Contact information
- juan@vizcainolp.com
- Phone
- (432) 332-8433
- Address
- 2210 W. 16TH STREET, ODESSA, TX 79763
- TxDOT prequalification
- Construction qualified
99BidsOct 9, 2013 to Oct 7, 2026
30Wins (low bidder)
30.3%Win rate
$35,877,890Total won
Competitor scorecard
Last 5 years in Texas29.2%Win rate14 of 48 bids
+6.9%Average bid vs estimate
-3.2%Winning bids vs estimate
+46.9%Over the low bid when they loseAverage field: 5.4 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| L&L COMPANY | 25 | 13 | 12 | 52% |
| STRIPE-A-ZONE, LLC | 23 | 15 | 8 | 65% |
| CENTERLINE TECHNOLOGIES, LLC | 17 | 6 | 11 | 35% |
| PAVEMENT MARKINGS INC. | 15 | 10 | 5 | 67% |
| TRP INFRASTRUCTURE SERVICES, LLC | 15 | 11 | 4 | 73% |
| TRP CONSTRUCTION GROUP, LLC | 15 | 14 | 1 | 93% |
| PMI PAVEMENT MARKING, LLC | 12 | 10 | 2 | 83% |
| INTERSTATE BARRICADES & MARKINGS, INC. | 10 | 9 | 1 | 90% |
| SWEEPING CORPORATION OF AMERICA, LLC | 9 | 3 | 6 | 33% |
| DIGG COMMERCIAL, LLC | 8 | 4 | 4 | 50% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Oct 7, 2026 | 0907-00-217 | 0907-00-217 VA PAVEMENT MARKINGSTom Green · San Angelo | 2 of 7 | $2,821,484 | $2,539,432FLAT LINE, INC. | +11.1% |
| Sep 2, 2026 | 6506-24-001 | Debris Removal La Salle, Webb & DimmitLa Salle · Laredo | 2 of 4 | $1,488,846 | $1,244,224TAYLOR BRIDGE LLC | +19.7% |
| Aug 18, 2026 | 6503-18-001 | Tom Green Sweeping FY 27Tom Green · San Angelo | 3 of 4 | $625,670 | $490,191SUNDROP GARDENS LANDSCAPING… | +27.6% |
| Aug 5, 2026 | 6504-94-001 | RMC6504-94-00 Striping Pavement MarkingsLive Oak · Corpus Christi | 3 of 3 | $2,783,031 | $1,742,362TRP INFRASTRUCTURE SERVICES… | +59.7% |
| Aug 5, 2026 | 0916-00-254 | FY 2026 DW Pavement MarkingsNueces · Corpus Christi | 6 of 6 | $6,154,215 | $4,763,993TRP INFRASTRUCTURE SERVICES… | +29.2% |
| Jul 1, 2026 | 0906-00-264 | Non-IH Pavement Markings (2026)Ector · Odessa | 1 of 8 | $5,487,908 | $5,487,908 | Won |
| Jun 2, 2026 | 0915-00-285 | VA: 0915-00-285: TCDBexar · San Antonio | 4 of 9 | $2,915,943 | $2,418,380CENTERLINE TECHNOLOGIES, LLC | +20.6% |
| Apr 21, 2026 | 6497-99-001 | 6497-99-001 Striping CalloutMidland · Odessa | 2 of 6 | $218,680 | $207,027PMI PAVEMENT MARKING, LLC | +5.6% |
| Mar 26, 2026 | 6481-65-001 | PAVEMENT MARKINGS SOUTH FY 26Kimble · San Angelo | 2 of 5 | $291,750 | $199,196L&L COMPANY | +46.5% |
| Mar 26, 2026 | 6497-93-001 | 2026 Debris RemovalTaylor · Abilene | 1 of 4 | $624,648 | $624,648 | Won |
