Filtered by: Work type: Bridge Replacement Clear all
| Let date | CCSJ | County / District | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Nov 3, 2026 estimated | 0212-03-058 | BrazosBryan | SH 30 | Bridge Replacement 0.30 Mi. West of William D. Fitch to 0.66 Mi East of William D. Fitch | $10,451,995 | Planned | FLUOR ENTERPRISES, INC. $30,209,876 · +189.0% | |
| Nov 3, 2026 estimated | 0212-03-059 | BrazosBryan | SH 30 | Bridge Replacement 0.66 Mi East of William D. Fitch to 1.61 Mi. East of William D. Fitch | $11,162,673 | Planned | ||
| Nov 3, 2026 estimated | 0212-04-041 | GrimesBryan | SH 30 | Bridge Replacement 1.61 Mi. East of William D. Fitch to 2.59 Mi. East of William D. Fitch | $10,117,449 | Planned | ||
| Nov 3, 2026 estimated | 0915-45-060 | MedinaSan Antonio | CR 16305723 | Bridge Replacement At Medina River to . | $520,000 | Planned | ||
| Nov 3, 2026 estimated | 0917-30-068 | BurlesonBryan | CR 2600344 | Bridge Replacement ON CR 244 (FCR 344) to AT DEEP CREEK | $712,231 | Planned | C & W SOUTHERN LLC $721,844 · +1.3% | |
| Nov 3, 2026 estimated | 0922-23-012 | DuvalLaredo | CS 1097258 | Bridge Replacement WHITE AVE to . | $480,603 | Planned | ||
| Nov 3, 2026 estimated | 0922-33-234 | WebbLaredo | CR 24000123 | Bridge Replacement MANGANA HEIN RD to . | $1,024,573 | Planned | STX CIVIL $2,866,785 · +179.8% | |
| Nov 3, 2026 estimated | 0922-33-235 | WebbLaredo | CR 24000123 | Bridge Replacement MANGANA HEIN RD to . | $1,057,482 | Planned | ||
| Nov 20, 2026 estimated | 0909-22-224 | McLennanWaco | CR 16102070 | Bridge Replacement @ Middle Bosque Bridge to @ Middle Bosque Bridge | $17,000,000 | Planned | ||
| Dec 1, 2026 | 0366-01-084 BR 2027(195) | HaysAustin | SH 123 | Bridge Replacement at Big Cottonwood Creek to . | $2,818,47297 items | Official | ||
| Dec 1, 2026 | 0911-28-062 BR 2B23(182) | HoustonLufkin | COUNTY ROAD 2065 | Bridge Replacement AT HURRICANE BAYOU to . | $1,597,56289 items | Official | ||
| Dec 1, 2026 | 0916-27-016 BR 2B24(332) | RefugioCorpus Christi | MULLENS BAYOU RD | Bridge Replacement AA00-42 Mullens Bayou to 0.27 MI N of FM 1360 | $882,21248 items | Official | ||
| Dec 1, 2026 | 0916-36-024 BR 2B24(432) | KarnesCorpus Christi | COUNTY ROAD 326 | Bridge Replacement 0.59 MI W of CR 333 to 0.655 MI W of CR 333 | $3,101,27452 items | Official | ||
| Dec 1, 2026 | 0918-47-460 BR 2B24(420) | DallasDallas | W PLEASANT RUN RDWESTMORELAND | Bridge Replacement Pleasant Run Rd at Ten Mile Creek to . | $8,607,909195 items | Official | ||
| Jan 6, 2027 | 0922-33-217 BR 2B24(260) | WebbLaredo | LOWRY LN | Bridge Replacement LOWRY LN AT DRAINAGE DITCH to . | $766,97157 items | Unofficial | ||
| Feb 2, 2027 estimated | 0066-05-071 | MooreAmarillo | US 87 | Bridge Replacement 6.7 Mi N of SH 354 to . | $4,240,000 | Planned | ||
| Feb 2, 2027 estimated | 0066-05-072 | MooreAmarillo | US 87 | Bridge Replacement 6.7 Mi N of SH 354 to . | $4,150,000 | Planned | ||
| Feb 2, 2027 estimated | 0066-05-076 | MooreAmarillo | US 87 | Bridge Replacement 7.0 Mi N of SH 354 to . | $3,090,000 | Planned | ||
