FY 26 LAO Hot Mix
6495-32-001 · let Dec 17, 2025 · Liberty, Beaumont · Material Maintenance Project - Sealed
$458,000Low bid: TEXAS MATERIALS GROUP, INC.-20.1% vs estimate $573,000
$9,300Left on the table2.0% gap to the second bid
2BiddersSpread 2% low to high
7Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | TEXAS MATERIALS GROUP, INC. | $458,000 | -20.1% | $9,300 | 0 | 0 | |
| 2 | AMERICAN MATERIALS, INC. | $467,300 | +2.0% | -18.4% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
TEXAS MATERIALS GROUP, INC. vs AMERICAN MATERIALS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8011-7146 D-GR HMA TY D PG 70-22 (DEL) SITE 1 | 1,500 TON | $111.00 | $115.00 | $117.96 | $6,000 |
| 8011-7147 D-GR HMA TY D PG 70-22 (DEL) SITE 2 | 1,500 TON | $113.00 | $115.00 | $142.41 | $3,000 |
| 8011-7145 D-GR HMA TY D PG 70-22 (PICKUP) | 500 TON | $96.00 | $99.00 | $111.44 | $1,500 |
| 8011-7001 D-GR HMA TY B PG 64-22 (PICKUP) | 200 TON | $90.00 | $85.00 | $69.58 | -$1,000 |
| 8011-7127 D-GR HMA TY C PG 70-22 (PICKUP) | 200 TON | $96.00 | $99.00 | $120.25 | $600 |
| 8011-7037 D-GR HMA TY C PG 64-22 (PICKUP) | 200 TON | $92.00 | $90.00 | $82.72 | -$400 |
| 8011-7055 D-GR HMA TY D PG 64-22 (PICKUP) | 200 TON | $92.00 | $90.00 | $89.12 | -$400 |
Positive: the low bidder was cheaper on that item. These 7 items account for $9,300 of the $9,300 gap.