| Mar 24, 2026 | 6480-65-001 | PAVEMENT MARKINGS NORTH FY 26Tom Green · San Angelo | 5 of 6 | $159,596 | $77,856FLAT LINE, INC. | +105.0% |
| Mar 10, 2026 | 6497-99-001 | 6497-99-001 Striping CalloutMidland · Odessa | 1 of 7 | $239,578 | $239,578 | Won |
| Feb 5, 2026 | 0905-00-127 | FY 2026 Striping-LonglineLubbock · Lubbock | 4 of 10 | $7,273,691 | $6,490,125CENTERLINE TECHNOLOGIES, LLC | +12.1% |
| Dec 2, 2025 | 0276-01-048 | HSIP Install Chevrons & RPMMaverick · Laredo | 5 of 5 | $1,894,045 | $1,201,489CENTERLINE TECHNOLOGIES, LLC | +57.6% |
| Dec 2, 2025 | 0924-00-124 | VA FY 2026 STRIPING PROJ (DISTRICTWIDE)El Paso · El Paso | 2 of 4 | $3,275,947 | $2,979,312CENTERLINE TECHNOLOGIES, LLC | +10.0% |
| Oct 28, 2025 | 6492-06-001 | Cleaning and Sweeping for Val VerdeVal Verde · Laredo | 1 of 1 | $363,296 | $363,296 | Won |
| Oct 23, 2025 | 6491-96-001 | Cleaning and Sweeping for MaverickMaverick · Laredo | 1 of 1 | $694,203 | $694,203 | Won |
| Aug 8, 2025 | 0906-00-249 | Non-IH Pavement Markings (2025)Ector · Odessa | 1 of 8 | $2,898,157 | $2,898,157 | Won |
| Apr 8, 2025 | 6481-51-001 | 6481-51-001 Striping CalloutMidland · Odessa | 1 of 6 | $462,533 | $462,533 | Won |
| Mar 11, 2025 | 6477-25-001 | 6477-25-001 Striping CalloutEctor · Odessa | 1 of 7 | $393,225 | $393,225 | Won |
| Feb 7, 2025 | 0922-00-088 | Districtwide PVMTWebb · Laredo | 5 of 9 | $1,824,744 | $1,443,019CENTERLINE TECHNOLOGIES, LLC | +26.5% |
| Aug 22, 2024 | 6471-52-001 | CLEANING AND SWEEPING HIGHWAYSMaverick · Laredo | 1 of 2 | $297,141 | $297,141 | Won |
| Jun 5, 2024 | 6466-68-001 | CLEANING AND SWEEPING HIGHWAYSTom Green · San Angelo | 1 of 3 | $561,373 | $561,373 | Won |
| Mar 6, 2024 | 0906-00-239 | PREVENTIVE MAINTENANCEEctor · Odessa | 3 of 8 | $766,276 | $705,606MIJELUM, L.L.C. | +8.6% |
| Dec 5, 2023 | 6460-37-001 | DEBRIS REMOVALKimble · San Angelo | 2 of 3 | $569,894 | $491,390SWEEPING CORPORATION OF AME… | +16.0% |
| Nov 2, 2023 | 6451-51-001 | SPECIALTY MARKINGSEctor · Odessa | 4 of 7 | $394,015 | $364,627STRIPE-A-ZONE, LLC | +8.1% |
| Oct 6, 2023 | 0907-00-214 | HIGHWAY IMPROVEMENTTom Green · San Angelo | 3 of 6 | $4,196,246 | $3,746,246FLAT LINE, INC. | +12.0% |
| Oct 5, 2023 | 6446-94-001 | DEBRIS REMOVALKimble · San Angelo | 2 of 3 | $648,891 | $643,568AUSTIN BARRICADE COMPANY, L… | +0.8% |
| Aug 3, 2023 | 0909-00-089 | MAINTENANCE & OPERATIONS PROJECTMcLennan · Waco | 2 of 8 | $2,571,923 | $2,409,826D. I. J. CONSTRUCTION, INC. | +6.7% |
