| 1 | 100-2002 |
PREPARING ROW | 32 | STA |
$200.00 |
$942.00 |
$465.00 |
$1,250.00 |
|
| 2 | 104-2017 |
REMOVING CONC (DRIVEWAYS) | 671 | SY |
$10.00 |
$19.50 |
$12.00 |
$7.00 |
|
| 3 | 112-2002 |
SUBGRADE WIDENING (DENS CONT) | 54 | STA |
$250.00 |
$208.00 |
$200.00 |
$300.00 |
|
| 4 | 132-2019 |
EMBANKMENT (VEHICLE)(ORD COMP)(TY B) | 2,402 | CY |
$20.00 |
$21.50 |
$8.50 |
$15.00 |
|
| 5 | 134-2002 |
BACKFILL (TY B) | 54 | STA |
$200.00 |
$134.00 |
$98.00 |
$175.00 |
|
| 6 | 150-2001 |
BLADING | 54 | STA |
$200.00 |
$104.00 |
$245.00 |
$75.00 |
|
| 7 | 158-2005 |
SPEC EXCAV WORK (ORIGINAL) | 2,581 | CY |
$7.00 |
$10.50 |
$6.25 |
$9.00 |
|
| 8 | 162-2002 |
BLOCK SODDING | 2,626 | SY |
$3.45 |
$3.85 |
$4.18 |
$4.00 |
|
| 9 | 164-2011 |
BROADCAST SEED (TEMP) (COOL) | 12,076 | SY |
$0.1500 |
$0.1000 |
$0.1200 |
$0.3700 |
|
| 10 | 164-2023 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 21,760 | SY |
$0.2500 |
$0.2300 |
$0.2800 |
$0.3200 |
|
| 11 | 168-2001 |
VEGETATIVE WATERING | 328.2 | MG |
$11.60 |
$10.00 |
$7.00 |
$15.00 |
|
| 12 | 260-2004 |
LIME (QUICKLIME (DRY)) | 281 | TON |
$230.00 |
$162.00 |
$160.00 |
$150.00 |
|
| 13 | 260-2011 |
LIME TRT (EXST MATL) (12") | 10,386 | SY |
$5.00 |
$4.55 |
$3.05 |
$4.75 |
|
| 14 | 305-2013 |
SALV, HAUL & STKPL RCL ASPH PAV (7") | 3,259 | SY |
$5.00 |
$7.44 |
$9.30 |
$5.00 |
|
| 15 | 310-2001 |
PRIME COAT (MC-30) | 2,077 | GAL |
$6.00 |
$5.75 |
$5.50 |
$5.25 |
|
| 16 | 316-2431 |
AGGR(TY-E OR TY-L GR-4) | 92 | CY |
$150.00 |
$135.00 |
$145.00 |
$170.00 |
|
| 17 | 316-2566 |
ASPH (AC-15P OR AC-10-2TR OR CRS-2P) | 4,263 | GAL |
$6.00 |
$4.45 |
$3.90 |
$4.50 |
|
| 18 | 400-2005 |
CEM STABIL BKFL | 107 | CY |
$100.00 |
$127.00 |
$131.00 |
$135.00 |
|
| 19 | 400-2008 |
CUT & RESTORING PAV (ASPH) | 66 | SY |
$100.00 |
$112.00 |
$158.00 |
$160.00 |
|
| 20 | 416-2029 |
DRILL SHAFT (RDWY ILL POLE) (30 IN) | 12 | LF |
$300.00 |
$166.00 |
$195.00 |
$165.00 |
|
| 21 | 432-2001 |
RIPRAP (CONC)(4 IN) | 2 | CY |
$600.00 |
$550.00 |
$578.00 |
$600.00 |
|
| 22 | 464-2003 |
RC PIPE (CL III)(18 IN) | 614 | LF |
$45.00 |
$53.00 |
$47.25 |
$45.00 |
|
| 23 | 464-2005 |
RC PIPE (CL III)(24 IN) | 236 | LF |
$65.00 |
$75.00 |
$94.50 |
$95.00 |
|
| 24 | 465-2003 |
INLET (COMPL)(TY H) | 1 | EA |
$2,800.00 |
$3,240.00 |
$3,675.00 |
$3,200.00 |
|
| 25 | 467-2286 |