| Feb 2, 2027 estimated | 0066-05-077 | MooreAmarillo | US 87 | Bridge Replacement 7.0 Mi N of SH 354 to . | $3,150,000 | Planned | ||
| Feb 2, 2027 estimated | 0337-05-043 | MilamBryan | FM 486 | Bridge Replacement AT LITTLE RIVER to . | $3,402,605 | Planned | ||
| Feb 2, 2027 estimated | 0743-02-030 | ShelbyLufkin | FM 138 | Bridge Replacement At Shafner Creek to . | $932,903 | Planned | ||
| Feb 2, 2027 estimated | 0903-15-110 | CookeWichita Falls | CR 4900304 | Bridge Replacement CR 165 (Signed Bonner Rd) to at Draw | $696,000 | Planned | ||
| Feb 2, 2027 estimated | 0903-15-111 | CookeWichita Falls | CR 4900215 | Bridge Replacement CR 365/Signed CR 215 to at Indian Creek | $723,000 | Planned | ||
| Feb 2, 2027 estimated | 0903-15-112 | CookeWichita Falls | CR 4900281 | Bridge Replacement CR 427/Sign CR 281 to at Indian Creek | $736,000 | Planned | ||
| Feb 2, 2027 estimated | 0903-15-114 | CookeWichita Falls | CR 4900150 | Bridge Replacement CR 420/Signed CR 150 to at Draw | $604,500 | Planned | ||
| Feb 2, 2027 estimated | 0912-34-203 | Fort BendHouston | CR 270 | Bridge Replacement Needville Rd (CR 270) at Cedar Creek to . | $1,386,300 | Planned | ||
| Feb 2, 2027 estimated | 0912-34-204 | Fort BendHouston | CR 8000267 | Bridge Replacement Pleasant Rd (CR 267) at Cedar Creek to . | $795,539 | Planned | ||
| Feb 2, 2027 estimated | 0912-34-208 | Fort BendHouston | CR 8000266 | Bridge Replacement Hubenak Rd (CR 266) at Buffalo Creek to . | $939,577 | Planned | ||
| Feb 2, 2027 estimated | 0912-34-214 | Fort BendHouston | CR 8000117 | Bridge Replacement Zamanek Rd (CR 117) at Deer Creek to . | $1,057,415 | Planned | ||
| Feb 2, 2027 estimated | 0913-27-080 | VictoriaYoakum | CR 23500136 | Bridge Replacement AT DRY CREEK to STR # AA01-09-002 (COLETOVILLE RD) | $578,604 | Planned | ||
| Feb 2, 2027 estimated | 0913-27-088 | VictoriaYoakum | CR 23500222 | Bridge Replacement OLD HIGHWAY ROAD AT DRAW to STR# AA02-41-003 | $1,045,797 | Planned | ||
| Feb 2, 2027 estimated | 0918-22-163 | EllisDallas | CS 268701 | Bridge Replacement HAMPTON RD AT LITTLE CREEK to . | $1,288,081 | Planned | ||
| Feb 2, 2027 estimated | 1172-02-014 | Van ZandtTyler | FM 858 | Bridge Replacement FM 858 to AT KICKAPOO CRK TRIB | $850,000 | Planned | ||
| Feb 2, 2027 estimated | 1251-04-008 | FisherAbilene | FM 1085 | Bridge Replacement FM 1085 to Plum Creek | $1,154,692 | Planned | ||
| Feb 2, 2027 estimated | 1663-02-013 | NavarroDallas | FM 744 | Bridge Replacement Richland Creek Bridge to . | $2,592,290 | Planned | ||
| Feb 2, 2027 estimated | 1663-03-021 | NavarroDallas | FM 744 | Bridge Replacement At Rush Creek to . | $3,912,157 | Planned | ||
| Feb 2, 2027 estimated | 2120-01-029 | JasperBeaumont | FM 2246 | Bridge Replacement FM 2246 at Dognash Gully to STR 201220212001006 | $2,256,206 | Planned | ||
| Mar 3, 2027 estimated | 0180-01-086 | CalhounYoakum | SH 35 | Bridge Replacement AT VICTORIA BARGE CANAL to STR# 0180-01-034 | $37,124,335 | Planned | ||
| Mar 3, 2027 estimated | 0702-04-011 | HardemanChildress | FM 91 | Bridge Replacement @ Draw to . | $318,240 | Planned | ||