| Jun 28, 2023 | 6417-34-001 | SWEEPING AND DEBRIS REMOVALCollin · Dallas | 3 of 3 | $2,339,240 | $883,358DIGG COMMERCIAL, LLC | +164.8% |
| Jun 28, 2023 | 6435-70-001 | CLEANING AND SWEEPING HIGHWAYSDenton · Dallas | 3 of 3 | $2,737,656 | $572,142SWEEPING CORPORATION OF AME… | +378.5% |
| Jun 28, 2023 | 6435-87-001 | CLEANING AND SWEEPING HIGHWAYSEllis · Dallas | 3 of 3 | $1,940,860 | $541,558SWEEPING CORPORATION OF AME… | +258.4% |
| Jun 28, 2023 | 6440-16-001 | SWEEPING AND DEBRIS REMOVALTarrant · Fort Worth | 3 of 3 | $2,842,233 | $1,310,142SWEEPING CORPORATION OF AME… | +116.9% |
| Feb 14, 2023 | 6434-14-001 | REFLECTIVE PAVEMENT MARKINGS (LONG LINE)Pecos · Odessa | 2 of 3 | $252,600 | $247,300L&L COMPANY | +2.1% |
| Feb 2, 2023 | 0905-00-129 | STRIPING-LONGLINELubbock · Lubbock | 2 of 7 | $5,587,889 | $5,367,024CENTERLINE TECHNOLOGIES, LLC | +4.1% |
| Feb 2, 2023 | 6430-50-001 | REFLECTIVE PAVEMENT MARKINGS (LONG LINE)Midland · Odessa | 3 of 6 | $648,600 | $576,500MIJELUM, L.L.C. | +12.5% |
| Feb 2, 2023 | 6431-28-001 | REFLECTIVE PAVEMENT MARKINGS (LONG LINE)Ector · Odessa | 1 of 6 | $421,925 | $421,925 | Won |
| Jan 6, 2023 | 0907-00-199 | HIGHWAY IMPROVEMENTTom Green · San Angelo | 3 of 7 | $2,167,256 | $1,784,037L&L COMPANY | +21.5% |
| Dec 1, 2022 | 6395-44-001 | THERMOPLASTIC PAVEMENT MARKINGSWharton · Yoakum | 8 of 9 | $1,410,252 | $1,050,618HIGHWAY BARRICADES AND SERV… | +34.2% |
| Aug 4, 2022 | 0916-00-224 | HIGHWAY IMPROVEMENTNueces · Corpus Christi | 3 of 8 | $2,686,342 | $2,367,406HIGHWAY BARRICADES AND SERV… | +13.5% |
| Aug 4, 2022 | 6414-07-001 | SWEEPING AND DEBRIS REMOVALHidalgo · Pharr | 2 of 3 | $2,735,249 | $1,762,480SWEEPING CORPORATION OF AME… | +55.2% |
| Jul 21, 2022 | 6406-41-001 | CLEANING AND SWEEPING HIGHWAYSMaverick · Laredo | 1 of 2 | $317,746 | $317,746 | Won |
| May 5, 2022 | 6400-98-001 | CLEANING AND SWEEPING HIGHWAYSTom Green · San Angelo | 1 of 3 | $628,587 | $628,587 | Won |
| Mar 4, 2022 | 0906-00-218 | PREVENTIVE MAINTENANCEEctor · Odessa | 1 of 6 | $866,888 | $866,888 | Won |
| Feb 4, 2022 | 0924-00-106 | PREVENTIVE MAINTENANCEEl Paso · El Paso | 2 of 6 | $3,394,534 | $3,068,481CENTERLINE TECHNOLOGIES, LLC | +10.6% |
| Feb 3, 2022 | 0905-00-104 | STRIPING-LONGLINELubbock · Lubbock | 2 of 6 | $3,846,933 | $3,500,000CENTERLINE TECHNOLOGIES, LLC | +9.9% |
