| 1 | 100-7002 |
PREPARING ROW | 43.04 | STA |
$1,400.00 |
$30.00 |
$200.00 |
$240.00 |
$2,000.00 |
| 2 | 134-7004 |
BACKFILL (TY A OR B) | 7 | STA |
$450.00 |
$500.00 |
$1,800.00 |
$930.00 |
$650.00 |
| 3 | 161-7002 |
COMPOST MANUF TOPSOIL (4") | 614 | SY |
$7.00 |
$5.00 |
$9.00 |
$5.40 |
$10.00 |
| 4 | 162-7002 |
BLOCK SODDING | 614 | SY |
$7.00 |
$8.00 |
$8.00 |
$8.75 |
$10.00 |
| 5 | 168-7001 |
VEGETATIVE WATERING | 93 | TGL |
$10.00 |
$1.00 |
$110.00 |
$55.00 |
$52.00 |
| 6 | 344-7021 |
SP MIXES SP-C SAC-B PG70-22 | 2,060 | TON |
$165.00 |
$147.00 |
$162.00 |
$161.00 |
$200.00 |
| 7 | 344-7077 |
TACK COAT | 2,039 | GAL |
$5.00 |
$0.1000 |
$2.00 |
$0.0100 |
$10.00 |
| 8 | 351-7007 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,853 | SY |
$92.00 |
$90.00 |
$100.00 |
$89.00 |
$90.00 |
| 9 | 354-7002 |
PLANE & TEXT ASPH CONC PAV(0" TO 2") | 18,508 | SY |
$3.25 |
$2.00 |
$3.25 |
$2.55 |
$10.00 |
| 10 | 500-7001 |
MOBILIZATION | 1 | LS |
$83,429.00 |
$30,000.00 |
$65,000.00 |
$86,694.00 |
$120,000.00 |
| 11 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 | MO |
$20,000.00 |
$15,000.00 |
$16,000.00 |
$38,000.00 |
$15,000.00 |
| 12 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 3 | EA |
$16,500.00 |
$5,000.00 |
$5,000.00 |
$4,400.00 |
$12,500.00 |
| 13 | 505-7001 |
TMA (STATIONARY) | 40 | DAY |
$250.00 |
$1.00 |
$150.00 |
$1,100.00 |
$250.00 |
| 14 | 505-7003 |
TMA (MOBILE OPERATION) | 10 | DAY |
$550.00 |
$1.00 |
$250.00 |
$1.00 |
$550.00 |
| 15 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 420 | LF |
$6.00 |
$1.00 |
$7.50 |
$7.00 |
$18.00 |
| 16 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 420 | LF |
$1.50 |
$0.5000 |
$3.25 |
$2.15 |
$9.00 |
| 17 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 4 | EA |
$750.00 |
$665.00 |
$775.00 |
$730.00 |
$1,500.00 |
| 18 | 644-7004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 11 | EA |
$810.00 |
$815.00 |
$900.00 |
$875.00 |
$150.00 |
| 19 | 644-7012 |
IN SM RD SN SUP&AM TY10BWG(1)SB(T) | 1 | EA |
$850.00 |
$908.00 |
$975.00 |
$975.00 |
$1,500.00 |
| 20 | 644-7042 |
IN SM RD SN SUP&AM TYS80(1)SB(U) | 1 | EA |
$1,200.00 |
$1,130.00 |
$1,000.00 |
$1,225.00 |
$1,500.00 |
| 21 | 658-7003 |
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND | 5 | EA |
$75.00 |
$106.00 |
$110.00 |
$116.00 |
$100.00 |
| 22 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 381 | EA |
$2.00 |
$5.00 |
$3.50 |
$1.25 |
$6.00 |
| 23 | 666-7018 |
REFL PAV MRK TY I (W)8"(DOT)(100MIL) | 224 | LF |
$3.00 |
$2.00 |
$2.40 |
$2.15 |
$5.00 |
| 24 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 2,195 | LF |
$3.00 |
$1.10 |
$1.20 |
$1.18 |
$5.00 |
| 25 | 666-7030 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 180 | LF |
$5.00 |
$3.00 |
$5.00 |
$3.23 |
$15.00 |
| 26 | 666-7036 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 623 | LF |
$10.00 |
$7.00 |
$9.00 |
$7.80 |
$20.00 |
| 27 | 666-7042 |
REFL PAV MRK TY I (W)(ARROW)(100MIL) | 8 | EA |
$250.00 |
$170.00 |
$215.00 |
$183.00 |
$250.00 |
| 28 | 666-7066 |
REFL PAV MRK TY I (W)(WORD)(100MIL) | 8 | EA |
$250.00 |
$10.00 |
$275.00 |
$193.00 |
$250.00 |
| 29 | 666-7090 |
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) | 10 | EA |
$100.00 |
$45.00 |
$75.00 |
$48.00 |
$150.00 |
| 30 | 666-7352 |
PAVEMENT SLER 24" | 114 | LF |
$1.00 |
$1.00 |
$1.90 |
$1.00 |
$20.00 |
| 31 | 666-7408 |
REFL PAV MRK TY I (W)6"(BRK)(100MIL) | 414 | LF |
$1.50 |
$1.00 |
$1.05 |
$1.00 |
$5.00 |
| 32 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 3,737 | LF |
$1.20 |
$0.9200 |
$0.8500 |
$1.00 |
$4.00 |
| 33 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 4,172 | LF |
$1.50 |
$0.9200 |
$0.8500 |
$1.00 |
$4.00 |
| 34 | 672-7006 |
REFL PAV MRKR TY II-C-R | 131 | EA |
$7.00 |
$5.00 |
$6.50 |
$5.40 |
$6.00 |
| 35 | 677-7006 |
ELIM EXT PM & MRKS (12") | 200 | LF |
$2.00 |
$2.00 |
$4.35 |
$2.15 |
$6.00 |
| 36 | 678-7008 |
PAV SURF PREP FOR MRK (24") | 114 | LF |
$1.75 |
$0.7500 |
$0.6500 |
$0.8000 |
$20.00 |
| 37 | 730-7019 |
FULL - WIDTH MOWING | 1 | CYC |
$5,000.00 |
$500.00 |
$4,500.00 |
$2,650.00 |
$5,000.00 |