SET (TY II)(18 IN)(RCP)(6:1)(P) | 26 | EA |
$665.00 |
$630.00 |
$787.50 |
$800.00 |
|
| 26 | 467-2288 |
SET (TY II)(24 IN)(RCP)(6:1)(P) | 6 | EA |
$985.00 |
$951.00 |
$893.00 |
$950.00 |
|
| 27 | 496-2016 |
REMOV STR (PIPE) | 16 | EA |
$270.00 |
$220.00 |
$473.00 |
$500.00 |
|
| 28 | 500-2001 |
MOBILIZATION | 1 | LS |
$100,000.00 |
$145,000.00 |
$92,750.00 |
$170,000.00 |
|
| 29 | 502-2001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$4,500.00 |
$2,220.00 |
$1,685.00 |
$5,500.00 |
|
| 30 | 530-2010 |
DRIVEWAYS (CONC) | 468 | SY |
$100.00 |
$75.00 |
$79.00 |
$90.00 |
|
| 31 | 530-2011 |
DRIVEWAYS (ACP) | 851 | SY |
$30.00 |
$20.32 |
$26.00 |
$44.00 |
|
| 32 | 530-2017 |
TURNOUTS (ACP) | 13 | SY |
$50.00 |
$350.00 |
$85.00 |
$275.00 |
|
| 33 | 533-2006 |
SHOULDER TEXTURING (MILLED)(ASPHALT) | 12,508 | LF |
$0.3000 |
$0.6000 |
$0.4200 |
$0.3200 |
|
| 34 | 560-2004 |
MAILBOX INSTALL-S (WC-POST) TY 3 FND | 2 | EA |
$132.00 |
$225.00 |
$233.00 |
$325.00 |
|
| 35 | 610-2022 |
INS RD IL AM (TY SA) 40S-8 (.25 KW)S | 2 | EA |
$4,000.00 |
$3,200.00 |
$3,413.00 |
$3,100.00 |
|
| 36 | 618-2034 |
CONDT (PVC) (SCHD 80) (2") | 470 | LF |
$8.00 |
$10.00 |
$5.25 |
$10.00 |
|
| 37 | 618-2035 |
CONDT (PVC) (SCHD 80) (2") (BORE) | 100 | LF |
$18.00 |
$17.35 |
$20.00 |
$17.00 |
|
| 38 | 620-2011 |
ELEC CONDR (NO. 8) BARE | 570 | LF |
$1.00 |
$1.26 |
$1.84 |
$1.25 |
|
| 39 | 620-2012 |
ELEC CONDR (NO. 8) INSULATED | 1,140 | LF |
$1.05 |
$1.37 |
$2.10 |
$1.35 |
|
| 40 | 624-2008 |
GROUND BOX TY A (122311) W/APRON | 7 | EA |
$675.00 |
$784.00 |
$682.50 |
$765.00 |
|
| 41 | 628-2005 |
ELC SRV TY A 120/240 060 (NS)SS(E)SP(O) | 2 | EA |
$4,000.00 |
$3,950.00 |
$4,620.00 |
$4,000.00 |
|
| 42 | 644-2001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 1 | EA |
$430.00 |
$420.00 |
$618.00 |
$425.00 |
|
| 43 | 644-2002 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | 7 | EA |
$400.00 |
$615.00 |
$728.00 |
$565.00 |
|
| 44 | 644-2027 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 2 | EA |
$640.00 |
$700.00 |
$1,115.00 |
$700.00 |
|
| 45 | 644-2030 |
IN SM RD SN SUP&AM TYS80(1)SA(U-BM) | 1 | EA |
$670.00 |
$745.00 |
$1,160.00 |
$750.00 |
|
| 46 | 644-2060 |
REMOVE SM RD SN SUP & AM | 27 | EA |
$65.00 |
$55.00 |
$64.50 |
$85.00 |
|
| 47 | 644-2081 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 26 | EA |
