| 1 | 100-6002 |
PREPARING ROW | 40.85 | STA |
$1,100.00 |
$605.00 |
$1,000.00 |
$600.00 |
| 2 | 100-6008 |
PREPARING ROW (TREE) (0" TO 6" DIA) | 4 | EA |
$1,500.00 |
$495.00 |
$1,000.00 |
$1,500.00 |
| 3 | 104-6009 |
REMOVING CONC (RIPRAP) | 112 | SY |
$100.00 |
$33.59 |
$40.00 |
$40.00 |
| 4 | 104-6015 |
REMOVING CONC (SIDEWALKS) | 172 | SY |
$60.00 |
$21.87 |
$40.00 |
$55.00 |
| 5 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 975 | SY |
$35.00 |
$23.15 |
$40.00 |
$45.00 |
| 6 | 104-6029 |
REMOVING CONC (CURB OR CURB & GUTTER) | 3,396 | LF |
$10.00 |
$11.08 |
$40.00 |
$10.00 |
| 7 | 104-6040 |
REMOVING CONC (PAVERS) | 21 | SY |
$20.00 |
$35.83 |
$40.00 |
$75.00 |
| 8 | 105-6037 |
REMOVING STAB BASE AND ASPH PAV(0"-16") | 539 | SY |
$10.00 |
$27.92 |
$40.00 |
$45.00 |
| 9 | 106-6002 |
OBLITERATING ABANDONED ROAD | 68 | SY |
$20.00 |
$33.19 |
$40.00 |
$47.00 |
| 10 | 110-6001 |
EXCAVATION (ROADWAY) | 349 | CY |
$20.00 |
$64.68 |
$40.00 |
$100.00 |
| 11 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 310 | CY |
$20.00 |
$72.81 |
$40.00 |
$95.00 |
| 12 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 2,571 | SY |
$3.00 |
$8.17 |
$20.00 |
$8.00 |
| 13 | 162-6002 |
BLOCK SODDING | 2,571 | SY |
$6.00 |
$6.60 |
$4.00 |
$7.00 |
| 14 | 168-6001 |
VEGETATIVE WATERING | 25.8 | MG |
$25.00 |
$1.10 |
$10.00 |
$54.00 |
| 15 | 247-6061 |
FL BS (CMP IN PLC)(TYA GR1-2) (6") | 1,049 | SY |
$100.00 |
$18.80 |
$60.00 |
$52.00 |
| 16 | 310-6001 |
PRIME COAT (MULTI OPTION) | 213 | GAL |
$10.00 |
$11.00 |
$10.00 |
$60.00 |
| 17 | 351-6006 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") | 165 | SY |
$100.00 |
$115.50 |
$150.00 |
$135.00 |
| 18 | 354-6030 |
PLANE ASPH CONC PAV(0" TO 8") | 2,094 | SY |
$15.00 |
$13.20 |
$8.00 |
$17.00 |
| 19 | 420-6074 |
CL C CONC (MISC) | 6.7 | CY |
$1,000.00 |
$1,218.53 |
$2,500.00 |
$2,300.00 |
| 20 | 420-6132 |
CL A CONC (STEPS) | 1.7 | CY |
$1,500.00 |
$1,218.53 |
$2,500.00 |
$3,300.00 |
| 21 | 432-6001 |
RIPRAP (CONC)(4 IN) | 5.3 | CY |
$1,000.00 |
$1,218.53 |
$800.00 |
$1,300.00 |
| 22 | 450-6047 |
RAIL (HANDRAIL)(TY A) | 30 | LF |
$200.00 |
$280.50 |
$200.00 |
$200.00 |
| 23 | 465-6557 |
INLET (CURB)(SPL) | 1 | EA |
$3,000.00 |
$24,461.85 |
$4,800.00 |
$13,500.00 |
| 24 | 471-6003 |
GRATE & FRAME | 30 | EA |
$2,000.00 |
$2,972.38 |
$1,500.00 |
$2,600.00 |
| 25 | 479-6005 |
ADJUSTING MANHOLES (WATER VALVE BOX) | 5 | EA |
$1,500.00 |
$752.40 |
$500.00 |
$900.00 |
| 26 | 479-6008 |
ADJUSTING MANHOLES (WATER METER) | 4 | EA |
$1,500.00 |
$940.50 |
$500.00 |
$800.00 |
| 27 | 500-6001 |
MOBILIZATION | 1 | LS |
