| 1 | 100-6002 |
PREPARING ROW | 403 | STA |
$2,000.00 |
$2,735.00 |
$1,110.00 |
$1,450.00 |
|
| 2 | 104-6001 |
REMOVING CONC (PAV) | 31,754 | SY |
$4.00 |
$4.00 |
$7.40 |
$10.00 |
|
| 3 | 104-6009 |
REMOVING CONC (RIPRAP) | 812 | SY |
$8.44 |
$12.00 |
$12.50 |
$8.00 |
|
| 4 | 105-6095 |
REMOVING STAB BASE & ASPH PAV (12"-14") | 147,117 | SY |
$2.73 |
$3.50 |
$5.40 |
$5.00 |
|
| 5 | 110-6001 |
EXCAVATION (ROADWAY) | 8,410 | CY |
$4.22 |
$7.00 |
$6.80 |
$9.00 |
|
| 6 | 132-6006 |
EMBANKMENT (FINAL)(DENS CONT)(TY C) | 8,216 | CY |
$4.67 |
$4.00 |
$6.05 |
$12.00 |
|
| 7 | 134-6001 |
BACKFILL (TY A) | 403 | STA |
$196.50 |
$125.00 |
$325.00 |
$320.00 |
|
| 8 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 169,219 | SY |
$0.1200 |
$0.3500 |
$0.2500 |
$0.4000 |
|
| 9 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 169,219 | SY |
$0.1200 |
$0.3500 |
$0.2500 |
$0.4000 |
|
| 10 | 164-6036 |
DRILL SEEDING (PERM) (RURAL) (CLAY) | 34.11 | AC |
$607.32 |
$1,400.00 |
$2,500.00 |
$1,400.00 |
|
| 11 | 168-6001 |
VEGETATIVE WATERING | 24.4 | MG |
$30.13 |
$100.00 |
$38.00 |
$115.00 |
|
| 12 | 204-6003 |
SPRINKLING (DUST CONTROL) | 403 | MG |
$2.49 |
$1.00 |
$33.75 |
$27.00 |
|
| 13 | 216-6001 |
PROOF ROLLING | 15.12 | HR |
$50.38 |
$80.00 |
$61.50 |
$61.00 |
|
| 14 | 247-6225 |
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS) | 65,573 | CY |
$26.00 |
$44.50 |
$48.50 |
$50.00 |
|
| 15 | 260-6011 |
LIME TRT (EXST MATL) (12") | 198,674 | SY |
$3.00 |
$2.25 |
$2.20 |
$3.00 |
|
| 16 | 260-6043 |
LIME (HYD, COM OR QK)(SLURRY) | 5,893 | TON |
$202.71 |
$260.00 |
$340.00 |
$300.00 |
|
| 17 | 275-6001 |
CEMENT | 2,473 | TON |
$198.18 |
$190.00 |
$229.00 |
$200.00 |
|
| 18 | 275-6035 |
CEMENT TREAT (NEW BASE)(12") | 196,691 | SY |
$3.50 |
$2.00 |
$2.80 |
$3.00 |
|
| 19 | 316-6005 |
ASPH (TIER II) | 55,704 | GAL |
$4.17 |
$6.00 |
$4.15 |
$5.00 |
|
| 20 | 316-6486 |
AGGR (TY-D GR-4P)(SAC-B) | 1,560 | CY |
$63.82 |
$65.00 |
$102.00 |
$130.00 |
|
| 21 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 370 | SY |
$1.51 |
$18.00 |
$5.95 |
$7.00 |
|
| 22 | 354-6041 |
PLANE ASPH CONC PAV (1.5") | 457 | SY |
$1.35 |
$18.00 |
$7.00 |
$6.00 |
|
| 23 | 401-6001 |
FLOWABLE BACKFILL | 1,749 | CY |
$132.99 |
$240.00 |
$171.00 |
$180.00 |
|
| 24 | 432-6002 |
RIPRAP (CONC)(5 IN) | 157 | CY |
$340.47 |
$1,000.00 |
$429.00 |
$560.00 |
|
| 25 | 432-6046 |
RIPRAP (MOW STRIP)(5 IN) | 135 | CY |
$327.62 |
$750.00 |
$414.00 |
$600.00 |
|
| 26 | 450-6023 |
RAIL (TY SSTR) | 190 | LF |
$145.00 |
$250.00 |
$146.00 |
$270.00 |
|
| 27 | 451-6024 |
RETROFIT RAIL (TY SSTR) | 134 | LF |
$168.68 |
$315.00 |
$237.00 |
$360.00 |
|
| 28 | 462-6020 |
CONC BOX CULV (8 FT X 5 FT) | 98 | LF |
$900.00 |
$1,600.00 |
$1,460.00 |
$1,820.00 |
|
| 29 | 464-6003 |
RC PIPE (CL III)(18 IN) | 686 | LF |
$38.47 |
$92.00 |
$78.00 |
$91.00 |
|
| 30 | 467-6363 |
SET (TY II) (18 IN) (RCP) (6: 1) (P) | 38 | EA |
$953.61 |
$1,400.00 |
$1,130.00 |
$1,300.00 |
|
| 31 | 480-6001 |
CLEAN EXIST CULVERTS | 21 | EA |
$1,558.82 |
$7,000.00 |
$3,270.00 |
$6,000.00 |
|
| 32 | 496-6004 |
REMOV STR (SET) | 11 | EA |
$236.48 |
$500.00 |
$374.00 |
$360.00 |
|
| 33 | 496-6007 |
REMOV STR (PIPE) | 546 | LF |
$6.06 |
$20.00 |
$14.75 |
$11.00 |
|
| 34 | 496-6099 |
REMOVE STR (RAIL) | 209 | LF |
$24.56 |
$20.00 |
$27.50 |
$290.00 |
|
| 35 | 500-6001 |
MOBILIZATION | 1 | LS |
$1,250,000.00 |
$950,000.00 |
$900,000.00 |
