‹ Nov 2024 results
BU 271 Sidewalk
- Let date
- Wednesday, November 6, 2024
- CCSJ
- 0221-01-083
- District
- Paris
- County
- Lamar
- Highway
- BU 271B
- Limits
- 18th SE to 34th SE
- Classification
- Pedestrian, Sidewalks & Curb Ramps · Construction
- Project number
- F 2025(206)
- Working days
- 275
- DBE goal
- 0%
Bidders 9
| # | Contractor | Total bid | vs estimate | vs low |
| EE | Engineer's estimate | $2,535,516 | | |
| 1 |
THK CONSTRUCTION LLC Low bidder |
$2,222,429 |
-12.3% |
|
| 2 |
GARRET SHIELDS INFRASTRUCTURE |
$2,233,651 |
-11.9% |
+0.5% |
| 3 |
PROJECT ALLIED RESOURCES, LLC |
$2,357,714 |
-7.0% |
+6.1% |
| 4 |
TI-ZACK CONCRETE, LLC |
$2,368,610 |
-6.6% |
+6.6% |
| 5 |
RB CONTRACTING, LLC |
$2,611,438 |
+3.0% |
+17.5% |
| 6 |
STX CIVIL |
$3,003,977 |
+18.5% |
+35.2% |
| 7 |
FNH CONSTRUCTION, LLC |
$3,245,845 |
+28.0% |
+46.0% |
| 8 |
C. E. BARKER, LTD. |
$3,623,743 |
+42.9% |
+63.1% |
| 9 |
SKYLINE BRIDGE LLC |
$4,134,142 |
+63.0% |
+86.0% |
Bid tab: unit prices 37 items
ExcelCSV
| Seq | Bid code | Description | Qty | Unit | Estimate |
#1 THK CONSTRUCTIO… | #2 GARRET SHIELDS … | #3 PROJECT ALLIED … | #4 TI-ZACK CONCRET… | #5 RB CONTRACTING,… | #6 STX CIVIL | #7 FNH CONSTRUCTIO… | #8 C. E. BARKER, L… |
| 1 | 100-7002 |
PREPARING ROW | 106.51 | STA |
$1,250.00 |
$700.00 |
$500.00 |
$940.00 |
$110.00 |
$1,000.00 |
$4,000.00 |
$2,000.00 |
$3,400.00 |
| 2 | 100-7003 |
PREP ROW (TREE REMOVE) (0"-12" DIA) | 26 | EA |
$625.00 |
$500.00 |
$500.00 |
$614.00 |
$550.00 |
$780.00 |
$700.00 |
$2,500.00 |
$1,088.14 |
| 3 | 100-7005 |
PREP ROW (TREE REMOVE) (24"-36" DIA) | 8 | EA |
$2,000.00 |
$1,000.00 |
$1,000.00 |
$1,590.00 |
$2,750.00 |
$1,600.00 |
$2,000.00 |
$10,000.00 |
$1,568.20 |
| 4 | 104-7011 |
REMOV CONC (DRIVEWAYS) | 600 | SY |
$20.00 |
$25.00 |
$20.00 |
$24.00 |
$31.92 |
$40.00 |
$50.00 |
$30.00 |
$32.00 |
| 5 | 104-7013 |
REMOV CONC (SIDEWALK, RAMP OR SUP) | 600 | SY |
$20.00 |
$25.00 |
$20.00 |
$20.80 |
$31.92 |
$40.00 |
$50.00 |
$30.00 |
$41.61 |
| 6 | 104-7046 |
REMOV CONC (MISC) | 600 | SY |
$20.00 |
$20.00 |
$20.00 |
$24.00 |
$15.96 |
$40.00 |
$50.00 |
$30.00 |
$60.81 |
| 7 | 110-7001 |
EXCAV (ROADWAY) | 1,144.53 | CY |
$50.00 |
$20.00 |
$50.00 |
$24.60 |
$83.67 |
$20.00 |
$50.00 |
$50.00 |
$28.80 |
| 8 | 132-7003 |