| Mar 3, 2027 estimated | 0797-07-033 | CollingsworthChildress | FM 1036 | Bridge Replacement FM 1036 @ Dozier Creek to . | $1,650,000 | Planned | ||
| Mar 3, 2027 estimated | 0807-03-040 | FayetteYoakum | FM 153 | Bridge Replacement AT LITTLE PIN OAK CREEK to STR# 0807-03-009 | $3,251,000 | Planned | ||
| Mar 3, 2027 estimated | 0913-28-105 | FayetteYoakum | CR 7600293 | Bridge Replacement @ Cedar Branch to STR# AA01-41-002 (E Radhost School) | $775,000 | Planned | ||
| Mar 3, 2027 estimated | 2398-01-063 | TaylorAbilene | SL 322 | Bridge Replacement AT to MAPLE ST | $8,789,358 | Planned | ||
| Mar 3, 2027 estimated | 2632-01-010 | WheelerChildress | FM 2697 | Bridge Replacement FM 2697 @ Salt Creek to . | $1,500,000 | Planned | ||
| Apr 6, 2027 estimated | 0902-40-031 | JackFort Worth | CR 12000307 | Bridge Replacement SLUSHER RD AT W OF BEANS CREEK to EAST OF BEANS CREEK | $890,684 | Planned | ||
| Apr 6, 2027 estimated | 0911-08-066 | NacogdochesLufkin | CR 17400620 | Bridge Replacement CR 620 to At Morral Bayou. | $735,759 | Planned | ||
| Apr 6, 2027 estimated | 0911-08-069 | NacogdochesLufkin | CR 17400724 | Bridge Replacement CR 724 to At Bernaldo Creek. | $640,733 | Planned | ||
| Apr 6, 2027 estimated | 0911-08-070 | NacogdochesLufkin | CR 17400841 | Bridge Replacement CR 841 to At Little Bayou Loco - HBP | $803,434 | Planned | ||
| Apr 6, 2027 estimated | 0911-08-071 | NacogdochesLufkin | CR 17400841 | Bridge Replacement CR 841 to At Trib of Little Bayou. | $646,603 | Planned | ||
| Apr 6, 2027 estimated | 0911-08-073 | NacogdochesLufkin | CR 17400836 | Bridge Replacement CR 836 to At Little Bayou Loco. | $791,528 | Planned | ||
| Apr 6, 2027 estimated | 1159-01-030 | EllisDallas | FM 875 | Bridge Replacement At South Prong Creek to . | $4,418,419 | Planned | ||
| Apr 6, 2027 estimated | 1179-03-012 | ParkerFort Worth | FM 2552 | Bridge Replacement @ Black Warrior Branch to . | $4,958,677 | Planned | ||
| Apr 6, 2027 estimated | 1191-02-003 | LimestoneWaco | FM 936 | Bridge Replacement @ Tributary of Navasota River to @ Tributary of Navasota River | $1,119,969 | Planned | ||
| Apr 6, 2027 estimated | 1374-01-014 | HillWaco | FM 1243 | Bridge Replacement @ Cottonwood Creek to STR #002 | $325,000 | Planned | ||
| Apr 6, 2027 estimated | 1374-01-015 | HillWaco | FM 1243 | Bridge Replacement @ Branch of Cottonwood Creek to STR# 003 | $325,000 | Planned | ||
| Apr 6, 2027 estimated | 1755-01-025 | WilliamsonAustin | RM 1869 | Bridge Replacement Widen Road - Add Shoulders at South San Gabriel River to . | $2,304,000 | Planned | ||
| May 5, 2027 estimated | 0064-04-044 | San AugustineLufkin | FM 1 | Bridge Replacement AT TIGER CREEK to . | $1,722,725 | Planned | ||
| May 5, 2027 estimated | 0064-05-066 | SabineLufkin | FM 1 | Bridge Replacement At Donahue Creek to . | $1,673,438 | Planned | ||
| May 5, 2027 estimated | 0756-05-022 | San JacintoLufkin | FM 945 | Bridge Replacement E Fork San Jacinto River Relief to . | $3,220,000 | Planned | ||
| May 5, 2027 estimated | 0902-20-233 | WiseFort Worth | CR 24903736 | Bridge Replacement OVER WILLOW CREEK to . | $1,201,881 | Planned | ||
