| 1 | 110-6001 |
EXCAVATION (ROADWAY) | 150 | CY |
$55.00 |
$70.00 |
$100.00 |
$65.00 |
| 2 | 132-6004 |
EMBANKMENT (FINAL)(DENS CONT)(TY B) | 350 | CY |
$50.00 |
$95.00 |
$50.00 |
$83.00 |
| 3 | 134-6002 |
BACKFILL (TY B) | 1,411.62 | STA |
$300.00 |
$175.00 |
$130.00 |
$265.00 |
| 4 | 164-6023 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 5,716 | SY |
$1.75 |
$0.5000 |
$0.4300 |
$0.5500 |
| 5 | 168-6001 |
VEGETATIVE WATERING | 2,000.4 | MG |
$55.00 |
$45.00 |
$1.00 |
$1.00 |
| 6 | 180-6001 |
WILDFLOWER SEEDING | 1.17 | AC |
$2,500.00 |
$3,500.00 |
$3,000.00 |
$3,650.00 |
| 7 | 351-6010 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16") | 2,500 | SY |
$160.00 |
$115.00 |
$160.00 |
$148.00 |
| 8 | 354-6003 |
PLAN & TEXT ASPH CONC PAV(0" TO 3") | 190,937 | SY |
$5.00 |
$2.50 |
$2.25 |
$3.00 |
| 9 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 1,131 | CY |
$700.00 |
$700.00 |
$530.00 |
$675.00 |
| 10 | 438-6005 |
CLEANING AND SEALING JOINTS | 2,855 | LF |
$45.00 |
$85.00 |
$25.00 |
$72.00 |
| 11 | 454-6008 |
HEADER TYPE EXPANSION JOINT | 239 | CF |
$700.00 |
$600.00 |
$700.00 |
$555.00 |
| 12 | 500-6001 |
MOBILIZATION | 1 | LS |
$1,784,928.78 |
$1,500,000.00 |
$2,000,000.00 |
$1,789,817.00 |
| 13 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 13 | MO |
$20,000.00 |
$10,000.00 |
$50,000.00 |
$58,000.00 |
| 14 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 12,703 | LF |
$5.00 |
$3.40 |
$1.00 |
$3.65 |
| 15 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 12,703 | LF |
$2.00 |
$1.00 |
$0.5000 |
$1.10 |
| 16 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 160 | LF |
$7.50 |
$6.00 |
$6.00 |
$8.00 |
| 17 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 160 | LF |
$2.50 |
$3.00 |
$3.00 |
$3.75 |
| 18 | 512-6001 |
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 1,360 | LF |
$80.00 |
$125.00 |
$75.00 |
$75.00 |
| 19 | 512-6025 |
PORT CTB (MOVE)(SGL SLP)(TY 1) | 510 | LF |
$25.00 |
$23.00 |
$30.00 |
$28.00 |
| 20 | 512-6049 |
PORT CTB (REMOVE)(SGL SLP)(TY 1) | 1,360 | LF |
$25.00 |
$28.00 |
$30.00 |
$32.00 |
| 21 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 182,786 | LF |
$0.5000 |
$0.2000 |
$0.2000 |
$0.1400 |
| 22 | 533-6005 |
RUMBLE STRIPS (SHOULDER) CONCRETE | 64,508 | LF |
$2.00 |
$0.5000 |
$0.5000 |
$0.8000 |
| 23 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 16,275 | LF |
$25.00 |
$25.00 |
$22.00 |
$25.00 |
| 24 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 68 | EA |
$2,500.00 |
$2,100.00 |
$1,800.00 |
$2,200.00 |
| 25 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 38 | EA |
$5,000.00 |
$1,275.00 |
$1,100.00 |
$1,250.00 |
| 26 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 15,800 | LF |
$5.00 |
$3.50 |
$3.00 |
$3.30 |
| 27 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 22 | EA |
$400.00 |
$145.00 |
$125.00 |
$140.00 |
| 28 | 542-6003 |
REMOVE DOWNSTREAM ANCHOR TERMINAL | 15 | EA |
$500.00 |
$145.00 |
$125.00 |
$140.00 |
| 29 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 68 | EA |
$410.00 |
$275.00 |
$250.00 |
$280.00 |
| 30 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 57 | EA |
$3,450.00 |
$3,325.00 |
$2,852.00 |
$3,275.00 |
| 31 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 57 | EA |
$450.00 |
$275.00 |
$250.00 |
$280.00 |
| 32 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 1 | EA |
$7,000.00 |
$3,500.00 |
$2,000.00 |
$2,250.00 |
| 33 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 1 | EA |
$5,500.00 |
$3,000.00 |
$1,500.00 |
$1,780.00 |
| 34 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
$15,000.00 |
$20,000.00 |
$10,000.00 |
$11,000.00 |
| 35 | 658-6013 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB | 96 | EA |
$40.00 |
$20.00 |
$20.00 |
$22.00 |
| 36 | 658-6026 |
