| 1 | 132-6021 |
EMBANKMENT (VEHICLE)(ORD COMP)(TY C) | 460 | CY |
$35.00 |
$75.00 |
$50.60 |
$107.00 |
|
| 2 | 134-6001 |
BACKFILL (TY A) | 356.56 | STA |
$200.00 |
$285.00 |
$115.00 |
$364.00 |
|
| 3 | 134-6002 |
BACKFILL (TY B) | 19.01 | STA |
$175.00 |
$955.00 |
$161.00 |
$748.00 |
|
| 4 | 316-6249 |
AGGR(TY-PE GR-4 SAC-B) | 574 | CY |
$140.00 |
$190.00 |
$131.10 |
$200.50 |
|
| 5 | 316-6400 |
ASPH (AC-15P OR AC-10-2TR OR CRS-2P) | 25,271 | GAL |
$4.75 |
$3.65 |
$4.97 |
$3.25 |
|
| 6 | 351-6006 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") | 1,600 | SY |
$71.50 |
$80.00 |
$100.37 |
$104.75 |
|
| 7 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 70,876 | SY |
$2.00 |
$2.50 |
$2.13 |
$5.10 |
|
| 8 | 354-6029 |
PLANE ASPH CONC PAV(0" TO 6") | 3,143 | SY |
$3.50 |
$7.30 |
$7.08 |
$10.00 |
|
| 9 | 361-6045 |
FULL - DEPTH REPAIR CPJR (10") | 700 | SY |
$330.00 |
$485.00 |
$247.95 |
$134.00 |
|
| 10 | 438-6001 |
CLEANING AND SEALING EXISTING JOINTS | 720 | LF |
$35.00 |
$19.50 |
$21.06 |
$33.50 |
|
| 11 | 451-6024 |
RETROFIT RAIL (TY SSTR) | 455.74 | LF |
$170.00 |
$300.00 |
$323.95 |
$234.00 |
|
| 12 | 500-6001 |
MOBILIZATION | 1 | LS |
$500,000.00 |
$245,000.00 |
$513,459.32 |
$246,000.00 |
|
| 13 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$3,000.00 |
$22,000.00 |
$4,148.23 |
$859.00 |
|
| 14 | 512-6013 |
PORT CTB (DES SOURCE)(SGL SLP)(TY 1) | 450 | LF |
$15.00 |
$13.00 |
$43.41 |
$23.00 |
|
| 15 | 512-6025 |
PORT CTB (MOVE)(SGL SLP)(TY 1) | 330 | LF |
$25.00 |
$14.00 |
$44.07 |
$25.00 |
|
| 16 | 512-6049 |
PORT CTB (REMOVE)(SGL SLP)(TY 1) | 450 | LF |
$15.00 |
$13.00 |
$32.54 |
$23.00 |
|
| 17 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 65,286 | LF |
$0.5000 |
$0.5000 |
$0.1200 |
$0.0600 |
|
| 18 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 32,643 | LF |
$0.5000 |
$0.5500 |
$0.1200 |
$0.0900 |
|
| 19 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 225 | LF |
$28.00 |
$25.81 |
$32.07 |
$26.30 |
|
| 20 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,250.00 |
$3,598.62 |
$2,327.11 |
$2,050.00 |
|
| 21 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 1 | EA |
$1,600.00 |
$1,369.61 |
$1,614.40 |
$1,395.00 |
|
| 22 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 400 | LF |
$2.00 |
$3.16 |
$3.24 |
$3.25 |
|
| 23 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 14 | EA |
$225.00 |
$189.64 |
$215.97 |
$193.00 |
|
| 24 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 13 | EA |
$3,350.00 |
$3,160.65 |
$3,644.54 |
$3,200.00 |
|
| 25 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 2 | EA |
$1,200.00 |
$1,474.97 |
$944.88 |
$1,500.00 |
|
| 26 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$850.00 |
$716.42 |
$809.90 |
$730.00 |
|
| 27 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 2 | EA |
$9,000.00 |
$9,007.85 |
$9,168.05 |
$9,175.00 |
|
| 28 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 20 | EA |
$25.00 |
$21.00 |
$53.99 |
$22.50 |
|
| 29 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 18 | EA |
$33.50 |
$40.00 |
$53.99 |
$43.00 |
|
| 30 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 3,250 | EA |
$1.25 |
$1.00 |
$1.77 |
$0.8000 |
|
| 31 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 8,058 | EA |
$1.25 |
$1.00 |
$1.77 |
$0.8000 |
|
| 32 | 666-6035 |
REFL PAV MRK TY I (W)8"(SLD)(090MIL) | 1,019 | LF |
$1.25 |
$1.35 |
$1.40 |
$2.15 |
|
| 33 | 668-6075 |
PREFAB PAV MRK TY C (W) (18") (SLD) | 155 | LF |
$8.70 |
$11.18 |
$11.61 |
$10.75 |
|
| 34 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 718 | LF |
$20.00 |
$12.90 |
$13.39 |
$13.45 |
|
| 35 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 41 | EA |
$300.00 |
$249.62 |
$259.17 |
$242.00 |
|
| 36 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 10 | EA |
$290.00 |
$348.43 |
$361.75 |
$295.00 |
|
| 37 | 668-6089 |
PREFAB PAV MRK TY C (W) (RR XING) | 1 | EA |
$700.00 |
$847.66 |
$880.09 |
$965.00 |
|
| 38 | 668-6106 |
PREFAB PAV MRK TY C (Y) (12") (SLD) | 731 | LF |
$10.00 |
$6.24 |
$6.48 |
$7.00 |
|
| 39 | 672-6007 |
REFL PAV MRKR TY I-C | 202 | EA |
$4.00 |
$6.50 |
$6.75 |
$6.15 |
|
| 40 | 672-6009 |
REFL PAV MRKR TY II-A-A | 1,388 | EA |
$5.00 |
$6.50 |
$6.75 |
$6.15 |
|
| 41 | 3076-6042 |
D-GR HMA TY-D SAC-B PG70-22 | 29,860 | TON |
$118.00 |
$117.00 |
$123.00 |
$136.25 |
|
| 42 | 3076-6043 |
D-GR HMA TY-D PG70-22 (LEVEL-UP) | 1,179 | TON |
$150.00 |
$132.00 |
$120.80 |
$184.50 |
|
| 43 | 3076-6066 |
TACK COAT | 21,977 | GAL |
$4.50 |
$2.20 |
$4.09 |
$3.00 |
|
| 44 | 6185-6002 |
TMA (STATIONARY) | 40 | DAY |
$300.00 |
$275.00 |
$377.95 |
$178.00 |
|
| 45 | 6185-6005 |
TMA (MOBILE OPERATION) | 20 | DAY |
$300.00 |
$650.00 |
$539.93 |
$594.00 |
|
| 46 | 6439-6006 |
HPPM-RIB W/RET REQ TYI(W)6"(BRK)100MIL | 3,005 | LF |
$0.8500 |
$0.8800 |
$0.9200 |
$0.9100 |
|
| 47 | 6439-6008 |
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL | 94,382 | LF |
$0.8500 |
$0.8600 |
$0.9000 |
$0.8600 |
|
| 48 | 6439-6014 |
HPPM-RIB W/RET REQ TYI(Y)6"(BRK)100MIL | 13,152 | LF |
$0.8500 |
$0.8800 |
$0.9200 |
$0.9100 |
|
| 49 | 6439-6016 |
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL | 34,847 | LF |
$0.8500 |
$0.8900 |
$0.8900 |
$0.8600 |
|