$124,000.00 |
$151,300.05 |
$180,000.00 |
$180,000.00 |
| 28 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$5,000.00 |
$1,650.00 |
$10,000.00 |
$4,700.00 |
| 29 | 506-6035 |
SANDBAGS FOR EROSION CONTROL | 90 | EA |
$10.00 |
$1.10 |
$1.00 |
$35.00 |
| 30 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 100 | LF |
$5.00 |
$1.10 |
$2.00 |
$9.00 |
| 31 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 100 | LF |
$2.00 |
$1.10 |
$1.00 |
$2.00 |
| 32 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 300 | LF |
$7.00 |
$1.10 |
$1.00 |
$8.00 |
| 33 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 300 | LF |
$2.00 |
$1.10 |
$1.00 |
$1.00 |
| 34 | 508-6001 |
CONSTRUCTING DETOURS | 10 | SY |
$500.00 |
$55.00 |
$200.00 |
$300.00 |
| 35 | 528-6001 |
COLORED TEXTURED CONC (4") | 149 | SY |
$120.00 |
$197.05 |
$200.00 |
$95.00 |
| 36 | 529-6002 |
CONC CURB (TY II) | 455 | LF |
$35.00 |
$48.06 |
$35.00 |
$60.00 |
| 37 | 529-6008 |
CONC CURB & GUTTER (TY II) | 2,825 | LF |
$35.00 |
$48.06 |
$45.00 |
$38.00 |
| 38 | 529-6020 |
CONC CURB & GUTTER (ARMOR CURB) | 42 | LF |
$300.00 |
$473.06 |
$500.00 |
$400.00 |
| 39 | 530-6004 |
DRIVEWAYS (CONC) | 1,219 | SY |
$100.00 |
$105.39 |
$120.00 |
$150.00 |
| 40 | 530-6005 |
DRIVEWAYS (ACP) | 32 | SY |
$75.00 |
$110.00 |
$120.00 |
$170.00 |
| 41 | 531-6001 |
CONC SIDEWALKS (4") | 1,679 | SY |
$80.00 |
$80.02 |
$100.00 |
$105.00 |
| 42 | 531-6018 |
CURB RAMPS (TY 1) | 18 | SY |
$165.00 |
$148.69 |
$180.00 |
$355.00 |
| 43 | 531-6019 |
CURB RAMPS (TY 2) | 14 | SY |
$165.00 |
$148.69 |
$180.00 |
$500.00 |
| 44 | 531-6020 |
CURB RAMPS (TY 3) | 142 | SY |
$165.00 |
$148.69 |
$180.00 |
$220.00 |
| 45 | 531-6023 |
CURB RAMPS (TY 6) | 20 | SY |
$165.00 |
$148.69 |
$180.00 |
$450.00 |
| 46 | 531-6024 |
CURB RAMPS (TY 7) | 101 | SY |
$165.00 |
$148.69 |
$180.00 |
$280.00 |
| 47 | 531-6027 |
CURB RAMPS (TY 10) | 12 | SY |
$165.00 |
$148.69 |
$180.00 |
$430.00 |
| 48 | 531-6030 |
CURB RAMPS (TY 21) | 53 | SY |
$165.00 |
$148.69 |
$180.00 |
$430.00 |
| 49 | 531-6033 |
CONC SIDEWALKS (SPECIAL) (TYPE B) | 759 | SY |
$200.00 |
$236.23 |
$211.00 |
$185.00 |
| 50 | 536-6002 |
CONC MEDIAN | 481 | SY |
$120.00 |
$210.82 |
$200.00 |
$155.00 |
| 51 | 556-6006 |
PIPE UNDERDRAINS (TY 6) (6") | 399 | LF |
$20.00 |
$38.50 |
$40.00 |
$65.00 |
| 52 | 560-6007 |
MAILBOX INSTALL-S (WC-POST) TY 3 | 8 | EA |
$275.00 |
$214.50 |
$300.00 |
$240.00 |
| 53 | 560-6008 |
MAILBOX INSTALL-D (WC-POST) TY 3 | 1 | EA |
$300.00 |
$258.50 |
$400.00 |
$290.00 |
| 54 | 624-6009 |
GROUND BOX TY D (162922) | 2 | EA |
$1,200.00 |
$2,090.00 |