$1,085,000.00 |
|
| 36 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 20 | MO |
$2,602.37 |
$5,000.00 |
$4,330.00 |
$8,000.00 |
|
| 37 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 312 | SY |
$26.49 |
$48.00 |
$24.50 |
$18.00 |
|
| 38 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 446 | SY |
$8.07 |
$12.00 |
$7.50 |
$9.00 |
|
| 39 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 430 | LF |
$3.35 |
$4.00 |
$3.50 |
$5.00 |
|
| 40 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 430 | LF |
$1.30 |
$1.00 |
$1.05 |
$2.00 |
|
| 41 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 30,195 | LF |
$4.05 |
$4.00 |
$3.35 |
$5.00 |
|
| 42 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 30,195 | LF |
$0.9300 |
$1.00 |
$1.00 |
$1.00 |
|
| 43 | 512-6005 |
PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 570 | LF |
$65.00 |
$20.00 |
$16.75 |
$42.00 |
|
| 44 | 512-6029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,165 | LF |
$5.00 |
$10.00 |
$4.55 |
$25.00 |
|
| 45 | 512-6053 |
PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 570 | LF |
$10.00 |
$10.00 |
$14.25 |
$27.00 |
|
| 46 | 529-6036 |
CONCRETE CURB (SPECIAL) | 214 | LF |
$15.11 |
$50.00 |
$55.50 |
$49.00 |
|
| 47 | 530-6005 |
DRIVEWAYS (ACP) | 12,472 | SY |
$45.13 |
$30.00 |
$35.25 |
$31.00 |
|
| 48 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 1,175 | LF |
$33.50 |
$36.00 |
$38.25 |
$33.00 |
|
| 49 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 8 | EA |
$2,104.80 |
$2,800.00 |
$2,750.00 |
$2,350.00 |
|
| 50 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,050 | LF |
$2.09 |
$2.50 |
$6.90 |
$3.00 |
|
| 51 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 2 | EA |
$195.21 |
$200.00 |
$331.00 |
$230.00 |
|
| 52 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 8 | EA |
$222.77 |
$200.00 |
$264.00 |
$230.00 |
|
| 53 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 11 | EA |
$3,299.49 |
$3,600.00 |
$4,160.00 |
$3,550.00 |
|
| 54 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 10 | EA |
$248.98 |
$200.00 |
$323.00 |
$280.00 |
|
| 55 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 6 | EA |
$1,044.88 |
$3,100.00 |
$1,500.00 |
$1,100.00 |
|
| 56 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$806.24 |
$1,525.00 |
$847.00 |
$930.00 |
|
| 57 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 2 | EA |
$10,000.00 |
$10,900.00 |
$10,100.00 |
$8,630.00 |
|
| 58 | 545-6026 |
CRASH CUSHION ATTEN (INSTALL) (QUAD)(N) | 1 | EA |
$38,255.50 |
$31,500.00 |
$30,900.00 |
$26,280.00 |
|
| 59 | 560-6003 |
MAILBOX INSTALL-M (TWG-POST) TY 1 | 1 | EA |
$317.00 |
$625.00 |
$646.00 |
$760.00 |
|
| 60 | 560-6007 |
MAILBOX INSTALL-S (WC-POST) TY 3 | 134 | EA |
$220.77 |
$260.00 |
$217.00 |
$440.00 |
|
| 61 | 560-6008 |
MAILBOX INSTALL-D (WC-POST) TY 3 | 5 | EA |
$254.64 |
$300.00 |
$247.00 |
$430.00 |
|
| 62 | 636-6001 |
ALUMINUM SIGNS (TY A) | 136 | SF |
$26.50 |
$40.00 |
$28.75 |
$45.00 |
|
| 63 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 12 | EA |
$651.28 |
$725.00 |
$763.00 |
$900.00 |
|
| 64 | 644-6027 |
IN SM RD SN SUP&AM TYS80(1)SA(P) | 78 | EA |
$700.00 |
$780.00 |
$781.00 |
$890.00 |
|
| 65 | 644-6030 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 18 | EA |
$925.16 |
$825.00 |
$969.00 |
$1,070.00 |
|
| 66 | 644-6033 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 6 | EA |
