| 1 | 100-6002 |
PREPARING ROW | 59 | STA |
$2,000.00 |
$2,400.00 |
$3,000.00 |
$2,800.00 |
$2,500.00 |
$998.00 |
| 2 | 103-6001 |
DISPOSAL OF WATER WELLS | 1 | EA |
$2,000.00 |
$3,500.00 |
$5,000.00 |
$5,000.00 |
$5,000.00 |
$10,241.00 |
| 3 | 105-6122 |
REMOVE TRT BASE & ASPH PAV (20"-30") | 19,911.2 | SY |
$8.00 |
$11.50 |
$10.50 |
$13.00 |
$10.00 |
$11.39 |
| 4 | 110-6001 |
EXCAVATION (ROADWAY) | 17,680 | CY |
$7.00 |
$6.00 |
$6.00 |
$7.00 |
$10.00 |
$7.40 |
| 5 | 110-6002 |
EXCAVATION (CHANNEL) | 28 | CY |
$15.00 |
$50.00 |
$30.00 |
$20.00 |
$100.00 |
$28.41 |
| 6 | 132-6002 |
EMBANKMENT (FINAL)(DENS CONT)(TY A) | 12,690 | CY |
$15.00 |
$7.75 |
$8.50 |
$10.00 |
$15.00 |
$13.87 |
| 7 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 86,827 | CY |
$7.00 |
$6.75 |
$7.00 |
$8.50 |
$12.37 |
$7.83 |
| 8 | 160-6004 |
FURNISHING AND PLACING TOPSOIL (6") | 83,280 | SY |
$1.25 |
$1.25 |
$2.00 |
$1.25 |
$2.00 |
$1.44 |
| 9 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 41,640 | SY |
$0.2000 |
$0.1600 |
$0.1200 |
$0.1700 |
$0.1400 |
$0.2300 |
| 10 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 20,425 | SY |
$0.1200 |
$0.1500 |
$0.0800 |
$0.1500 |
$0.1400 |
$0.2700 |
| 11 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 20,425 | SY |
$0.1200 |
$0.1500 |
$0.1000 |
$0.1500 |
$0.1300 |
$0.2500 |
| 12 | 164-6054 |
BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | 83,280 | SY |
$0.9000 |
$0.9500 |
$0.7500 |
$1.00 |
$0.9600 |
$1.09 |
| 13 | 168-6001 |
VEGETATIVE WATERING | 666.2 | MG |
$10.00 |
$7.00 |
$10.00 |
$15.00 |
$5.00 |
$12.04 |
| 14 | 169-6003 |
SOIL RETENTION BLANKETS (CL 1) (TY C) | 14,700 | SY |
$2.00 |
$1.45 |
$1.00 |
$1.60 |
$2.00 |
$1.61 |
| 15 | 247-6304 |
FL BS (CMP IN PLACE) (TY D GR 1-2)(10") | 20,428.2 | SY |
$20.00 |
$20.50 |
$25.00 |
$22.00 |
$15.00 |
$21.70 |
| 16 | 275-6001 |
CEMENT | 683 | TON |
$150.00 |
$180.00 |
$175.00 |
$155.00 |
$140.00 |
$156.75 |
| 17 | 275-6010 |
CEMENT TREAT (SUBGRADE) (8") | 25,943.5 | SY |
$2.25 |
$2.65 |
$4.00 |
$3.00 |
$2.50 |
$3.01 |
| 18 | 275-6031 |
CEMENT TREAT (NEW BASE) (10") | 20,428.2 | SY |
$2.50 |
$2.75 |
$4.50 |
$4.00 |
$2.50 |
$3.61 |
| 19 | 310-6021 |
PRIME COAT & BLOTTER (MC-30) | 5,128 | GAL |
$5.00 |
$4.00 |
$6.00 |
$5.00 |
$4.50 |
$4.82 |
| 20 | 316-6004 |
ASPH (TIER I) | 8,203 | GAL |
$5.00 |
$4.00 |
$6.00 |
$4.50 |
$4.50 |
$4.82 |
| 21 | 316-6415 |
AGGR (TY-B GR-3) | 207 | CY |
$100.00 |
$110.00 |
$120.00 |
$160.00 |
$150.00 |
$156.75 |
| 22 | 340-6106 |
D-GR HMA(SQ) TY-D PG64-22 | 1,897 | TON |
$125.00 |
$110.00 |
$110.00 |
$105.00 |
$110.00 |
$134.00 |
| 23 | 344-6138 |
SUPERPAVE MIXTURES SP-D PG76-22 | 2,171.7 | TON |
$150.00 |
$110.00 |
$98.00 |
$100.00 |
$103.00 |
$119.50 |
| 24 | 354-6002 |
PLAN & TEXT ASPH CONC PAV(0" TO 2") | 8,534 | SY |
$3.00 |
$2.65 |
$3.00 |
$2.00 |
$7.00 |
$1.76 |
| 25 | 360-6004 |
CONC PVMT (CONT REINF - CRCP) (10") | 4,212.7 | SY |
$75.00 |
$82.00 |
$80.00 |
$77.00 |
$75.00 |
$106.50 |
| 26 | 400-6005 |