EMBANK (FNL)(OC)(TY B) | 1,837.3 | CY |
$75.00 |
$20.00 |
$60.00 |
$34.40 |
$73.12 |
$40.00 |
$50.00 |
$100.00 |
$54.41 |
| 9 | 162-7002 |
BLOCK SODDING | 11,886 | SY |
$14.00 |
$5.84 |
$9.00 |
$8.10 |
$7.70 |
$12.00 |
$10.00 |
$10.00 |
$10.88 |
| 10 | 168-7001 |
VEGETATIVE WATERING | 66.562 | TGL |
$200.00 |
$20.00 |
$200.00 |
$71.00 |
$1.10 |
$55.00 |
$80.00 |
$50.00 |
$92.95 |
| 11 | 341-7064 |
D-GR HMA TY-D PG 64-22 (EXEMPT) | 10 | TON |
$300.00 |
$300.00 |
$200.00 |
$352.00 |
$385.00 |
$205.00 |
$1,000.00 |
$500.00 |
$352.45 |
| 12 | 400-7008 |
CUT & RESTORE ASPH PAVING | 600 | SY |
$175.00 |
$150.00 |
$100.00 |
$124.00 |
$104.50 |
$210.00 |
$250.00 |
$200.00 |
$334.44 |
| 13 | 422-7012 |
BRIDGE SIDEWALK | 40 | SF |
$40.00 |
$130.00 |
$120.00 |
$353.00 |
$106.86 |
$165.00 |
$225.00 |
$100.00 |
$59.53 |
| 14 | 432-7043 |
RIPRAP (STONE PROTECTION)(18 IN) | 137 | CY |
$110.00 |
$200.00 |
$300.00 |
$231.00 |
$110.00 |
$200.00 |
$280.00 |
$185.00 |
$249.63 |
| 15 | 450-7062 |
RAIL (HANDRAIL)(TY E) | 1,157 | LF |
$250.00 |
$136.08 |
$180.00 |
$187.00 |
$143.76 |
$180.00 |
$190.00 |
$185.00 |
$167.30 |
| 16 | 462-7064 |
CONC BOX CULV (5 FT X 5 FT)(EXTEND) | 69 | LF |
$1,200.00 |
$1,150.00 |
$1,000.00 |
$1,130.00 |
$1,650.00 |
$1,000.00 |
$1,250.00 |
$600.00 |
$1,746.65 |
| 17 | 462-7074 |
CONC BOX CULV (7 FT X 7 FT)(EXTEND) | 18 | LF |
$2,000.00 |
$1,200.00 |
$1,000.00 |
$1,450.00 |
$1,650.00 |
$2,250.00 |
$1,350.00 |
$1,000.00 |
$2,192.15 |
| 18 | 466-7177 |
WINGWALL (PW - 1) (HW=7 FT) | 1.5 | EA |
$30,000.00 |
$60,000.00 |
$15,000.00 |
$31,100.00 |
$38,500.00 |
$32,000.00 |
$60,000.00 |
$25,000.00 |
$38,404.80 |
| 19 | 466-7179 |
WINGWALL (PW - 1) (HW=9 FT) | 0.5 | EA |
$50,000.00 |
$80,000.00 |
$40,000.00 |
$42,800.00 |
$55,000.00 |
$50,000.00 |
$80,000.00 |
$65,000.00 |
$65,928.24 |
| 20 | 500-7001 |
MOBILIZATION | 1 | LS |
$222,320.00 |
$200,000.00 |
$200,000.00 |
$227,000.00 |
$226,627.91 |
$240,000.00 |
$235,000.00 |
$300,000.00 |
$329,428.00 |
| 21 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 | MO |
$5,000.00 |
$10,008.36 |
$5,000.00 |
$3,110.00 |
$2,750.00 |
$2,200.00 |
$4,000.00 |
$8,500.00 |
$9,601.20 |
| 22 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$7,500.00 |
$25,000.00 |
$1,000.00 |
$15,200.00 |
$1.10 |
$15,000.00 |
$7,500.00 |
$16,500.00 |