$1,000.00 |
$1,700.00 |
| 55 | 624-6028 |
REMOVE GROUND BOX | 2 | EA |
$600.00 |
$165.00 |
$400.00 |
$490.00 |
| 56 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 9 | EA |
$750.00 |
$763.40 |
$750.00 |
$850.00 |
| 57 | 644-6068 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 4 | EA |
$600.00 |
$740.30 |
$750.00 |
$830.00 |
| 58 | 662-6075 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 40 | LF |
$10.00 |
$38.50 |
$10.00 |
$45.00 |
| 59 | 666-6030 |
REFL PAV MRK TY I (W)8"(DOT)(100MIL) | 63 | LF |
$2.00 |
$2.75 |
$2.00 |
$3.00 |
| 60 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 295 | LF |
$2.00 |
$2.20 |
$2.00 |
$3.50 |
| 61 | 666-6042 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 249 | LF |
$4.00 |
$3.30 |
$5.00 |
$3.70 |
| 62 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 679 | LF |
$12.00 |
$7.15 |
$9.00 |
$8.00 |
| 63 | 666-6132 |
REFL PAV MRK TY I (Y)6"(DOT)(100MIL) | 30 | LF |
$1.00 |
$3.58 |
$2.00 |
$4.00 |
| 64 | 666-6141 |
REFL PAV MRK TY I (Y)12"(SLD)(100MIL) | 120 | LF |
$4.00 |
$2.75 |
$6.00 |
$3.00 |
| 65 | 666-6156 |
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL) | 1 | EA |
$600.00 |
$275.00 |
$400.00 |
$300.00 |
| 66 | 666-6170 |
REFL PAV MRK TY II (W) 4" (SLD) | 39 | LF |
$1.00 |
$2.20 |
$1.00 |
$2.50 |
| 67 | 666-6174 |
REFL PAV MRK TY II (W) 6" (SLD) | 603 | LF |
$1.00 |
$1.27 |
$1.00 |
$1.50 |
| 68 | 666-6210 |
REFL PAV MRK TY II (Y) 6" (SLD) | 968 | LF |
$1.00 |
$1.32 |
$1.00 |
$1.50 |
| 69 | 666-6224 |
PAVEMENT SEALER 4" | 39 | LF |
$1.00 |
$0.0600 |
$0.2500 |
$0.0500 |
| 70 | 666-6225 |
PAVEMENT SEALER 6" | 1,601 | LF |
$1.00 |
$0.1000 |
$0.5000 |
$0.1000 |
| 71 | 666-6226 |
PAVEMENT SEALER 8" | 358 | LF |
$1.00 |
$0.1300 |
$1.00 |
$0.1500 |
| 72 | 666-6228 |
PAVEMENT SEALER 12" | 369 | LF |
$1.00 |
$0.2000 |
$1.00 |
$0.2500 |
| 73 | 666-6230 |
PAVEMENT SEALER 24" | 679 | LF |
$2.00 |
$0.4000 |
$2.00 |
$0.4500 |
| 74 | 666-6231 |
PAVEMENT SEALER (ARROW) | 9 | EA |
$50.00 |
$9.90 |
$40.00 |
$11.00 |
| 75 | 666-6232 |
PAVEMENT SEALER (WORD) | 6 | EA |
$100.00 |
$9.90 |
$40.00 |
$11.00 |
| 76 | 666-6233 |
PAVEMENT SEALER (MED NOSE) | 1 | EA |
$500.00 |
$16.50 |
$100.00 |
$18.00 |
| 77 | 666-6234 |
PAVEMENT SEALER (DBL ARROW) | 2 | EA |
$100.00 |
$16.50 |
$50.00 |
$18.00 |
| 78 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 9 | EA |
$250.00 |
$297.00 |
$300.00 |
$350.00 |
| 79 | 668-6078 |
PREFAB PAV MRK TY C (W) (DBL ARROW) | 2 | EA |
$400.00 |
$581.90 |
$420.00 |
$650.00 |
| 80 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 6 | EA |
$300.00 |
$431.20 |
$320.00 |
$485.00 |
