.00 |
$4.70 |
$27.00 |
|
| 12 | 316-6403 |
AGGR (TY-B GR-5 OR TY-L GR-5) | 6 | CY |
$690.00 |
$492.00 |
$145.45 |
$2,000.00 |
|
| 13 | 400-6005 |
CEM STABIL BKFL | 53 | CY |
$250.00 |
$58.00 |
$200.00 |
$260.00 |
|
| 14 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 180 | LF |
$60.00 |
$2.50 |
$4.00 |
$20.00 |
|
| 15 | 416-6002 |
DRILL SHAFT (24 IN) | 660 | LF |
$260.00 |
$208.00 |
$220.00 |
$275.00 |
|
| 16 | 420-6013 |
CL C CONC (ABUT) | 20.4 | CY |
$1,710.00 |
$2,391.00 |
$2,200.00 |
$2,600.00 |
|
| 17 | 420-6029 |
CL C CONC (CAP) | 13.2 | CY |
$2,040.00 |
$3,537.00 |
$2,200.00 |
$3,600.00 |
|
| 18 | 420-6037 |
CL C CONC (COLUMN) | 5.3 | CY |
$2,140.00 |
$7,990.00 |
$2,200.00 |
$3,300.00 |
|
| 19 | 422-6007 |
REINF CONC SLAB (SLAB BEAM) | 3,640 | SF |
$30.00 |
$91.00 |
$30.00 |
$35.00 |
|
| 20 | 425-6012 |
PRESTR CONC SLAB BEAM (5SB15) | 692.5 | LF |
$285.00 |
$298.00 |
$271.91 |
$330.00 |
|
| 21 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 401 | CY |
$255.00 |
$217.00 |
$330.00 |
$220.00 |
|
| 22 | 450-6018 |
RAIL (TY T631) | 304 | LF |
$95.00 |
$94.00 |
$123.08 |
$83.00 |
|
| 23 | 454-6004 |
ARMOR JOINT (SEALED) | 51 | LF |
$180.00 |
$101.00 |
$112.58 |
$160.00 |
|
| 24 | 496-6010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 1 | EA |
$165,000.00 |
$9,838.00 |
$80,966.98 |
$100,000.00 |
|
| 25 | 496-6043 |
REMOV STR (SMALL FENCE) | 732 | LF |
$10.00 |
$1.70 |
$5.00 |
$3.00 |
|
| 26 | 500-6001 |
MOBILIZATION | 1 | LS |
$150,000.00 |
$120,000.00 |
$270,000.00 |
$170,000.00 |
|
| 27 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 | MO |
$10,800.00 |
$3,835.00 |
$8,838.77 |
$1,000.00 |
|
| 28 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 94 | LF |
$45.00 |
$40.00 |
$42.00 |
$35.00 |
|
| 29 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 94 | LF |
$20.00 |
$1.70 |
$12.00 |
$10.00 |
|
| 30 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 1,047 | LF |
$6.00 |
$4.00 |
$4.75 |
$5.00 |
|
| 31 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 1,047 | LF |
$2.00 |
$1.10 |
$1.75 |
$1.75 |
|
| 32 | 508-6001 |
CONSTRUCTING DETOURS | 935 | SY |
$105.00 |
$26.00 |
$89.00 |
$115.00 |
|
| 33 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 5 | MO |
$5,250.00 |
$5,311.00 |
$700.00 |
$5,000.00 |
|
| 34 | 512-6009 |
PORT CTB (FUR & INST)(LOW PROF)(TY 1) | 660 | LF |
$60.00 |
$31.00 |
$65.00 |
$35.00 |
|
| 35 | 512-6010 |
PORT CTB (FUR & INST)(LOW PROF)(TY 2) | 80 | LF |
$65.00 |
$32.00 |
$62.00 |
$35.00 |
|
| 36 | 512-6057 |
PORT CTB (REMOVE)(LOW PROF)(TY 1) | 660 | LF |
$20.00 |
$7.50 |
$7.95 |
$18.00 |
|
| 37 | 512-6058 |
PORT CTB (REMOVE)(LOW PROF)(TY 2) | 80 | LF |
$25.00 |
$8.00 |
$11.26 |
$18.00 |
|
| 38 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 137.5 | LF |
$35.00 |
$30.00 |
$27.00 |
$26.00 |
|
| 39 | 540-6007 |
MTL BEAM GD FEN TRANS (TL2) | 4 | EA |
$1,550.00 |
$1,536.00 |
$1,409.00 |
$1,300.00 |
|
| 40 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,400.00 |
$3,496.00 |
$3,138.14 |
$3,000.00 |
|
| 41 | 552-6001 |
WIRE FENCE (TY A) | 703 | LF |
$45.00 |
$2.50 |
$15.43 |
$15.00 |
|
| 42 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 8 | EA |
$580.00 |
$320.00 |
$420.00 |
$420.00 |
|
| 43 | 644-6076 |
REMOVE SM RD SN SUP&AM | 2 | EA |
$145.00 |
$112.00 |
$112.81 |
$100.00 |
|
| 44 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 9 | EA |
$50.00 |
$39.00 |
$35.00 |
$32.00 |
|
| 45 | 3077-6011 |
SP MIXES SP-C PG64-22 | 117 | TON |
$200.00 |
$177.00 |
$105.15 |
$310.00 |
|
| 46 | 4046-6001 |
TEMPORARY DETOUR BRIDGE | 1 | EA |
$165,000.00 |
$153,577.00 |
$296,500.00 |
$150,000.00 |
|
| 47 | 4171-6001 |
INSTALL BRIDGE IDENTIFICATION NUMBERS | 2 | EA |
$500.00 |
$550.00 |
$333.16 |
$350.00 |
|