FY27 Crosby/Floyd ROW Mowing
6510-24-001 · let Sep 29, 2026 · Crosby, Lubbock · Routine Maintenance Project - Sealed
$595,302Low bid: KENNETH THOMASON-13.7% vs estimate $689,620
$43,986Left on the table7.4% gap to the second bid
5BiddersSpread 23% low to high
3Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | KENNETH THOMASON | $595,302 | -13.7% | $43,986 | 0 | 0 | |
| 2 | TEXAS BLACKTOPS LLC | $639,288 | +7.4% | -7.3% | $49,046 | 0 | 0 |
| 3 | K2 PRIME LLC | $688,334 | +15.6% | -0.2% | $1,329 | 2+$15,760 | 0 |
| 4 | BOEN LANDSCAPING & IRRIGATION, LLC | $689,663 | +15.9% | 0.0% | $43,192 | 0 | 0 |
| 5 | ABESCAPE LANDSCAPING, LLC | $732,855 | +23.1% | 6.3% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
KENNETH THOMASON vs TEXAS BLACKTOPS LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 730-7022 FULL - WIDTH MOWING | 19,372 AC | $30.73 | $33.00 | $38.53 | $43,974 |
| 505-7003 TMA (MOBILE OPERATION) | 8 DAY | $0.0010 | $1.00 | $229.60 | $8 |
| 500-7002 MOBILIZATION (CALLOUT) | 4 EA | $0.0010 | $1.00 | $600.85 | $4 |
Positive: the low bidder was cheaper on that item. These 3 items account for $43,986 of the $43,986 gap.