| 1 | 100-7002 |
PREPARING ROW | 462.52 | STA |
$169.00 |
$10.50 |
$25.00 |
$34.45 |
$43.90 |
$150.00 |
| 2 | 105-7038 |
RMV (18") TRT/UNTRT BASE & ASPH PAV | 3,708 | SY |
$22.00 |
$21.50 |
$15.00 |
$30.82 |
$23.98 |
$40.00 |
| 3 | 110-7001 |
EXCAV (ROADWAY) | 5 | CY |
$100.00 |
$65.00 |
$85.00 |
$114.34 |
$28.92 |
$100.00 |
| 4 | 112-7002 |
SUBGR WIDEN (DC) | 45 | STA |
$2,000.00 |
$905.00 |
$1,900.00 |
$1,571.68 |
$857.64 |
$6,000.00 |
| 5 | 132-7004 |
EMBANK (FNL)(DC)(TY B) | 2,393 | CY |
$44.00 |
$35.50 |
$75.00 |
$12.73 |
$115.77 |
$100.00 |
| 6 | 134-7001 |
BACKFILL (TY A) | 913.04 | STA |
$220.00 |
$270.00 |
$240.00 |
$253.98 |
$60.86 |
$500.00 |
| 7 | 150-7002 |
BLADING | 330 | HR |
$250.00 |
$185.00 |
$150.00 |
$312.32 |
$306.08 |
$150.00 |
| 8 | 164-7042 |
DRILL SEED (PERM_RURAL_CLAY) | 40 | AC |
$692.00 |
$585.00 |
$590.00 |
$599.50 |
$657.94 |
$600.00 |
| 9 | 164-7047 |
DRILL SEED (TEMP_WARM_COOL) | 40 | AC |
$500.00 |
$485.00 |
$475.00 |
$484.00 |
$531.18 |
$500.00 |
| 10 | 247-7134 |
FL BS(CMP IN PLC)(TY A,B OR D GR4)(12") | 6,208 | SY |
$40.00 |
$57.50 |
$48.00 |
$41.35 |
$39.00 |
$70.00 |
| 11 | 310-7004 |
PRIME COAT (MC-30) | 1,156 | GAL |
$8.00 |
$5.20 |
$9.90 |
$7.22 |
$9.97 |
$12.00 |
| 12 | 314-7008 |
EMULS ASPH (EROSN CONT)(SS-1) | 8,189 | GAL |
$5.00 |
$6.00 |
$4.65 |
$4.26 |
$2.18 |
$10.00 |
| 13 | 341-7082 |
TACK COAT | 54,199 | GAL |
$7.00 |
$6.40 |
$5.45 |
$6.88 |
$6.31 |
$6.00 |
| 14 | 346-7010 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-28 | 69,958 | TON |
$194.00 |
$169.00 |
$176.15 |
$197.44 |
$172.00 |
$235.00 |
| 15 | 351-7002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") | 12,613 | SY |
$29.00 |
$47.00 |
$46.00 |
$37.21 |
$42.91 |
$75.00 |
| 16 | 354-7067 |
PLANE CONC PAV(0" TO 3") | 5,200 | SY |
$6.00 |
$7.80 |
$7.10 |
$4.09 |
$7.27 |
$10.00 |
| 17 | 432-7012 |
RIPRAP (CONC)(FLUME) | 903 | CY |
|
$700.00 |
$700.00 |
$712.80 |
$1,207.23 |
$1,000.00 |
| 18 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 147 | CY |
|
$680.00 |
$680.00 |
$690.53 |
$834.21 |
$700.00 |
| 19 | 500-7001 |
MOBILIZATION | 1 | LS |
$1,975,000.00 |
$1,950,000.00 |
$2,047,000.00 |
$1,000,000.00 |
$2,100,183.85 |
$2,680,000.00 |
| 20 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 | MO |
$20,000.00 |
$29,000.00 |
$40,000.00 |
$28,576.99 |
$33,389.39 |
$90,000.00 |
| 21 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$17,000.00 |
$11,000.00 |
$24,000.00 |
$18,868.63 |
$19,602.38 |
$18,500.00 |
| 22 | 505-7001 |
TMA (STATIONARY) | 160 | DAY |