| 81 | 672-6007 |
REFL PAV MRKR TY I-C | 6 | EA |
$4.00 |
$7.70 |
$6.00 |
$9.00 |
| 82 | 672-6009 |
REFL PAV MRKR TY II-A-A | 48 | EA |
$5.00 |
$7.70 |
$6.00 |
$8.00 |
| 83 | 672-6010 |
REFL PAV MRKR TY II-C-R | 22 | EA |
$5.00 |
$7.70 |
$6.00 |
$8.00 |
| 84 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 1,467 | LF |
$1.00 |
$0.4200 |
$1.00 |
$0.4500 |
| 85 | 677-6003 |
ELIM EXT PAV MRK & MRKS (8") | 1,215 | LF |
$2.00 |
$0.8300 |
$2.00 |
$0.9000 |
| 86 | 677-6007 |
ELIM EXT PAV MRK & MRKS (24") | 418 | LF |
$5.00 |
$2.42 |
$4.00 |
$2.75 |
| 87 | 677-6008 |
ELIM EXT PAV MRK & MRKS (ARROW) | 12 | EA |
$100.00 |
$33.00 |
$75.00 |
$37.00 |
| 88 | 677-6009 |
ELIM EXT PAV MRK & MRKS (DBL ARROW) | 1 | EA |
$100.00 |
$66.00 |
$75.00 |
$75.00 |
| 89 | 677-6012 |
ELIM EXT PAV MRK & MRKS (WORD) | 6 | EA |
$100.00 |
$33.00 |
$75.00 |
$35.00 |
| 90 | 678-6001 |
PAV SURF PREP FOR MRK (4") | 39 | LF |
$0.5000 |
$0.0400 |
$1.00 |
$0.0500 |
| 91 | 678-6002 |
PAV SURF PREP FOR MRK (6") | 1,601 | LF |
$0.5000 |
$0.0400 |
$1.00 |
$0.0500 |
| 92 | 678-6004 |
PAV SURF PREP FOR MRK (8") | 358 | LF |
$0.5000 |
$0.0700 |
$1.00 |
$0.0500 |
| 93 | 678-6006 |
PAV SURF PREP FOR MRK (12") | 369 | LF |
$1.00 |
$0.1100 |
$1.00 |
$0.1500 |
| 94 | 678-6008 |
PAV SURF PREP FOR MRK (24") | 679 | LF |
$2.00 |
$0.2200 |
$1.00 |
$0.2500 |
| 95 | 678-6009 |
PAV SURF PREP FOR MRK (ARROW) | 9 | EA |
$50.00 |
$7.70 |
$25.00 |
$8.50 |
| 96 | 678-6010 |
PAV SURF PREP FOR MRK (DBL ARROW) | 2 | EA |
$50.00 |
$7.70 |
$25.00 |
$8.50 |
| 97 | 678-6016 |
PAV SURF PREP FOR MRK (WORD) | 6 | EA |
$50.00 |
$7.70 |
$25.00 |
$8.50 |
| 98 | 678-6024 |
PAV SURF PREP FOR MRK (MED NOSE) | 1 | EA |
$300.00 |
$5.50 |
$50.00 |
$6.00 |
| 99 | 688-6002 |
PED DETECT PUSH BUTTON (STANDARD) | 2 | EA |
$600.00 |
$1,375.00 |
$800.00 |
$550.00 |
| 100 | 690-6030 |
REMOVAL OF PEDESTRIAN PUSH BUTTONS | 2 | EA |
$100.00 |
$55.00 |
$300.00 |
$150.00 |
| 101 | 1004-6001 |
TREE PROTECTION | 17 | EA |
$1,500.00 |
$165.00 |
$1,000.00 |
$250.00 |
| 102 | 3076-6003 |
D-GR HMA TY-B PG64-22 (EXEMPT) | 92 | TON |
$200.00 |
$330.00 |
$180.00 |
$310.00 |
| 103 | 3076-6066 |
TACK COAT | 175 | GAL |
$10.00 |
$11.00 |
$8.00 |
$15.00 |
| 104 | 3076-6072 |
D-GR HMA TY-D PG 76-22 (EXEMPT) | 220 | TON |
$200.00 |
$330.00 |
$180.00 |
$315.00 |
| 105 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 222 | DAY |
$185.00 |
$1.10 |
$150.00 |
$200.00 |
| 106 | 6185-6002 |
TMA (STATIONARY) | 110 | DAY |
$185.00 |
$1.10 |
$300.00 |
$475.00 |
| 107 | 6185-6005 |
TMA (MOBILE OPERATION) | 1 | DAY |
$185.00 |
$1.10 |
$300.00 |
$475.00 |