| 1 | 134-6004 |
BACKFILL (TY A OR B) | 322 | STA |
$350.00 |
$255.60 |
$397.00 |
$335.00 |
| 2 | 164-6003 |
BROADCAST SEED (PERM) (RURAL) (CLAY) | 35,769 | SY |
$1.00 |
$0.2000 |
$0.1800 |
$0.1800 |
| 3 | 168-6001 |
VEGETATIVE WATERING | 301 | MG |
$15.00 |
$25.00 |
$28.00 |
$10.00 |
| 4 | 351-6004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,762 | SY |
$120.00 |
$70.80 |
$79.00 |
$64.00 |
| 5 | 354-6002 |
PLAN & TEXT ASPH CONC PAV(0" TO 2") | 1,956 | SY |
$4.00 |
$5.90 |
$8.35 |
$6.50 |
| 6 | 354-6043 |
PLANE ASPH CONC PAV (1") | 14,308 | SY |
$3.00 |
$1.80 |
$2.00 |
$2.00 |
| 7 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 82 | CY |
$600.00 |
$722.60 |
$918.00 |
$1,200.00 |
| 8 | 500-6001 |
MOBILIZATION | 1 | LS |
$575,000.00 |
$206,436.00 |
$115,000.00 |
$140,000.00 |
| 9 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$6,000.00 |
$5,151.00 |
$2,400.00 |
$4,000.00 |
| 10 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 1,000 | LF |
$5.00 |
$5.80 |
$5.50 |
$5.50 |
| 11 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,000 | LF |
$1.00 |
$1.60 |
$1.50 |
$1.50 |
| 12 | 530-6011 |
INTRSCT, DRVWAYS, & TURNOUT (ACP) | 1,772 | SY |
$50.00 |
$29.10 |
$40.50 |
$32.35 |
| 13 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 63,919 | LF |
$1.00 |
$0.0500 |
$0.0700 |
$0.1500 |
| 14 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 31,727 | LF |
$1.00 |
$0.1000 |
$0.0800 |
$0.1500 |
| 15 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 1,500 | LF |
$30.00 |
$23.80 |
$20.01 |
$20.01 |
| 16 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,150 | LF |
$3.00 |
$2.70 |
$2.26 |
$2.26 |
| 17 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 8 | EA |
$3,000.00 |
$2,987.00 |
$2,825.00 |
$2,825.00 |
| 18 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 8 | EA |
$300.00 |
$211.50 |
$311.00 |
$311.00 |
| 19 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 36 | EA |
$600.00 |
$460.00 |
$492.00 |
$492.00 |
| 20 | 644-6030 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 2 | EA |
$1,000.00 |
$777.20 |
$713.00 |
$713.00 |
| 21 | 644-6033 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 2 | EA |
$1,200.00 |
$956.90 |
$984.00 |
$984.00 |
| 22 | 644-6076 |
REMOVE SM RD SN SUP&AM | 40 | EA |
$100.00 |
$100.50 |
$75.00 |
$75.00 |
| 23 | 658-6064 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 31 | EA |
$40.00 |
$37.00 |
$30.00 |
$30.00 |
| 24 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 2,166 | EA |
$1.50 |
$1.70 |
$0.8000 |
$1.00 |
| 25 | 666-6308 |
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) | 63,919 | LF |
$0.7500 |
$0.4000 |
$0.3900 |
$0.5500 |
| 26 | 666-6317 |
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL) | 5,800 | LF |
$0.7500 |
$0.4000 |
$0.4000 |
$0.5500 |
| 27 | 666-6320 |
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) | 20,365 | LF |
$0.7500 |
$0.4000 |
$0.3900 |
$0.5500 |
| 28 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 36 | LF |
$12.00 |
$13.20 |
$12.50 |
$22.36 |
| 29 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 2 | EA |
$300.00 |
$264.30 |
$250.00 |
$405.00 |
| 30 | 672-6009 |
REFL PAV MRKR TY II-A-A | 558 | EA |
$5.00 |
$4.30 |
$4.00 |
$5.00 |
| 31 | 3076-6038 |
D-GR HMA TY-D PG64-22 (LEVEL-UP) | 4,829 | TON |
$120.00 |
$117.70 |
$127.00 |
$127.25 |
| 32 | 3076-6066 |
TACK COAT | 3,219 | GAL |
$7.00 |
$4.90 |
$3.50 |
$4.00 |
| 33 | 3077-6065 |
SP MIXES SP-D SAC-A PG76-22 | 17,313 | TON |
$130.00 |
$120.70 |
$125.00 |
$126.38 |
| 34 | 3077-6075 |
TACK COAT | 9,444 | GAL |
$7.00 |
$4.20 |
$3.50 |
$4.00 |
| 35 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
$5,287.00 |
$8,000.00 |
$6,000.00 |
| 36 | 6056-6001 |
PREFORMED IN-LANE(TRANS) RUMBLE STRIP | 160 | LF |
$20.00 |
$20.60 |
$19.50 |
$19.50 |
| 37 | 6185-6002 |
TMA (STATIONARY) | 51 | DAY |
$350.00 |
$410.30 |
$270.00 |
$100.00 |
| 38 | 6185-6005 |
TMA (MOBILE OPERATION) | 18 | DAY |
$350.00 |
$26.50 |
$600.00 |
$100.00 |