CEM STABIL BKFL | 572.4 | CY |
$160.00 |
$235.00 |
$175.00 |
$140.00 |
$180.00 |
$123.25 |
| 27 | 403-6001 |
TEMPORARY SPL SHORING | 41,001 | SF |
$15.00 |
$20.00 |
$20.00 |
$22.00 |
$20.00 |
$41.02 |
| 28 | 407-6004 |
SHEET PILING (PZ - 35) | 4,000 | SF |
$44.00 |
$2.50 |
$48.00 |
$35.00 |
$35.00 |
$58.52 |
| 29 | 416-6004 |
DRILL SHAFT (36 IN) | 1,810 | LF |
$300.00 |
$160.00 |
$130.00 |
$140.00 |
$100.00 |
$201.25 |
| 30 | 420-6001 |
CL A CONC (SEAL) | 50 | CY |
$350.00 |
$300.00 |
$400.00 |
$250.00 |
$350.00 |
$412.00 |
| 31 | 420-6014 |
CL C CONC (ABUT)(HPC) | 127.8 | CY |
$1,000.00 |
$815.00 |
$900.00 |
$850.00 |
$900.00 |
$1,012.00 |
| 32 | 420-6030 |
CL C CONC (CAP)(HPC) | 122.6 | CY |
$1,200.00 |
$830.00 |
$950.00 |
$850.00 |
$1,500.00 |
$1,075.00 |
| 33 | 420-6038 |
CL C CONC (COLUMN)(HPC) | 63.2 | CY |
$1,200.00 |
$875.00 |
$1,000.00 |
$850.00 |
$1,500.00 |
$1,159.00 |
| 34 | 422-6002 |
REINF CONC SLAB (HPC) | 37,720 | SF |
$18.00 |
$17.75 |
$17.00 |
$17.00 |
$17.00 |
$20.00 |
| 35 | 422-6016 |
APPROACH SLAB (HPC) | 240.4 | CY |
$500.00 |
$460.00 |
$500.00 |
$475.00 |
$500.00 |
$540.00 |
| 36 | 425-6039 |
PRESTR CONC GIRDER (TX54) | 4,896 | LF |
$150.00 |
$170.00 |
$140.00 |
$150.00 |
$141.00 |
$181.00 |
| 37 | 427-6004 |
SILICONE RESIN PAINT FINISH | 4,318 | SF |
$3.10 |
$2.75 |
$4.00 |
$3.50 |
$1.77 |
$2.17 |
| 38 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 1,072 | CY |
$160.00 |
$135.00 |
$175.00 |
$120.00 |
$150.00 |
$145.50 |
| 39 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 86 | CY |
$500.00 |
$485.00 |
$450.00 |
$450.00 |
$400.00 |
$458.50 |
| 40 | 450-6024 |
RAIL (TY SSTR)(HPC) | 1,736 | LF |
$85.00 |
$68.00 |
$80.00 |
$100.00 |
$90.00 |
$77.88 |
| 41 | 454-6004 |
ARMOR JOINT (SEALED) | 252 | LF |
$80.00 |
$60.00 |
$100.00 |
$70.00 |
$150.00 |
$107.25 |
| 42 | 462-6002 |
CONC BOX CULV (3 FT X 3 FT) | 32 | LF |
$225.00 |
$405.00 |
$300.00 |
$400.00 |
$270.00 |
$341.25 |
| 43 | 462-6004 |
CONC BOX CULV (4 FT X 3 FT) | 95 | LF |
$300.00 |
$325.00 |
$400.00 |
$400.00 |
$300.00 |
$363.00 |
| 44 | 464-6003 |
RC PIPE (CL III)(18 IN) | 132 | LF |
$45.00 |
$55.00 |
$35.00 |
$35.00 |
$35.00 |
$52.02 |
| 45 | 464-6005 |
RC PIPE (CL III)(24 IN) | 410 | LF |
$55.00 |
$64.00 |
$50.00 |
$48.00 |
$55.00 |
$63.45 |
| 46 | 464-6007 |
RC PIPE (CL III)(30 IN) | 50 | LF |
$65.00 |
$85.00 |
$75.00 |
$65.00 |
$70.00 |
$106.00 |
| 47 | 464-6008 |
RC PIPE (CL III)(36 IN) | 56 | LF |
$150.00 |
$110.00 |
$100.00 |
$95.00 |
$80.00 |
$119.25 |
| 48 | 466-6179 |
WINGWALL (PW - 1) (HW=4 FT) | 2 | EA |
$9,000.00 |
$8,600.00 |
$4,500.00 |
$7,000.00 |
$6,500.00 |
$7,171.00 |
| 49 | 467-6106 |
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C) | 1 | EA |
$5,700.00 |
$6,500.00 |
$4,500.00 |
$4,000.00 |
$6,000.00 |
$5,024.00 |
| 50 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 6 | EA |
$750.00 |
$850.00 |
$600.00 |
$575.00 |
$550.00 |
$788.50 |
| 51 | 467-6395 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 18 | EA |
