Bridge Maintenance
Official| Seq | Bid code | Description | Quantity | Unit |
|---|---|---|---|---|
| 3 | ||||
| 3 | ||||
| 3 | ||||
| 1 | 341-7045 | D-GR HMA TY-D SAC-B PG64-22DENSE-GRADED HOT-MIX ASPHALT | 386 | TON |
| 2 | 341-7082 | TACK COATDENSE-GRADED HOT-MIX ASPHALT | 455 | GAL |
| 3 | 351-7030 | FLEX PAVEMENT STRUCTURE REPAIR (7"-9")FLEXIBLE PAVEMENT STRUCTURE REPAIR | 62 | SY |
| 4 | 354-7032 | PLANE ASPH CONC PAV(0" TO 2")PLANING AND TEXTURING PAVEMENT | 3,239 | SY |
| 5 | 354-7077 | PLANE ASPH CONC PAV(1.5" - 3.5")PLANING AND TEXTURING PAVEMENT | 4,729 | SY |
| 6 | 361-7057 | FULL - DEPTH REPAIR CRCP (10")FULL-DEPTH REPAIR OF CONCRETE PAVEMENT | 4 | SY |
| 7 | 401-7001 | FLOWABLE BACKFILL | 6 | CY |
| 8 | 420-7052 | CL C CONC (RAIL FOUNDATION)CONCRETE SUBSTRUCTURES | 8 | CY |
| 9 | 427-7004 | SILICONE RESIN PAINT FINISHSURFACE FINISHES FOR CONCRETE | 237 | SF |
| 10 | 428-7001 | PENETRATING CONCRETE SURFACE TREATMENT | 352 | SY |
| 11 | 429-7003 | CONC STR REPAIR(DECK REP(PART DEPTH))CONCRETE STRUCTURE REPAIR | 1,450 | SF |
| 12 | 429-7007 | CONC STR REPAIR (VERTICAL & OVERHEAD)CONCRETE STRUCTURE REPAIR | 276 | SF |
| 13 | 429-7010 | CONC STR REPAIR (PAN GIRDER HOLE REPR)CONCRETE STRUCTURE REPAIR | 75 | EA |
| 14 | 432-7043 | RIPRAP (STONE PROTECTION)(18 IN)RIPRAP | 70 | CY |
| 15 | 438-7001 | CLEANING AND SEALING EXISTING JOINTSCLEANING AND SEALING JOINTS | 68 | LF |
| 16 | 438-7004 | CLEANING AND SEALING EXIST JOINTS (CL3)CLEANING AND SEALING JOINTS | 601 | LF |
| 17 | 438-7007 | CLEANING AND SEALING EXIST JOINTS (CL7)CLEANING AND SEALING JOINTS | 1,808 | LF |
| 18 | 438-7010 | CLEANING AND SEALING JOINTS (FOAM)CLEANING AND SEALING JOINTS | 214 | LF |
| 19 | 438-7012 | CLEAN AND SEAL JNTS (PAN GIRDERS) (CL7)CLEANING AND SEALING JOINTS | 264 | LF |
| 20 | 438-7014 | CLEAN AND SEAL EXIST JTS (STRIP SEAL)CLEANING AND SEALING JOINTS | 232 | LF |
| 21 | 439-7014 | MULTI-LAYER POLYMER OVERLAYBRIDGE DECK OVERLAYS | 27,215 | SY |
| 22 | 439-7016 | POLYESTER POLYMER CONC OVERLAY (1-1/2")BRIDGE DECK OVERLAYS | 723 | SY |
| 23 | 439-7017 | POLYESTER POLYMER CONC OVERLAY (2")BRIDGE DECK OVERLAYS | 661 | SY |
| 24 | 439-7021 | POLYESTER POLYMER CONC OVERLAY (1")BRIDGE DECK OVERLAYS | 1,855 | SY |
| 25 | 446-7001 | CLEAN & PAINT EXIST STR (SYSTEM I)FIELD CLEANING AND PAINTING STEEL | 1 | LS |
| 26 | 446-7007 | CLEAN & PAINT EXIST PILING (SYSTEM I)FIELD CLEANING AND PAINTING STEEL | 1 | LS |
| 27 | 451-7024 | RETROFIT RAIL (TY SSTR)RETROFIT RAILING | 154 | LF |
| 28 | 483-7016 | SHOT BLASTINGCONCRETE BRIDGE DECK SURFACING | 30,454 | SY |
| 29 | 500-7001 | MOBILIZATION | 1 | LS |
| 30 | 502-7001 | BARRICADES, SIGNS AND TRAFFIC HANDLINGBARRICADES, SIGNS, AND TRAFFIC HANDLING | 20 | MO |
| 31 | 503-7002 | PORTABLE CHANGEABLE MESSAGE SIGN | 4 | EA |
| 32 | 505-7001 | TMA (STATIONARY)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) | 274 | DAY |
| 33 | 505-7003 | TMA (MOBILE OPERATION)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) | 55 | DAY |
| 34 | 506-7039 | TEMP SEDMT CONT FENCE (INSTALL)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 2,030 | LF |
| 35 | 506-7041 | TEMP SEDMT CONT FENCE (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS | 2,030 | LF |
| 36 | 510-7003 | ONE-WAY TRAF CONT (PORT TRAF SIG)ONE-WAY TRAFFIC CONTROL | 2 | MO |
| 37 | 512-7001 | PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)PORTABLE TRAFFIC BARRIER | 2,045 | LF |
| 38 | 512-7025 | PORT CTB (MOVE)(SGL SLP)(TY 1)PORTABLE TRAFFIC BARRIER | 2,045 | LF |