| May 5, 2027 estimated | 0908-20-028 | NolanAbilene | CR 17700181 | Bridge Replacement AT ROBERTSON CREEK to . | $510,000 | Planned | ||
| May 5, 2027 estimated | 0908-21-040 | MitchellAbilene | CR 16800121 | Bridge Replacement AT JAYHAWK CREEK to . | $527,000 | Planned | ||
| May 5, 2027 estimated | 0912-34-212 | Fort BendHouston | CR 8003226 | Bridge Replacement Hunt Rd (CR 3226) at Brookshire Creek to . | $1,528,353 | Planned | ||
| May 5, 2027 estimated | 0912-37-247 | MontgomeryHouston | CR 17002177 | Bridge Replacement Stinson Lane at Mound Creek Draw to . | $671,880 | Planned | ||
| May 5, 2027 estimated | 0914-21-033 | LeeAustin | CR 208 | Bridge Replacement at Rabbs Creek to . | $700,000 | Planned | ||
| May 5, 2027 estimated | 0914-22-079 | CaldwellAustin | CS 258303 | Bridge Replacement On N. Blanco Street at Town Creek to STR # 14-028-0-B000-50-001 | $800,000 | Planned | ||
| May 5, 2027 estimated | 0917-16-039 | LeonBryan | CR 14500419 | Bridge Replacement ON CR 419 (AA0419, F-CR 301) to AT BOGGY CREEK | $520,000 | Planned | ||
| May 5, 2027 estimated | 0917-19-055 | WashingtonBryan | CR 23900550 | Bridge Replacement ON CR 550 (LOCAL- DIERKING RD, F-CR 392) to AT DRAW (WILLIAMS CREEK) | $650,000 | Planned | ||
| May 5, 2027 estimated | 0917-19-056 | WashingtonBryan | CS 1031948 | Bridge Replacement ON PECAN ST (LD1213) to AT HOG BRANCH | $650,000 | Planned | ||
| May 5, 2027 estimated | 0917-19-057 | WashingtonBryan | CR 23900169 | Bridge Replacement ON CR 169 (LOCAL-MACHEMEHL RD, F-CR 255) to AT THOMAS CREEK | $700,000 | Planned | ||
| May 5, 2027 estimated | 0917-19-058 | WashingtonBryan | CR 23900120 | Bridge Replacement ON CR 120 (LOCAL - BOSSE RD, F-CR 293) to AT DOE RUN CREEK | $650,000 | Planned | ||
| May 5, 2027 estimated | 0923-25-024 | San SabaBrownwood | CR 20600600 | Bridge Replacement CR 208 AT SAN SABA RIVER to . | $1,700,000 | Planned | ||
| May 5, 2027 estimated | 3041-03-013 | HarrisonAtlanta | FM 3001 | Bridge Replacement At Little Cypress Bayou to . | $2,824,800 | Planned | ||
| Jun 1, 2027 estimated | 0075-01-025 | BrewsterEl Paso | US 67 | Bridge Replacement INTERSECTION OF US 67/US 90 to 1.54 MI NE OF US 90 | $4,720,383 | Planned | ||
| Jun 1, 2027 estimated | 0314-01-084 | ParkerFort Worth | IH 20 | Bridge Replacement @ BRAZOS RIVER to . | $14,084,845 | Planned | ||
| Jun 1, 2027 estimated | 0911-04-106 | PolkLufkin | CR 18701227 | Bridge Replacement At Menard Creek to . | $993,861 | Planned | ||
| Jun 1, 2027 estimated | 0911-28-084 | HoustonLufkin | CR 11403495 | Bridge Replacement At Trib of Gardner Creek to . | $948,629 | Planned | ||
| Jun 1, 2027 estimated | 0925-07-031 | HardemanChildress | CR 10000231 | Bridge Replacement @ Draw to . | $612,000 | Planned | ||
| Jun 1, 2027 estimated | 0925-07-032 | HardemanChildress | CR 10000286 | Bridge Replacement @ Draw to . | $306,000 | Planned | ||
| Jun 1, 2027 estimated | 0925-11-015 | WheelerChildress | CR 24200253 | Bridge Replacement @ E Branch Bronco Creek to . | $816,000 | Planned | ||
| Jul 1, 2027 estimated | 0496-04-036 | KnoxChildress | SH 222 | Bridge Replacement @ Brazos River to . | $8,200,000 | Planned | ||