| Jan 6, 2022 | 0907-00-198 | HIGHWAY IMPROVEMENTTom Green · San Angelo | 3 of 7 | $3,168,491 | $2,812,849L&L COMPANY | +12.6% |
| Dec 2, 2021 | 0908-00-109 | PREVENTIVE MAINTENANCETaylor · Abilene | 5 of 9 | $2,621,219 | $2,275,432FLAT LINE, INC. | +15.2% |
| Nov 4, 2021 | 6350-36-001 | DW THERMOPLASTIC PAVEMENT MARKINGSAustin · Yoakum | 4 of 9 | $1,980,728 | $1,672,156STRIPE LINES, INC. | +18.5% |
| Nov 3, 2021 | 6392-44-001 | AGGREGATE (MATERIAL ONLY)El Paso · El Paso | 2 of 4 | $437,892 | $273,001JOBE MATERIALS, L.P. | +60.4% |
| Feb 5, 2021 | 0905-00-103 | HAZARD ELIMINATION & SAFETYLubbock · Lubbock | 5 of 5 | $3,720,590 | $2,185,433L&L COMPANY | +70.2% |
| Oct 1, 2020 | 6365-90-001 | AGGREGATE (MATERIAL ONLY)Brewster · El Paso | 1 of 2 | $566,631 | $566,631 | Won |
| Oct 1, 2020 | 6365-91-001 | AGGREGATE (MATERIAL ONLY)Jeff Davis · El Paso | 1 of 2 | $98,000 | $98,000 | Won |
| Jul 9, 2020 | 0906-00-190 | PAVEMENT MARKINGS (IH)Ector · Odessa | 1 of 8 | $1,449,295 | $1,449,295 | Won |
| Mar 4, 2020 | 0906-00-191 | PAVEMENT MARKINGS (NON-IH)Ector · Odessa | 2 of 7 | $582,213 | $440,357L&L COMPANY | +32.2% |
| Mar 4, 2020 | 0906-00-190 | PAVEMENT MARKINGS (IH)Ector · Odessa | 2 of 7 | $461,097 | $404,942L&L COMPANY | +13.9% |
| Feb 6, 2020 | 0905-00-094 | FY 2020 STRIPINGLubbock · Lubbock | 1 of 7 | $3,964,416 | $3,964,416 | Won |
| Jan 9, 2020 | 6352-40-001 | RETRACE PAVEMENT MARKINGS AND MARKERSReagan · San Angelo | 2 of 6 | $636,289 | $621,296L&L COMPANY | +2.4% |
| Dec 4, 2019 | 0037-05-053 | HAZARD ELIMINATION & SAFETYDimmit · Laredo | 4 of 8 | $546,915 | $492,120TRP CONSTRUCTION GROUP, LLC | +11.1% |
| Aug 7, 2019 | 0005-01-114 | INSTALL MEDIAN BARRIERSEctor · Odessa | 2 of 4 | $9,879,109 | $9,595,982SCR CIVIL CONSTRUCTION, LLC | +3.0% |
| Apr 3, 2019 | 6339-66-001 | STRUCTURE REPAIRUpton · Odessa | 2 of 4 | $659,636 | $619,968SCR CIVIL CONSTRUCTION, LLC | +6.4% |
| Apr 2, 2019 | 0075-03-021 | SAFETY TREAT FIXED OBJECTSPecos · Odessa | 4 of 5 | $558,820 | $329,700RELMCO, INC. | +69.5% |
| Mar 6, 2019 | 0906-00-176 | IH PAVEMENT MARKINGS (2019)Ector · Odessa | 1 of 5 | $395,738 | $395,738 | Won |
| Mar 5, 2019 | 0906-00-177 | NON-IH PAVEMENT MARKINGS (2019)Ector · Odessa | 1 of 5 | $3,767,758 | $3,767,758 | Won |
| Feb 6, 2019 | 0905-00-092 | PAVEMENT MARKERSLubbock · Lubbock | 2 of 4 | $4,775,630 | $4,451,653L&L COMPANY | +7.3% |
| Feb 5, 2019 | 0924-00-100 | FY 2019 STRIPING PROJECTEl Paso · El Paso | 4 of 4 | $2,460,382 | $1,965,160MIJELUM | +25.2% |