$300.00 |
$270.00 |
$550.00 |
$556.76 |
$598.10 |
$700.00 |
| 23 | 505-7002 |
TMA (MOBILE OPERATION) | 80 | HR |
$130.00 |
$97.00 |
$100.00 |
$105.69 |
$110.31 |
$95.00 |
| 24 | 506-7038 |
SANDBAGS FOR EROSION CONTROL (12") | 825 | LF |
$10.00 |
$5.40 |
$25.00 |
$6.60 |
$22.71 |
$5.00 |
| 25 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 825 | LF |
$7.00 |
$7.55 |
$9.45 |
$4.73 |
$5.19 |
$7.00 |
| 26 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 825 | LF |
$3.00 |
$1.60 |
$5.00 |
$1.93 |
$2.11 |
$1.50 |
| 27 | 514-7001 |
PERM CTB (SGL SLOPE) (TY 1) (42 ) | 3,450 | LF |
|
$135.00 |
$106.75 |
$105.62 |
$120.94 |
$150.00 |
| 28 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 45,653 | LF |
$0.2000 |
$0.0900 |
$0.4500 |
$0.0800 |
$0.3600 |
$0.3300 |
| 29 | 543-7002 |
CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 11,604 | LF |
|
$18.50 |
$18.35 |
$18.70 |
$20.52 |
$20.00 |
| 30 | 543-7018 |
CABLE BARRIER TERM SEC (INSTL)(TL-4) | 12 | EA |
|
$5,500.00 |
$5,450.00 |
$5,555.00 |
$6,096.51 |
$10,000.00 |
| 31 | 545-7006 |
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 4 | EA |
|
$44,000.00 |
$44,000.00 |
$38,500.00 |
$43,158.43 |
$41,000.00 |
| 32 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 34 | EA |
$980.00 |
$785.00 |
$1,025.00 |
$797.50 |
$1,448.67 |
$700.00 |
| 33 | 644-7004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 138 | EA |
$980.00 |
$885.00 |
$1,180.00 |
$902.00 |
$1,448.67 |
$850.00 |
| 34 | 644-7025 |
IN SM RD SN SUP&AM TYS80(1)SA(P) | 46 | EA |
$1,000.00 |
$1,100.00 |
$1,490.00 |
$1,100.00 |
$1,448.67 |
$1,200.00 |
| 35 | 644-7028 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 1 | EA |
$1,000.00 |
$1,100.00 |
$1,410.00 |
$1,127.50 |
$1,690.12 |
$1,100.00 |
| 36 | 644-7031 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 1 | EA |
$1,200.00 |
$1,100.00 |
$1,480.00 |
$1,155.00 |
$1,690.12 |
$1,100.00 |
| 37 | 658-7003 |
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND | 32 | EA |
$150.00 |
$130.00 |
$162.00 |
$132.00 |
$132.80 |
$70.00 |
| 38 | 658-7023 |
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GND | 29 | EA |
$150.00 |
$130.00 |
$162.00 |
$132.00 |
$132.80 |
$65.00 |
| 39 | 658-7033 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR) | 35 | EA |
|
$48.50 |
$49.00 |
$49.50 |
$72.43 |
$65.00 |
| 40 | 658-7050 |
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND | 140 | EA |
$150.00 |
$130.00 |
$162.00 |
$132.00 |
$132.80 |
$65.00 |
| 41 | 658-7058 |
INSTL OM ASSM (OM-2Z)(WFLX)GND | 79 | EA |