$1,114.95 |
$1,000.00 |
$1,140.00 |
$1,140.00 |
|
| 67 | 644-6076 |
REMOVE SM RD SN SUP&AM | 88 | EA |
$108.42 |
$80.00 |
$100.00 |
$100.00 |
|
| 68 | 658-6060 |
REMOVE DELIN & OBJECT MARKER ASSMS | 15 | EA |
$25.42 |
$10.00 |
$21.25 |
$10.00 |
|
| 69 | 658-6099 |
INSTL OM ASSM (OM-2Z)(WFLX)GND | 22 | EA |
$49.50 |
$30.00 |
$71.50 |
$100.00 |
|
| 70 | 658-6100 |
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) | 19 | EA |
$100.00 |
$50.00 |
$75.00 |
$100.00 |
|
| 71 | 658-6116 |
INS DEL ASSM(D-SW)SZ 1(WFLX)GF2(BI) | 32 | EA |
$150.00 |
$55.00 |
$45.25 |
$100.00 |
|
| 72 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 81,000 | LF |
$0.5600 |
$0.3000 |
$0.3000 |
$0.3000 |
|
| 73 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 81,000 | LF |
$0.3700 |
$0.3000 |
$0.3000 |
$0.3000 |
|
| 74 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 4,050 | EA |
$0.8700 |
$1.00 |
$1.90 |
$3.00 |
|
| 75 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 4,050 | EA |
$0.1900 |
$1.00 |
$2.00 |
$3.00 |
|
| 76 | 666-6036 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 602 | LF |
$1.15 |
$1.00 |
$1.05 |
$0.9000 |
|
| 77 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 567 | LF |
$6.86 |
$9.00 |
$10.50 |
$9.00 |
|
| 78 | 666-6141 |
REFL PAV MRK TY I (Y)12"(SLD)(100MIL) | 1,364 | LF |
$3.22 |
$9.00 |
$10.50 |
$9.00 |
|
| 79 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 79,405 | LF |
$0.2800 |
$0.6500 |
$0.7000 |
$0.6000 |
|
| 80 | 666-6318 |
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) | 7,880 | LF |
$0.3500 |
$0.6500 |
$0.7000 |
$0.6000 |
|
| 81 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 24,466 | LF |
$0.3400 |
$0.6500 |
$0.7000 |
$0.6000 |
|
| 82 | 666-6343 |
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL) | 79,405 | LF |
$0.5000 |
$0.7500 |
$0.9000 |
$0.7000 |
|
| 83 | 668-6077 |
PREFAB PAV MRK TY C (W) (ARROW) | 5 | EA |
$227.87 |
$200.00 |
$235.00 |
$200.00 |
|
| 84 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 5 | EA |
$253.54 |
$275.00 |
$323.00 |
$280.00 |
|
| 85 | 668-6089 |
PREFAB PAV MRK TY C (W) (RR XING) | 2 | EA |
$598.33 |
$500.00 |
$587.00 |
$500.00 |
|
| 86 | 672-6007 |
REFL PAV MRKR TY I-C | 951 | EA |
$3.42 |
$4.00 |
$4.50 |
$4.00 |
|
| 87 | 672-6009 |
REFL PAV MRKR TY II-A-A | 960 | EA |
$3.12 |
$4.00 |
$4.50 |
$4.00 |
|
| 88 | 752-6003 |
TREE TRIMMING / BRUSH REMOVAL | 1 | MI |
$8,315.64 |
$5,000.00 |
$4,240.00 |
$5,000.00 |
|
| 89 | 752-6006 |
TREE REMOVAL (12" - 18" DIA) | 12 | EA |
$1,275.26 |
$1,500.00 |
$969.00 |
$1,500.00 |
|
| 90 | 760-6001 |
DITCH CLEANING AND RESHAPING (FOOT) | 80,872 | LF |
$5.00 |
$1.00 |
$1.60 |
$6.00 |
|
| 91 | 3077-6065 |
SP MIXES SP-D SAC-A PG76-22 | 31,199 | TON |
$114.24 |
$114.00 |
$138.00 |
$130.00 |
|
| 92 | 3080-6007 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 39.07 | TON |
$122.79 |
$200.00 |
$231.00 |
$240.00 |
|
| 93 | 5001-6002 |
GEOGRID BASE REINFORCEMENT (TY II) | 198,674 | SY |
$1.43 |
$1.00 |
$1.15 |
$2.00 |
|
| 94 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$4,859.88 |
$5,000.00 |
$16,300.00 |
$8,000.00 |
|
| 95 | 6056-6002 |
PREFORMED CENTERLINE RUMBLE STRIP | 39,150 | LF |
$0.1800 |
$3.07 |
$5.85 |
$0.5000 |
|
| 96 | 6185-6002 |
TMA (STATIONARY) | 347 | DAY |
$250.00 |
$25.00 |
$294.00 |
$25.00 |
|
| 97 | 6185-6003 |
TMA (MOBILE OPERATION) | 200 | HR |
$25.00 |
$0.0100 |
$129.00 |
$25.00 |
|