$1,300.00 |
$1,075.00 |
$900.00 |
$900.00 |
$1,100.00 |
$1,236.00 |
| 52 | 467-6419 |
SET (TY II) (30 IN) (RCP) (4: 1) (C) | 2 | EA |
$1,800.00 |
$1,335.00 |
$1,000.00 |
$1,100.00 |
$1,200.00 |
$3,791.00 |
| 53 | 467-6454 |
SET (TY II) (36 IN) (RCP) (6: 1) (P) | 4 | EA |
$3,780.00 |
$3,500.00 |
$5,000.00 |
$4,500.00 |
$3,500.00 |
$3,832.00 |
| 54 | 496-6007 |
REMOV STR (PIPE) | 364 | LF |
$21.50 |
$12.00 |
$10.00 |
$15.00 |
$30.00 |
$15.98 |
| 55 | 496-6008 |
REMOV STR (BOX CULVERT) | 32 | LF |
$62.00 |
$80.00 |
$200.00 |
$65.00 |
$70.00 |
$107.75 |
| 56 | 496-6010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 2 | EA |
$100,000.00 |
$35,000.00 |
$40,000.00 |
$26,000.00 |
$60,000.00 |
$97,000.00 |
| 57 | 500-6001 |
MOBILIZATION | 1 | LS |
$978,875.22 |
$550,000.00 |
$800,000.00 |
$735,000.00 |
$500,000.00 |
$1,100,000.00 |
| 58 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 26 | MO |
$2,500.00 |
$2,500.00 |
$1,500.00 |
$4,000.00 |
$1,500.00 |
$2,738.00 |
| 59 | 506-6002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 150 | LF |
$40.00 |
$32.00 |
$40.00 |
$30.00 |
$40.00 |
$120.50 |
| 60 | 506-6003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 357 | LF |
$45.00 |
$44.00 |
$40.00 |
$65.00 |
$40.00 |
$152.25 |
| 61 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 507 | LF |
$8.00 |
$11.00 |
$10.00 |
$5.00 |
$10.00 |
$24.97 |
| 62 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 300 | SY |
$25.00 |
$28.00 |
$25.00 |
$25.00 |
$25.00 |
$50.01 |
| 63 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 300 | SY |
$8.00 |
$10.00 |
$10.00 |
$5.00 |
$9.50 |
$14.49 |
| 64 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 30,779 | LF |
$2.50 |
$2.70 |
$2.50 |
$3.00 |
$2.48 |
$2.32 |
| 65 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 30,779 | LF |
$1.00 |
$1.10 |
$1.00 |
$1.00 |
$1.00 |
$0.9300 |
| 66 | 508-6001 |
CONSTRUCTING DETOURS | 14,878 | SY |
$75.00 |
$35.00 |
$57.00 |
$55.00 |
$45.00 |
$42.50 |
| 67 | 512-6063 |
PORT CTB (MOVE) (SAFETY SH) (TY 2) | 950 | LF |
$50.00 |
$13.50 |
$6.00 |
$7.00 |
$25.00 |
$6.98 |
| 68 | 512-6065 |
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2) | 11,875 | LF |
$50.00 |
$22.00 |
$12.00 |
$15.00 |
$25.00 |
$14.25 |
| 69 | 512-6079 |
PORT CTB (STKPL)(SAFETY SH) | 11,875 | LF |
$25.00 |
$22.00 |
$12.00 |
$13.00 |
$25.00 |
$11.40 |
| 70 | 530-6005 |
DRIVEWAYS (ACP) | 2,048 | SY |
$50.00 |
$55.00 |
$60.00 |
$52.00 |
$25.00 |
$12.12 |
| 71 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 2,852.5 | LF |
$22.00 |
$23.65 |
$18.00 |
$21.00 |
$16.00 |
$25.30 |
| 72 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 10 | EA |
$1,575.00 |
$1,600.00 |
$1,265.00 |
$1,500.00 |
$1,150.00 |
$1,928.00 |
| 73 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 3,100 | LF |
$3.50 |
$3.85 |
$2.00 |
$3.00 |
$1.50 |
$3.61 |
| 74 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,400.00 |
$2,295.00 |
$2,150.00 |
$2,400.00 |
$2,060.00 |
$3,133.00 |