INSTL DEL ASSM (D-SY)SZ (BRF)CTB | 112 | EA |
$40.00 |
$20.00 |
$20.00 |
$22.00 |
| 37 | 658-6061 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 252 | EA |
$40.00 |
$38.00 |
$38.00 |
$42.00 |
| 38 | 658-6064 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 172 | EA |
$60.00 |
$38.00 |
$38.00 |
$42.00 |
| 39 | 658-6071 |
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI) | 38 | EA |
$40.00 |
$20.00 |
$20.00 |
$22.00 |
| 40 | 658-6080 |
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND | 232 | EA |
$100.00 |
$70.00 |
$70.00 |
$77.00 |
| 41 | 658-6099 |
INSTL OM ASSM (OM-2Z)(WFLX)GND | 31 | EA |
$10.00 |
$74.00 |
$74.00 |
$82.00 |
| 42 | 658-6102 |
INSTL OM ASSM (OM-3L)(WFLX)SRF)SRF | 37 | EA |
$370.00 |
$400.00 |
$400.00 |
$450.00 |
| 43 | 658-6104 |
INSTL OM ASSM (OM-3R)(WFLX)SRF)SRF | 37 | EA |
$500.00 |
$400.00 |
$400.00 |
$450.00 |
| 44 | 662-6005 |
WK ZN PAV MRK NON-REMOV (W)6"(BRK) | 35,417 | LF |
$0.5000 |
$0.4500 |
$0.1600 |
$0.4700 |
| 45 | 662-6008 |
WK ZN PAV MRK NON-REMOV (W)6"(SLD) | 155,339 | LF |
$0.5000 |
$0.3000 |
$0.1600 |
$0.3100 |
| 46 | 662-6037 |
WK ZN PAV MRK NON-REMOV (Y)6"(SLD) | 142,699 | LF |
$0.5000 |
$0.3000 |
$0.1600 |
$0.3100 |
| 47 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 8,855 | EA |
$3.00 |
$1.00 |
$1.00 |
$1.45 |
| 48 | 666-6018 |
REFL PAV MRK TY I (W)6"(DOT)(100MIL) | 652 | LF |
$3.00 |
$1.50 |
$1.00 |
$1.58 |
| 49 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 15,998 | LF |
$2.00 |
$1.00 |
$1.10 |
$1.06 |
| 50 | 666-6042 |
REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 5,979 | LF |
$5.00 |
$4.35 |
$2.45 |
$4.60 |
| 51 | 666-6075 |
REFL PAV MRK TY I (W)(NUMBER)(100MIL) | 12 | EA |
$355.00 |
$175.00 |
$145.00 |
$184.00 |
| 52 | 666-6162 |
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL) | 9,691 | LF |
$3.00 |
$0.7500 |
$0.9000 |
$0.7900 |
| 53 | 666-6225 |
PAVEMENT SEALER 6" | 95,047 | LF |
$0.8200 |
$0.2500 |
$0.2300 |
$0.2700 |
| 54 | 666-6226 |
PAVEMENT SEALER 8" | 8,875 | LF |
$2.00 |
$0.4500 |
$0.2500 |
$0.4800 |
| 55 | 666-6228 |
PAVEMENT SEALER 12" | 2,924 | LF |
$2.00 |
$1.00 |
$0.9700 |
$1.05 |
| 56 | 666-6248 |
PAVEMENT SEALER (NUMBER) | 4 | EA |
$45.00 |
$65.00 |
$31.00 |
$68.55 |
| 57 | 666-6306 |
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) | 35,392 | LF |
$1.15 |
$0.6500 |
$0.8300 |
$0.6900 |
| 58 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 142,705 | LF |
$1.00 |
$0.6000 |
$0.8300 |
$0.6300 |
| 59 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 145,353 | LF |
$1.00 |
$0.6000 |
$0.8300 |
$0.6300 |
| 60 | 666-6350 |
REFL PAV MRK TY I (W)12"(DOT)(100MIL) | 24 | LF |
$15.00 |
$5.00 |
$4.00 |
$5.27 |
| 61 | 672-6010 |
REFL PAV MRKR TY II-C-R | 2,627 | EA |
$10.00 |
$4.75 |
$4.00 |
$5.00 |
| 62 | 678-6002 |
PAV SURF PREP FOR MRK (6") | 95,047 | LF |
$0.5000 |
$0.1700 |
$0.1000 |
$0.1800 |
| 63 | 678-6004 |
PAV SURF PREP FOR MRK (8") | 8,875 | LF |
$0.5000 |
$0.3500 |
$0.1500 |
$0.3700 |
| 64 | 678-6006 |
PAV SURF PREP FOR MRK (12") | 2,924 | LF |
$0.7500 |
$0.9500 |
$0.1500 |
$1.00 |
| 65 | 678-6015 |
PAV SURF PREP FOR MRK (NUMBER) | 4 | EA |
$20.00 |
$50.00 |
$9.00 |
$53.00 |
| 66 | 721-6002 |
FIBER REINFORCED POLYMER PATCHING MATLS | 65,750 | LB |
$5.00 |
$4.75 |
$5.60 |
$5.40 |
| 67 | 3002-6001 |
MEMBRANE UNDERSEAL | 91,541 | GAL |
$5.00 |
$3.75 |
$3.75 |
$4.07 |
| 68 | 3080-6008 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-28 | 70,112 | TON |
$160.00 |
$172.50 |
$195.00 |
$188.00 |
| 69 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
$2,500.00 |
$20,000.00 |
$10,000.00 |
$13,000.00 |
| 70 | 6185-6002 |
TMA (STATIONARY) | 570 | DAY |
$200.00 |
$300.00 |
$1.00 |
$315.00 |
| 71 | 6185-6003 |
TMA (MOBILE OPERATION) | 5,312 | HR |
$40.00 |
$0.0100 |
$1.00 |
$0.0100 |