| Jul 1, 2027 estimated | 0909-37-081 | HillWaco | CR 11003323 | Bridge Replacement @ Ash Creek Branch #164 to @ Ash Creek Branch #164 | $552,000 | Planned | ||
| Jul 1, 2027 estimated | 0912-31-331 | BrazoriaHouston | CR 668 | Bridge Replacement Dawson Rd (CR 668) at Mustang Bayou to . | $1,192,897 | Planned | ||
| Jul 1, 2027 estimated | 0912-31-333 | BrazoriaHouston | CR 2000529 | Bridge Replacement Harriman Rd (CR 529) at Drainage Ditch to . | $755,074 | Planned | ||
| Jul 1, 2027 estimated | 0912-31-344 | BrazoriaHouston | CR 9823 | Bridge Replacement Oilfield Rd (CR 98) at Chigger Creek to . | $717,015 | Planned | ||
| Jul 1, 2027 estimated | 0917-12-089 | MilamBryan | CR 16600132 | Bridge Replacement ON CR 132 (AA0132, F-CR 190) to AT NORTH ELM CREEK | $900,000 | Planned | ||
| Jul 1, 2027 estimated | 0917-19-060 | WashingtonBryan | CR 23900205 | Bridge Replacement ON RANDERMANN RD (AA0205, F-CR 203) to AT HARDEMAN BRANCH | $600,000 | Planned | ||
| Jul 1, 2027 estimated | 0917-30-064 | BurlesonBryan | CR 310 | Bridge Replacement On CR 310 to At Davidson Creek | $500,000 | Planned | ||
| Jul 1, 2027 estimated | 0923-08-029 | ColemanBrownwood | CR 4200164 | Bridge Replacement Removal And/Or Replacement And/Or Disposal CR 164 AT HAY BRANCH DRAW to . | $52,000 | Planned | ||
| Jul 1, 2027 estimated | 0943-01-020 | KarnesCorpus Christi | FM 627 | Bridge Replacement On FM 627 at Ecleto Creek Bridge to 1.1 MI W of SH 80 | $1,380,000 | Planned | ||
| Jul 1, 2027 estimated | 1316-01-068 | BrazosBryan | FM 1179 | Bridge Replacement Widen Road - Add Lanes AT WICKSON CREEK to . | $11,000,000 | Planned | ||
| Aug 1, 2027 estimated | 0902-90-388 | TarrantFort Worth | CS 251003 | Bridge Replacement Somerset Blvd to Saddlebrook Dr | $3,900,000 | Planned | ||
| Aug 4, 2027 estimated | 0262-06-032 | RobertsonBryan | FM 391 | Bridge Replacement AT LITTLE PIN OAK CREEK to . | $2,350,000 | Planned | ||
| Aug 4, 2027 estimated | 0909-22-192 | McLennanWaco | CS 1168148 | Bridge Replacement .1 Mi S of Navarro Avenue to .1 Mi N of Navarro Avenue | $455,100 | Planned | ||
| Aug 4, 2027 estimated | 0909-22-205 | McLennanWaco | CR 16101012 | Bridge Replacement S FK Cow BYU #69 to S FK Cow BYU #69 | $689,000 | Planned | ||
| Aug 4, 2027 estimated | 0909-22-208 | McLennanWaco | CR 16109531 | Bridge Replacement Shaw Creek #2018 to Shaw Creek #2018 | $419,000 | Planned | ||
| Aug 4, 2027 estimated | 0909-22-209 | McLennanWaco | CR 16100744 | Bridge Replacement Bluff Creek #532 to Bluff Creek #532 | $739,000 | Planned | ||
| Aug 4, 2027 estimated | 0909-22-210 | McLennanWaco | CR 16100744 | Bridge Replacement @ Tonk Creek to @ Tonk Creek | $845,000 | Planned | ||
| Aug 4, 2027 estimated | 0909-38-093 | FallsWaco | CR 7400358 | Bridge Replacement @ N ELM CRK BR to (MAP #2088) | $492,540 | Planned | ||
| Aug 4, 2027 estimated | 0909-38-104 | FallsWaco | CR 7400408 | Bridge Replacement @ Perry Creek #2054 to @ Perry Creek #2054 | $599,000 | Planned |
1–100 of 152Next ›
Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.