| Feb 5, 2019 | 0235-03-034 | PROFILE EDGELINE AND CENTERLINE MARKINGSReal · San Angelo | 2 of 3 | $1,075,188 | $1,009,258TRP CONSTRUCTION GROUP, LLC | +6.5% |
| Feb 5, 2019 | 1842-01-016 | IMPROVE DRAINAGEMartin · Odessa | 2 of 7 | $1,093,040 | $935,181RK HALL, LLC | +16.9% |
| Feb 5, 2019 | 0908-00-088 | FY 2019 TRAFFIC CONTROL DEVICESTaylor · Abilene | 3 of 6 | $2,356,805 | $1,682,111FLAT LINE, INC. | +40.1% |
| Jan 9, 2019 | 0907-00-173 | PAVEMENT MARKINGSTom Green · San Angelo | 1 of 5 | $1,514,295 | $1,514,295 | Won |
| Jan 8, 2019 | 6336-09-001 | MISCELLANEOUS CONCRETEEctor · Odessa | 2 of 3 | $1,524,365 | $1,396,969FNH CONSTRUCTION, LLC | +9.1% |
| Jan 8, 2019 | 6330-82-001 | REPAIR OF ULTRA-THIN WHITE TOPPINGMidland · Odessa | 5 of 5 | $1,565,100 | $778,897O. TREVINO CONSTRUCTION, LLC | +100.9% |
| Nov 7, 2018 | 6335-65-001 | RETRACE PAVEMENT MARKINGS AND MARKERSRunnels · San Angelo | 1 of 7 | $762,761 | $762,761 | Won |
| Nov 6, 2018 | 0906-00-185 | CULVERT/STRUCTURE REPAIREctor · Odessa | 1 of 4 | $1,239,673 | $1,239,673 | Won |
| Nov 6, 2018 | 0922-00-069 | THERMOPLASTIC RE-STRIPINGWebb · Laredo | 1 of 6 | $638,114 | $638,114 | Won |
| Nov 6, 2018 | 0309-01-043 | MILLED EDGELINE & MILLED CENTERLINE RUMBLE STRIPSGray · Amarillo | 3 of 9 | $1,388,333 | $1,357,600SURFACE PREPARATION TECHNOL… | +2.3% |
| Oct 3, 2018 | 0922-00-068 | THERMOPLASTIC RE-STRIPINGWebb · Laredo | 4 of 6 | $673,327 | $630,091L&L COMPANY | +6.9% |
| Aug 8, 2018 | 0017-01-024 | PROFILE EDGELINE/CENTERLINE MARKINGS, ETC.Bexar · San Antonio | 3 of 5 | $1,223,697 | $1,022,882INTERSTATE BARRICADES & MAR… | +19.6% |
| Aug 7, 2018 | 0043-08-075 | INSTALL MEDIAN BARRIERWichita · Wichita Falls | 6 of 7 | $2,348,914 | $2,014,723SCR CIVIL CONSTRUCTION, LLC | +16.6% |
| May 2, 2018 | 0415-01-025 | IMPROVE GUARDRAIL TO STANDARDSJeff Davis · El Paso | 1 of 4 | $340,160 | $340,160 | Won |
| Mar 7, 2018 | 0906-00-161 | IH PAVEMENT MARKINGS_(2018)Ector · Odessa | 1 of 7 | $1,029,976 | $1,029,976 | Won |
| Mar 7, 2018 | 0906-00-159 | NON-IH PAVEMENT MARKINGSEctor · Odessa | 1 of 9 | $1,063,374 | $1,063,374 | Won |
| Mar 6, 2018 | 6326-07-001 | BRIDGE REPAIRTerrell · Odessa | 8 of 8 | $654,291 | $469,676O. TREVINO CONSTRUCTION, LLC | +39.3% |
| Feb 1, 2018 | 0905-00-073 | PAVEMENT MARKERSLubbock · Lubbock | 4 of 5 | $3,892,218 | $2,938,105L&L COMPANY | +32.5% |