$22,082.76 |
| 23 | 505-7001 |
TMA (STATIONARY) | 300 | DAY |
$300.00 |
$250.00 |
$300.00 |
$202.00 |
$1.10 |
$465.00 |
$250.00 |
$250.00 |
$192.02 |
| 24 | 505-7003 |
TMA (MOBILE OPERATION) | 150 | DAY |
$350.00 |
$250.00 |
$300.00 |
$101.00 |
$1.10 |
$350.00 |
$150.00 |
$550.00 |
$704.09 |
| 25 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 60 | LF |
$20.00 |
$54.00 |
$6.00 |
$7.30 |
$11.00 |
$8.00 |
$8.00 |
$4.00 |
$6.40 |
| 26 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 60 | LF |
$10.00 |
$27.00 |
$1.00 |
$2.19 |
$1.10 |
$8.00 |
$2.00 |
$2.00 |
$2.56 |
| 27 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 100 | LF |
$20.00 |
$10.80 |
$10.00 |
$11.80 |
$11.00 |
$15.00 |
$10.00 |
$18.00 |
$8.00 |
| 28 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 100 | LF |
$10.00 |
$10.80 |
$1.00 |
$5.40 |
$1.10 |
$15.00 |
$2.00 |
$9.00 |
$2.88 |
| 29 | 530-7006 |
DRIVEWAYS (CONC) | 1,685 | SY |
$105.00 |
$100.00 |
$120.00 |
$118.00 |
$116.25 |
$120.00 |
$135.00 |
$95.00 |
$132.45 |
| 30 | 530-7010 |
DRIVEWAYS (ACP) | 710 | SY |
$75.00 |
$90.00 |
$100.00 |
$62.00 |
$99.00 |
$95.00 |
$90.00 |
$55.00 |
$290.24 |
| 31 | 531-7002 |
CONC SIDEWALKS (5") | 6,037 | SY |
$80.00 |
$90.00 |
$90.00 |
$104.00 |
$110.62 |
$107.00 |
$95.00 |
$65.00 |
$147.07 |
| 32 | 531-7008 |
CURB RAMPS (TY 5) | 1 | EA |
$3,400.00 |
$3,500.00 |
$3,000.00 |
$3,510.00 |
$2,326.31 |
$3,500.00 |
$5,000.00 |
$3,250.00 |
$3,291.84 |
| 33 | 531-7010 |
CURB RAMPS (TY 7) | 22 | EA |
$2,800.00 |
$3,500.00 |
$3,000.00 |
$3,510.00 |
$2,326.31 |
$3,300.00 |
$4,000.00 |
$3,250.00 |
$2,880.36 |
| 34 | 531-7026 |
CONCRETE SIDEWALK (RETAINING WALL) | 126.59 | CY |
$700.00 |
$150.00 |
$500.00 |
$961.00 |
$1,485.88 |
$700.00 |
$900.00 |
$5,000.00 |
$576.07 |
| 35 | 644-7065 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 23 | EA |
$600.00 |
$621.00 |
$500.00 |
$727.00 |
$495.00 |
$750.00 |
$750.00 |
$1,100.00 |
$761.70 |
| 36 | 644-7067 |
RELOCATE SM RD SN SUP&AM TY S80 | 1 | EA |
$700.00 |
$696.60 |
$500.00 |
$1,130.00 |
$495.00 |
$750.00 |
$750.00 |
$1,000.00 |
$761.70 |
| 37 | 658-7058 |
INSTL OM ASSM (OM-2Z)(WFLX)GND | 8 | EA |
$100.00 |
$78.30 |
$80.00 |
$94.00 |
$495.00 |
$60.00 |
$200.00 |
$100.00 |
$70.41 |
Showing the first 8 bidders. The Excel and CSV downloads include all 9.