| 39 | 512-7049 | PORT CTB (REMOVE)(SGL SLP)(TY 1)PORTABLE TRAFFIC BARRIER | 2,045 | LF |
| 40 | 540-7001 | MTL W-BEAM GD FEN (TIM POST)METAL BEAM GUARD FENCE | 900 | LF |
| 41 | 540-7005 | MTL BEAM GD FEN TRANS (THRIE-BEAM)METAL BEAM GUARD FENCE | 9 | EA |
| 42 | 542-7001 | REMOVE METAL BEAM GUARD FENCEREMOVING METAL BEAM GUARD FENCE | 900 | LF |
| 43 | 542-7004 | RM MTL BM GD FENCE TRANS (THRIE-BEAM)REMOVING METAL BEAM GUARD FENCE | 5 | EA |
| 44 | 544-7001 | GUARDRAIL END TREATMENT (INSTALL)GUARDRAIL END TREATMENTS | 8 | EA |
| 45 | 544-7003 | GUARDRAIL END TREATMENT (REMOVE)GUARDRAIL END TREATMENTS | 8 | EA |
| 46 | 545-7002 | CRASH CUSH ATTEN (MOVE & RESET)CRASH CUSHION ATTENUATORS | 3 | EA |
| 47 | 545-7004 | CRASH CUSH ATTEN (REMOVE)CRASH CUSHION ATTENUATORS | 3 | EA |
| 48 | 545-7014 | CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)CRASH CUSHION ATTENUATORS | 3 | EA |
| 49 | 552-7003 | WIRE FENCE (TY C)WIRE FENCE | 150 | LF |
| 50 | 658-7001 | INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2DELINEATOR AND OBJECT MARKER ASSEMBLIES | 17 | EA |
| 51 | 662-7051 | WK ZN PAV MRK REMOV (REFL) TY II-A-AWORK ZONE PAVEMENT MARKINGS | 894 | EA |
| 52 | 662-7068 | WK ZN PAV MRK REMOV (W)6"(SLD)WORK ZONE PAVEMENT MARKINGS | 79,317 | LF |
| 53 | 662-7100 | WK ZN PAV MRK REMOV (Y)6"(SLD)WORK ZONE PAVEMENT MARKINGS | 35,738 | LF |
| 54 | 666-7538 | RE PM TY III (W)6"(SLD)(EPX)RETROREFLECTORIZED PAVEMENT MARKINGS | 24,069 | LF |
| 55 | 666-7539 | RE PM TY III (W)6"(BRK)(EPX)RETROREFLECTORIZED PAVEMENT MARKINGS | 5,016 | LF |
| 56 | 666-7540 | RE PM TY III (Y)6"(SLD)(EPX)RETROREFLECTORIZED PAVEMENT MARKINGS | 18,912 | LF |
| 57 | 666-7541 | RE PM TY III (Y)6"(BRK)(EPX)RETROREFLECTORIZED PAVEMENT MARKINGS | 397 | LF |
| 58 | 672-7004 | REFL PAV MRKR TY II-A-ARAISED PAVEMENT MARKERS | 20 | EA |
| 59 | 672-7006 | REFL PAV MRKR TY II-C-RRAISED PAVEMENT MARKERS | 253 | EA |
| 60 | 677-7001 | ELIM EXT PM & MRKS (4")ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS | 49,726 | LF |
| 61 | 735-7072 | DEBRIS REMOVAL (SPOT DEBRIS)DEBRIS REMOVAL | 1 | MI |
| 62 | 770-7018 | REPLACE BLOCKOUTGUARD FENCE REPAIR | 1 | EA |
| 63 | 778-7004 | CONCRETE RAIL REPLACEMENT (IN-KIND)CONCRETE RAIL REPAIR | 33 | LF |
| 64 | 780-7003 | CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)CONCRETE CRACK REPAIR | 40 | LF |
| 65 | 785-7004 | BRIDGE JOINT REPAIR (ARMOR)BRIDGE JOINT REPAIR OR REPLACEMENT | 216 | LF |
| 66 | 785-7011 | BRIDGE JOINT REPLACEMENT (SEJ)BRIDGE JOINT REPAIR OR REPLACEMENT | 28 | LF |
| 67 | 787-7001 | REPLACING ELASTOMERIC BEARING PADS | 2 | EA |
| 68 | 6025-7001 | TMSP RADAR SPEED CONTROL MONITORTRAILER MOUNTED SOLAR POWERED RADAR SPEED CONTROL MONITOR | 4 | EA |
Pre-bid questions 2
Overlay Nov 11, 2026
Q: Please confirm that TxDOT will require PPC overlay material as specified in Item 439, and that no alternative materials will be allowed for the proposed overlay.
A: Yes, materials for the PPC overlay should be in accordance with Item 439. · Chase Hermes
Clean & Paint Nov 20, 2026
Q: I see the plans carry LS quantities for both of the Clea and Paint items. For estimating purposes, could you provide the approximate SF quantity of steel to be cleaned and painted?
A: The details in the plans and the provided as-built drawings define the steel components that need to be painted. This information should be sufficient for the contractor to provide a reasonable estimate. · Chase Hermes
From TxDOT's Pre-bid Question and Answer data. Answers become part of the proposal; check the official packet before bidding.