| Feb 1, 2018 | 0924-00-098 | FY 2018 STRIPING PROJECTEl Paso · El Paso | 3 of 5 | $1,026,493 | $783,671PMI PAVEMENT MARKING, INC. | +31.0% |
| Jan 9, 2018 | 6324-30-001 | CULVERT REPAIRPecos · Odessa | 1 of 5 | $322,218 | $322,218 | Won |
| Dec 5, 2017 | 0907-00-167 | PAVEMENT MARKINGSTom Green · San Angelo | 3 of 11 | $767,131 | $689,377L&L COMPANY | +11.3% |
| Dec 5, 2017 | 6324-20-001 | RETRACE PAVEMENT MARKINGS AND MARKERSTom Green · San Angelo | 2 of 10 | $368,913 | $341,836FLAT LINE, INC. | +7.9% |
| Sep 7, 2017 | 6317-15-001 | METAL BEAM GUARDRAIL REPAIREl Paso · El Paso | 1 of 2 | $684,590 | $684,590 | Won |
| Jul 12, 2017 | 0003-01-057 | INSTALL MEDIAN BARRIERCulberson · El Paso | 5 of 5 | $1,377,635 | $957,145DAN WILLIAMS COMPANY | +43.9% |
| Apr 5, 2017 | 0233-01-044 | MODERNIZE BRIDGE RAIL/APR GUARDRAIL, ETC.Culberson · El Paso | 1 of 6 | $3,783,684 | $3,783,684 | Won |
| Apr 4, 2017 | 0006-04-079 | INSTALL PAVEMENT MARKINGSTaylor · Abilene | 3 of 8 | $1,562,581 | $1,158,772L&L COMPANY | +34.8% |
| Mar 8, 2017 | 0906-00-156 | NON-IH PAVEMENT MARKINGEctor · Odessa | 2 of 7 | $982,593 | $960,041L&L COMPANY | +2.3% |
| Mar 7, 2017 | 0906-00-173 | IH PAVEMENT MARKINGEctor · Odessa | 3 of 10 | $593,976 | $524,247L&L COMPANY | +13.3% |
| Mar 7, 2017 | 6307-93-001 | INSTALLATION OF PAVEMENT MARKINGSHoward · Abilene | 3 of 9 | $1,484,168 | $1,236,661L&L COMPANY | +20.0% |
| Mar 7, 2017 | 6311-87-001 | TOTAL REST AREA MAINTENANCENolan · Abilene | 5 of 7 | $6,480,000 | $5,496,618DEANGELO BROTHERS LLC | +17.9% |
| Feb 3, 2017 | 0905-00-082 | PAVEMENT MARKERSLubbock · Lubbock | 5 of 7 | $4,539,664 | $3,492,692STRIPE-A-ZONE, INC. | +30.0% |
| Jan 4, 2017 | 0907-00-166 | PAVEMENT MARKINGSTom Green · San Angelo | 2 of 9 | $511,692 | $506,111FLAT LINE, INC. | +1.1% |
| Oct 9, 2013 | 0005-01-105 | PROFILE PAVEMENT MARKERSEctor · Odessa | 5 of 8 | $1,653,898 | $1,504,555FLAT LINE, INC. | +9.9% |
Active prime contracts 3
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 6492-06-001Let Oct 28, 2025 | Val VerdeLaredo · US0277 | MAINTENANCE | $363,296 | 33% | |
| 6491-96-001Let Oct 23, 2025 | MaverickLaredo · US0277 | MAINTENANCE | $694,203 | 52% | |
| 6477-25-001Let Mar 11, 2025 | EctorOdessa · IH0020 | MAINTENANCE | $1,190,951 | 80% |
Subcontracts on active jobs 1
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0163-03-053Let Dec 2, 2025 | RONALD R. WAGNER & CO., LP | HendersonTyler | HAZARD ELIMINATION & SAFETY | 24.86% | $4,902,954 |