$230.00 |
$253.00 |
$395.00 |
$265.00 |
|
| 48 | 658-2316 |
INSTL OM ASSM (OM-2Z)(FLX)GND | 10 | EA |
$60.00 |
$50.00 |
$48.00 |
$45.00 |
|
| 49 | 662-2001 |
WK ZN PAV MRK NON-REMOV (W) 4" (BRK) | 1,620 | LF |
$0.2500 |
$0.2100 |
$1.05 |
$0.9500 |
|
| 50 | 662-2012 |
WK ZN PAV MRK NON-REMOV (W) 8" (SLD) | 4,433 | LF |
$0.4000 |
$0.2100 |
$1.58 |
$0.9500 |
|
| 51 | 662-2116 |
WK ZN PAV MRK SHT TERM RMV(W)(4") | 2,165 | LF |
$1.10 |
$1.00 |
$0.7900 |
$0.9000 |
|
| 52 | 666-2002 |
REFL PAV MRK TY I (W) 4" (BRK)(090MIL) | 1,620 | LF |
$0.4000 |
$0.3900 |
$0.7900 |
$0.3200 |
|
| 53 | 666-2011 |
REFL PAV MRK TY I (W) 4" (SLD)(090MIL) | 6,822 | LF |
$0.4000 |
$0.3900 |
$0.7900 |
$0.3000 |
|
| 54 | 666-2029 |
REFL PAV MRK TY I (W) 8" (DOT)(090MIL) | 654 | LF |
$1.25 |
$2.20 |
$1.05 |
$1.10 |
|
| 55 | 666-2035 |
REFL PAV MRK TY I (W) 8" (SLD)(090MIL) | 4,433 | LF |
$1.25 |
$1.05 |
$1.00 |
$0.9500 |
|
| 56 | 666-2110 |
REFL PAV MRK TY I (Y) 4" (SLD)(090MIL) | 6,349 | LF |
$0.4000 |
$0.3900 |
$0.7900 |
$0.3000 |
|
| 57 | 668-2106 |
PREFAB PAV MRK TY C (W) (ARROW) | 8 | EA |
$175.00 |
$220.00 |
$178.50 |
$200.00 |
|
| 58 | 668-2116 |
PREFAB PAV MRK TY C (W) (WORD) | 8 | EA |
$250.00 |
$220.00 |
$252.00 |
$240.00 |
|
| 59 | 672-2017 |
REFL PAV MRKR TY II-C-R | 367 | EA |
$10.00 |
$5.50 |
$5.25 |
$3.56 |
|
| 60 | 1122-2002 |
ROCK FILTER DAMS (INSTALL) (TY 2) | 120 | LF |
$30.00 |
$29.75 |
$28.50 |
$45.00 |
|
| 61 | 1122-2009 |
ROCK FILTER DAMS (REMOVE) | 120 | LF |
$7.00 |
$5.50 |
$9.25 |
$10.00 |
|
| 62 | 1122-2017 |
CONSTRUCTION EXITS (INSTALL) (TY 2) | 148 | SY |
$30.00 |
$29.00 |
$32.50 |
$30.00 |
|
| 63 | 1122-2019 |
CONSTRUCTION EXITS (REMOVE) | 148 | SY |
$6.30 |
$8.00 |
$13.00 |
$5.00 |
|
| 64 | 1122-2037 |
TEMPORARY SEDIMENT CONTROL FENCE INSTLL | 470 | LF |
$2.50 |
$3.15 |
$3.65 |
$4.75 |
|
| 65 | 1122-2057 |
TEMPORARY SEDIMENT CONTROL FENCE REMOVE | 470 | LF |
$1.00 |
$0.5500 |
$1.60 |
$0.5000 |
|
| 66 | 3268-2008 |
D-GR HMA TY-B PG64-22 | 6,383 | TON |
$90.00 |
$85.85 |
$96.50 |
$95.00 |
|
| 67 | 3269-2002 |
PFC (ASPHALT) PG76-22 | 175 | TON |
$800.00 |
$0.0100 |
$0.0100 |
$135.00 |
|
| 68 | 3269-2006 |
PFC (AGGREGATE)(PG76 MIX) SAC-A | 2,190 | TON |
$100.00 |
$134.94 |
$150.00 |
$135.00 |
|
| 69 | 6834-2002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
$5,000.00 |
$9,500.00 |
$6,000.00 |
|