$150.00 |
$130.00 |
$162.00 |
$132.00 |
$132.80 |
$65.00 |
| 42 | 658-7078 |
REMOVE DELIN & OBJECT MARKER ASSMS | 248 | EA |
$18.00 |
$16.00 |
$16.00 |
$16.50 |
$24.14 |
$20.00 |
| 43 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 1,400 | EA |
$1.00 |
$1.65 |
$1.55 |
$2.62 |
$2.41 |
$2.00 |
| 44 | 666-7017 |
REFL PAV MRK TY I (W)8"(DOT)(090MIL) | 105 | LF |
$2.00 |
$2.15 |
$2.15 |
$2.20 |
$2.41 |
$2.00 |
| 45 | 666-7023 |
REFL PAV MRK TY I (W)8"(SLD)(090MIL) | 4,303 | LF |
$1.00 |
$1.10 |
$1.10 |
$1.10 |
$1.21 |
$1.00 |
| 46 | 666-7035 |
REFL PAV MRK TY I (W)24"(SLD)(090MIL) | 232 | LF |
$11.00 |
$11.00 |
$10.80 |
$11.00 |
$12.07 |
$10.00 |
| 47 | 666-7089 |
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL) | 325 | EA |
$44.00 |
$48.50 |
$48.55 |
$49.50 |
$54.33 |
$45.00 |
| 48 | 666-7289 |
TY I HIGH PERF PM (W)6"(BRK)(090MIL) | 22,704 | LF |
$0.7700 |
$0.7200 |
$0.7500 |
$0.7400 |
$0.8100 |
$0.6700 |
| 49 | 666-7292 |
TY I HIGH PERF PM (W)6"(SLD)(090MIL) | 88,283 | LF |
$0.7400 |
$0.6800 |
$0.7000 |
$0.6900 |
$0.7600 |
$0.6300 |
| 50 | 666-7304 |
TY I HIGH PERF PM (Y)6"(SLD)(090MIL) | 90,480 | LF |
$0.7700 |
$0.6800 |
$0.7000 |
$0.6900 |
$0.7600 |
$0.6300 |
| 51 | 3006-7001 |
UNDERSEAL COURSE | 101,933 | GAL |
$7.00 |
$5.80 |
$5.45 |
$5.76 |
$6.24 |
$0.7200 |
| 52 | 3011-7001 |
REINFORMT GRID FOR ASPHALT PVMT OVERLA | 131,884 | SY |
$8.00 |
$8.00 |
$7.35 |
$7.43 |
$8.33 |
$7.70 |
| 53 | 6020-7002 |
REC REFL PAV MRKR TY II-C-R | 1,442 | EA |
$34.00 |
$48.50 |
$49.00 |
$49.50 |
$54.33 |
$45.00 |
| 54 | 6020-7003 |
REC REFL PAV MRKR TY I-A | 128 | EA |
$34.00 |
$65.00 |
$64.75 |
$66.00 |
$72.43 |
$60.00 |
| 7 | 150-7002 |
BLADING | 165 | HR |
$250.00 |
|
|
|
|
|
| 17 | 432-7012 |
RIPRAP (CONC)(FLUME) | 903 | CY |
$775.00 |
|
|
|
|
|
| 18 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 147 | CY |
$775.00 |
|
|
|
|
|
| 19 | 500-7001 |
MOBILIZATION | 0.05 | LS |
$1,975,000.00 |
|
|
|
|
|
| 20 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 | MO |
$20,000.00 |
|
|
|
|
|
| 27 | 514-7001 |
PERM CTB (SGL SLOPE) (TY 1) (42 ) | 3,450 | LF |
$105.00 |
|
|
|
|
|
| 29 | 543-7002 |
CABLE BARRIER SYSTEM (INSTALL)(TL-4) | 11,604 | LF |
$14.00 |
|
|
|
|
|
| 30 | 543-7018 |
CABLE BARRIER TERM SEC (INSTL)(TL-4) | 12 | EA |
$4,000.00 |
|
|
|
|
|
| 31 | 545-7006 |
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 4 | EA |
$18,000.00 |
|
|
|
|
|
| 39 | 658-7033 |
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR) | 35 | EA |
$10.00 |
|
|
|
|
|