| 75 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 10 | EA |
$400.00 |
$250.00 |
$200.00 |
$250.00 |
$250.00 |
$361.50 |
| 76 | 545-6002 |
CRASH CUSH ATTEN (DES SOURCE) | 8 | EA |
$3,000.00 |
$6,200.00 |
$2,400.00 |
$2,600.00 |
$3,000.00 |
$3,615.00 |
| 77 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 2 | EA |
$350.00 |
$6,200.00 |
$1,000.00 |
$1,200.00 |
$3,000.00 |
$4,820.00 |
| 78 | 545-6004 |
CRASH CUSH ATTEN (STKPL) | 8 | EA |
$2,000.00 |
$1,375.00 |
$1,000.00 |
$1,000.00 |
$800.00 |
$2,410.00 |
| 79 | 560-6011 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 4 | EA |
$200.00 |
$405.00 |
$400.00 |
$400.00 |
$400.00 |
$443.25 |
| 80 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 1 | EA |
$800.00 |
$570.00 |
$550.00 |
$600.00 |
$1,000.00 |
$623.50 |
| 81 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 5 | EA |
$300.00 |
$520.00 |
$500.00 |
$525.00 |
$1,000.00 |
$567.25 |
| 82 | 644-6076 |
REMOVE SM RD SN SUP&AM | 10 | EA |
$60.00 |
$140.00 |
$150.00 |
$130.00 |
$300.00 |
$151.25 |
| 83 | 658-6013 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB | 8 | EA |
$35.00 |
$60.00 |
$15.00 |
$25.00 |
$25.00 |
$25.30 |
| 84 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 70 | EA |
$40.00 |
$44.00 |
$20.00 |
$25.00 |
$25.00 |
$28.91 |
| 85 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 10,300 | LF |
$0.3000 |
$0.5500 |
$0.5000 |
$0.5500 |
$0.2500 |
$0.6000 |
| 86 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 10,300 | LF |
$0.3000 |
$0.5500 |
$0.5000 |
$0.5500 |
$0.2500 |
$0.6000 |
| 87 | 662-6056 |
WK ZN PAV MRK REMOV (TRAF BTN) TY W | 832 | EA |
$2.25 |
$3.85 |
$3.50 |
$4.00 |
$3.00 |
$4.22 |
| 88 | 662-6058 |
WK ZN PAV MRK REMOV (TRAF BTN) TY Y | 416 | EA |
$2.25 |
$3.85 |
$3.50 |
$4.00 |
$3.00 |
$4.22 |
| 89 | 666-6224 |
PAVEMENT SEALER 4" | 7,200 | LF |
$0.3000 |
$0.2200 |
$0.2000 |
$0.2200 |
$0.2000 |
$0.2400 |
| 90 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 12 | LF |
$12.00 |
$19.25 |
$18.00 |
$20.00 |
$16.00 |
$21.09 |
| 91 | 672-6009 |
REFL PAV MRKR TY II-A-A | 208 | EA |
$3.50 |
$4.40 |
$4.00 |
$4.50 |
$5.00 |
$4.82 |
| 92 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 9,600 | LF |
$1.00 |
$0.5800 |
$0.5500 |
$0.6000 |
$0.3500 |
$0.6200 |
| 93 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 7,200 | LF |
$0.1000 |
$0.1800 |
$0.1500 |
$0.1800 |
$0.3500 |
$0.1800 |
| 94 | 5040-6001 |
FLOATING TURBIDITY BARRIER | 200 | LF |
$75.00 |
$55.00 |
$50.00 |
$60.00 |
$50.00 |
$57.83 |
| 95 | 6056-6001 |
PREFORMED IN-LANE(TRANS) RUMBLE STRIP | 16,600 | LF |
$3.50 |
$3.20 |
$2.90 |
$3.30 |
$8.00 |
$3.48 |
| 96 | 6056-6002 |
PREFORMED CENTERLINE RUMBLE STRIP | 8,300 | LF |
$3.50 |
$3.20 |
$2.90 |
$3.30 |
$8.00 |
$3.48 |
| 97 | 6149-6013 |
REFL PAV MRK AWT (W) (4")(SLD)(125 MIL) | 16,600 | LF |
$0.5000 |
$0.5000 |
$0.4500 |
$0.5000 |
$0.7000 |
$0.5500 |
| 98 | 6149-6019 |
REFL PAV MRK AWT (Y) (4")(SLD)(125 MIL) | 16,600 | LF |
$0.5000 |
$0.5000 |
$0.4500 |
$0.5000 |
$0.7000 |
$0.5500 |